If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24664 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-81.17,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Washington Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001067 | |
| Farm/Lease Name: JACOBS 211061 | |
| License Status: Producing | |
| License Date: 2016-07-15 | |
| Spud Date: 2016-09-08 | |
| Spud Drilling Contractor: H&P DRILLING | |
| Final Drill Date: 2016-10-11 | |
| Well Total Depth: 18587.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.670000 | |
| Longitude: -81.170000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2016-07-15 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:7/15/2016, Expired Date:7/15/2018 12:00:00 PM, Drilling unit acres:279.662, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2016-10-11 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
| Correction to Well | 2017-07-21 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 7-11-17 ALE |
| Completion Report Received | 2017-11-21 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
| Record Last Modified | 2017-11-22 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
| Construction Permit Expires | 2018-07-15 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2017-11-20 | 11645 | 11786 | 50 |
| 2017-11-20 | 18261 | 18420 | 40 |
| 18261 | 18420 | 40 | |
| 11645 | 11786 | 50 | |
| 11645 | 11786 | 50 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 04/25/2017 | 04/25/2017 | 9194 | 21,864,200.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.8263 | 182,009,000.0 |
| HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
| Scalecheck LP-70 | Halliburton Energy Services, Inc. | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 0.0759826 | 157465 | |
| Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.352475 | 730461 | |
| MC B-8614 | Multi-Chem Group LLC | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0238008 | 49325 | ||||
| Methanol | 67-56-1 | 60 | 0.000705826 | 1463 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 1.10053 | 2,280,700.0 | ||||
| Aluminum oxide | 1344-28-1 | 5 | 0.525267 | 1,088,550.0 | ||||
| Quatemary ammonium compounds, benzyl-C12-16-alkyldimethyl,
chlorides |
68424-85-1 | 5 | 0.00220923 | 4579 | ||||
| Inorganic Salt | Proprietary | 30 | 0.0238008 | 49325 | ||||
| Ethylene glycol | 107-21-1 | 60 | 0.0088365 | 18313 | ||||
| Hydrochloric acid | 7647-01-0 | 15 | 0.0388076 | 80425.2 | ||||
| Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000352913 | 732 | ||||
| Titanium dioxide | 13463-67-7 | 1 | 0.105053 | 217710 | ||||
| Fatty acids, tall oil | Proprietary | 30 | 0.000352913 | 732 | ||||
| Olefins | Proprietary | 5 | 0.000141165 | 294 | ||||
| Glutaraldehyde | 111-30-8 | 30 | 0.0132554 | 27471 | ||||
| Propargyl alcohol | 107-19-7 | 10 | 0.000117638 | 244 | ||||
| Iron oxide | 1309-37-1 | 1 | 0.105053 | 217710 | ||||
| Sintered bauxite | 1318-16-7 | 100 | 10.5053 | 21,771,000.0 | ||||
| Crystalline silica, cristobalite | 14464-46-1 | 5 | 0.525267 | 1,088,550.0 | ||||
| Aluminum silicate | 1302-76-7 | 10 | 1.05053 | 2,177,100.0 | ||||
| Ethoxylated alcohols | Proprietary | 30 | 0.000352913 | 732 | ||||
| FR-76 | Halliburton Energy Services, Inc | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| PROP-PREMIUM-40/70, 3200 LB SACK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2017-04-14 | H2O | 15 | 10115 Bbl | 499980 | Halliburton | STAGE 38/38
STAGES 2-37 SEE IMAGES |
| 2017-04-04 | H2O | 15 | 10646 Bbl | 499680 | Halliburton | STAGE 1/38
STAGES 2-37 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | GULFPORT ENERGY CORPORATION | 4241165 | 0 | 250 |
| 2018 | GULFPORT ENERGY CORPORATION | 3409157 | 0 | 363 |
| 2019 | GULFPORT ENERGY CORPORATION | 557360 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 48092 | 250 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 31802 | 363 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 4577 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2142532755 | 2016-10-6 0:00: | DD | No Violations | 1.00 |
| -250402340 | 2017-6-27 0:00: | PL | No Violations | 1.00 |
| -328800570 | 2016-11-7 0:00: | PL | No Violations | 1.00 |
| -604903040 | 2020-5-29 0:00: | PW | No Violations | 1.00 |
| 0250402340 | 2017-06-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check found the area affected by the well site construction has vegetation established and erosion control in place. There is one producing well on the pad with a tubing head installed and the production valve in the open position. Annular monitoring is in place. The well is selling into a gas processing unit and then flows off site to a midstream processing facility owned by Rice Energy. Also situated on the well pad is a production facility consisting of (4) steel 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The well pad perimeter earthen berm is in good repair. There is signage posted at the well pad entrance and at the well head. The company has also installed emergency shut down devices at the well head and the production facility along with at the well pad entrance. |
| 0328800570 | 2016-11-07 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well has been drilled and is awaiting completion. |
| 0867536331 | 2018-03-05 | Production Wells | No Violations | Producing well status check inspection found the well head designed to produce from the tubing well head above the B-Section and casing head section. In the tubing section vertically there is a total of (2) manually operated valves then the tubing flow cross, attached to the tubing flow cross downstream is a third manual valve then a Emergency Shut Down (ESD) valve with remotely controlled switches at multiple locations on location including at the well head and gas processing unit along with the production facility and entry point of the location. The said well has annular pressure gauges in place with the valves in the open position. The annular pressure between the 13.375 casing and 9.625casing reads 0 psi and between the 9.625 casing and the 5.5 casing 750 psi. Addressing the well support equipment on location- at the entry point of the location is a midstream operation operated by EQT Company, on the left hand side of the well pad is a gas processing unit At the right rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks each with a total fluid volume of 400 barrels capacity, the tanks are situated inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm. Proper well identification is posted at the well and the tank battery as well as the entry point of the lease road and well pad. |
| 1346809680 | 2017-04-10 | Completion Testing | No Violations | Status check inspection on the well stimulation process found Halliburton Stimulation service on location and stimulation stage 22 of 49 total stages to be stimulated. The stage was perforated by Renegade Wireline service with a completion plug set at 14,308 and the well perforated between the depths of 14,308 and 14,147 with 50 perforations shot in 5 clusters. Red Dirt Energys 15,000 psi completion isolation stack is being used. The well pad perimeter earthen berm is being used as primary containment with the drain valves in the closed position and all stimulation equipment is placed on polymer containment. |
| 1448567748 | 2016-12-21 | Completion Testing | No Violations | Status check inspection found the well drilling process complete and toe prep complete. The well is awaiting stimulation. |
| 1474705858 | 2016-09-24 | Casing String Witnessed | No Violations | 09/24/16- H&P 628 is on location and has drilled a 17.5 surface borehole to a measured depth of 1,220 with 13.375 casing ran and set to a depth of 1,220 with a guide shoe- float collar and 12 centralizers casing equipment ran. Stingray Cement service cemented the casing using 1,220 sacks of class A cement with the cement weight verified by weight of scale and 1,063 sacks of class A cement ran with 25 barrels of 6% gel spacer ran ahead of the cement and circulation established to surface prior to cementing. The cement was displaced to the float collar with 179 barrels of fluid with the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug. Cement returns were witnessed to surface inside the cellar and the cement level left at 5 in the cellar to create a liquid tight cellar. |
| 2142532755 | 2016-10-06 | Drill / Deepen / Reopen | No Violations | |
| 867536331 | 2018-3-5 0:00:0 | PW | No Violations | 0.60 |
For data sources see[10]