If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24665 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.78,"lon":-80.88,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Salem Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001390 | |
Farm/Lease Name: MOSER C | |
License Status: Producing | |
License Date: 2016-08-15 | |
Spud Date: 2016-10-31 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2016-11-23 | |
Well Total Depth: 19350.00 ft | |
Configuration: Horizontal | |
Latitude: 39.780000 | |
Longitude: -80.880000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Correction to Well | 2016-01-06 | UPDATE ACREAGE PER REVISED PLAT-ALE |
APP | 2016-07-21 | Proposed Formations:TRENTON, Issued Date:7/21/2016, Expired Date:7/21/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class: |
APP | 2016-08-15 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:8/15/2016, Expired Date:8/15/2018 12:00:00 PM, Drilling unit acres:702.859, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-11-23 | |
Correction to Well | 2017-03-24 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE |
Completion Report Received | 2017-07-14 | |
Record Last Modified | 2018-02-22 | |
Construction Permit Expires | 2018-08-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-08-23 | 11316 | 11481 | 36 |
2017-08-23 | 19091 | 19195 | 27 |
19091 | 19195 | 27 | |
11316 | 11481 | 36 | |
11316 | 11481 | 36 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/22/2017 | 04/27/2017 | 10744 | 20,359,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HP-9601 | OneAqua Source | Additive | Listed Below | Listed Below | 0 | 0 | 0 |
SAND-PREMIUM WHITE-30/50 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.237332 | 461540 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
MB-7530 | OneAqua Source | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
Hexamethylenetetramine | 100-97-0 | 2 | 0.00700231 | 13618 | ||||
Ethanol | 64-17-5 | 60 | 0.000109192 | 213 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00005373 | 105 | ||||
Sodium Hydroxide | 1310-73-2 | 4 | 0.000926099 | 1801 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00108274 | 2106 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.0623 | 23,457,500.0 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00005373 | 105 | ||||
Phenol / formaldehyde resin | 9003-35-4 | 5 | 0.0175058 | 34044 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.00005460 | 107 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00000910 | 18 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 18 | 0.0077221 | 15018 | ||||
Naphthalene | 91-20-3 | 5 | 0.00000910 | 18 | ||||
Acetic acid | 64-19-7 | 60 | 0.000649642 | 1264 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000182 | 4 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.00195814 | 3808 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00001791 | 35 | ||||
Methanol | 67-56-1 | 60 | 0.000107452 | 209 | ||||
Olefins | Proprietary | 5 | 0.00002149 | 44 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0356 | 69231 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.000643509 | 1252 | ||||
Dazomet | 533-74-4 | 24 | 0.00555659 | 10806 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00005373 | 105 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.00007279 | 143 | ||||
Organic phosphate copolymer | 71050-62-9 | 25 | 0.00313516 | 6097 | ||||
SAND-CRC PREMIUM-30/50 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 82.092 | 159,644,000.0 | |
Water | 7732-18-5 | 100 | 5.52643 | 10,747,300.0 | ||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2814 | OneAqua Source | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-04-27 | H2O | 15 | 515403 Gal | 572600 | Halliburton | STAGE 37/37
STAGES 2-36 SEE IMAGES |
2017-03-22 | H2O | 15 | 482511 Gal | 518900 | Halliburton | STAGE 1/37
STAGES 2-36 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 3530791 | 0 | 211 |
2018 | ECLIPSE RESOURCES I LP | 2434693 | 0 | 362 |
2019 | ECLIPSE RESOURCES I LP | 299293 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 56528 | 211 |
2018 | ECLIPSE RESOURCES I LP | Brine | 33390 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 4332 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1076914013 | 2020-4-17 0:00: | PW | No Violations | 0.30 |
-19647774 | 2016-11-21 0:00 | DD | No Violations | 0.50 |
-881537799 | 2016-7-28 0:00: | CS | No Violations | |
0019647774 | 2016-11-21 | Drill / Deepen / Reopen | No Violations | During my inspection the H&P 531 rig was tripping the drill pipe out of hole after reaching the total depth of the well at 19350 feet. Cementing the 5.5 inch diameter production casing is projected to happen Wednesday morning (11/23/16). |
0069228208 | 2016-11-04 | Drill / Deepen / Reopen | No Violations | During my inspection H&P 531 was drilling at a depth of 2800 feet in the 12.25 inch diameter borehole. |
0762889034 | 2017-08-31 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with the area affected by the well pad construction restored and vegetation established. The well pad perimeter is fenced with a 8 chain link fence and signage posted at the well pad entrance as well as at each well head and at the tank battery. Emergency shut down devices are located at the well pad entrance the tank battery and Gas processing units and also inside the remote transmission unit building, and finally at the well head. On location a total of (8) wells are present with all wells drilled- stimulated and completed with the production valves in the open position at the well head. Also present on the well heads is annular pressure monitoring gauges with 100 pounds pressure showing between the 13.375 and 9.625, and 750 psi between the 5.5 and 9.625. The company is monitoring and addressing any annular pressure. On the South side of the well pad is the production facility consisting of a total of (4) steel construction production tanks with a total of 400 barrels fluid capacity each. On the East side of the well pad is the production filtration and separation equipment consisting of a total of (8) gas processing units and (2 )dehydration units. Directly on the North East side of the well pad is the gas distribution point where the gas product is transferred over to Eureka Midstream. |
0881537799 | 2016-07-28 | Casing String Witnessed | No Violations | On site inspection to witness the conductor casing cement job. Precision Rat hole has drilled a 36 x 120 conductor borehole with no surface water encountered. 120 of 30 x .375 wall with weld connections conductor pipe was ran. Universal Well Service cement company cemented the casing using 340 sacks of Type 1 cement with circulation established and 10 barrels of 6% gel ran ahead of he cement. Cement returns were witnessed at 75 barrels into a total of 87 barrels of fresh water displacement with cement visible inside the cellar and cement staying up to surface level. |
1479314800 | 2016-11-16 | Drill / Deepen / Reopen | No Violations | During my inspection the HP 531 drilling rig was drilling the 8.75 inch diameter borehole at a depth of 11,800 feet. |
69228208 | 2016-11-4 0:00: | DD | No Violations | 1.00 |
762889034 | 2017-8-31 0:00: | PL | No Violations | 0.50 |
For data sources see[10]