Well Details

Well ID: 34-111-24698
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Sunsbury Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001420
Farm/Lease Name: ARNOLD 21600
License Status: Producing
License Date: 2016-12-13
Spud Date: 2016-12-15
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2017-04-24
Well Total Depth: 21230.00 ft
Configuration: Horizontal
Latitude: 39.820000
Longitude: -80.970000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-13 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/13/2016, Expired Date:12/13/2018 12:00:00 PM, Drilling unit acres:509.071, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2017-04-24
Correction to Well 2018-03-30 UPDATE TARGET/TAKE PER SAD-DRILLED PLAT
Completion Report Received 2018-07-13
Record Last Modified 2018-08-02
Construction Permit Expires 2018-12-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-02 10657 10824 0
2018-08-02 20907 21067 0
20907 21067 0
10657 10824 0
10657 10824 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/27/2018 04/10/2018 10138 15,714,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (40/70 Mesh Proppant) Muskie Proppant Silica Substrate 14808-60-7 100 8.3733 12,205,900.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 55 0.00829108 12086.1
2-Propyn-1-ol 107-19-7 5 0.00007172 104.55
2-Ethylhexanol 104-76-7 10 0.000143443 209.1
Didecyldimethylammonium Chloride 7173-51-5 8 0.00257018 3746.6
Fatty acids, tall oil 61790-12-3 5 0.00007172 104.55
Olefin Proprietary 5 0.00007172 104.55
Methanol 67-56-1 35 0.000502052 731.849
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007172 104.55
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.001767 2575.79
Coconut oil acid diethanolamine 68603-42-9 5 0.00007172 104.55
Water 7732-18-5 60 0.0192764 28099.5
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.00129029 1880.89
Water 7732-18-5 72 0.166939 243350
Oleic Acid Diethanolamide 93-83-4 1.5 0.00129029 1880.89
Ammonium Chloride 12125-02-9 2 0.00172039 2507.85
Water 7732-18-5 60 0.0516118 75235.4
Ethanol 64-17-5 2 0.000642546 936.65
Bio B2512 Aquaserv Biocide Water 7732-18-5 60 0.0192764 28099.5
Glutaraldehyde 111-30-8 27 0.00867437 12644.8
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.001767 2575.79
Ethanol 64-17-5 2 0.000642546 936.65
Didecyldimethylammonium Chloride 7173-51-5 8 0.00257018 3746.6
NEFE-180 Chemplex SOLVAY Corrosion Inhibitor/Iron Control Methanol 67-56-1 35 0.000502052 731.849
Olefin Proprietary 5 0.00007172 104.55
2-Ethylhexanol 104-76-7 10 0.000143443 209.1
Fatty acids, tall oil 61790-12-3 5 0.00007172 104.55
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007172 104.55
Coconut oil acid diethanolamine 68603-42-9 5 0.00007172 104.55
2-Propyn-1-ol 107-19-7 5 0.00007172 104.55
Acetic acid 64-19-7 65 0.000932382 1359.15
Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 89.9607 131,137,000.0
Plexslick 957 Chemplex Friction Reducer Water 7732-18-5 60 0.0516118 75235.4
Ammonium Chloride 12125-02-9 2 0.00172039 2507.85
Petroleum Distillate 64742-47-8 20 0.0172039 25078.5
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.00129029 1880.89
Oleic Acid Diethanolamide 93-83-4 1.5 0.00129029 1880.89
SI-20W Moon Scale Inhibitor Phosphinocarboxylic Acid 110224-99-2 45 0.00678361 9888.59
Water 7732-18-5 55 0.00829108 12086.1
Sand (100 Mesh Proppant) Muskie Proppant Silica Substrate 14808-60-7 100 1.29949 1,894,290.0
Hydrochloric Acid (28%) Dover Acidizing Water 7732-18-5 72 0.166939 243350
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0649208 94636.2

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-04-10 H2O 10 6827 Bbl 280360 STINGRAY PRESSURE PUMPING LLC STAGE 50 OF 50 SEE IMAGES FOR STAGES 2-49
2018-03-28 H2O 15 8133 Bbl 375080 STINGRAY PRESSURE PUMPING LLC STAGE 1 OF 50

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 GULFPORT ENERGY CORPORATION 3277701 0 220
2019 GULFPORT ENERGY CORPORATION 1027881 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 GULFPORT ENERGY CORPORATION Brine 54707 220
2019 GULFPORT ENERGY CORPORATION Brine 12567 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1056092488 2017-4-4 0:00:0 DD No Violations 1.10
-1087833046 2020-4-10 0:00: PW No Violations 0.30
-1341806248 2018-4-24 0:00: CT No Violations 0.50
1056092488 2017-04-04 Drill / Deepen / Reopen No Violations Status check inspection to document Nomac Drilling rig 137 is skidding over to the well and will spud the well drilling a 24 surface borehole to an approximate depth of 700. 18.625 diameter 87.50 pound per foot casing will be ran and set in the well bore. Stingray Cement Service shall cement the casing using 216 barrel 1012 proposed class A cement mix with 30% open hole cement.
1341806248 2018-04-24 Completion Testing No Violations Status check inspection found the well drilling and completion process complete and a workover rig on location owned by Hybrid Drilling currently drilling out the completion plugs on the # 4 well on location with the said well (the # 5) left to complete. The well head assembly is a Cactus Well head and the tubing head will be a 15,000 (psi) pound per square inch rated tubing flow cross assembly consisting of 3 manual valves and an emergency shut down valve capable of being remotely operated by design when final hook up of the production equipment is complete. The well head A&B sections have double valves installed on both the outlet ports and flow line risers above grade level inside the cellars with pressure gauges installed to monitor annular pressures. The company is monitoring and recording all annular pressures daily.
1482413557 2016-12-16 Casing String Witnessed No Violations I was on location to witness Stingray Cementing LLC set a 26 inch diameter conductor inside a 32 inch diameter hole. When I arrived on location Gulfport was setting another conductor in the second hole on site. Gulfport was planning on cementing that day and, Gulfports Company man on site Nick Berelsman made the decision to wait until it was fully set to pump both one after the other. When Stingray finally rigged up to pump this well we ran the pressure test on Stingrays lines and it pressured up. We found the lines to have frozen over inside and needed to be changed out. After Stingray changed out their lines they ran a 15 barrel freshwater gel and 10 barrels of freshwater ahead of the cement. Stingray then ran 60 barrels of cement and, finished up by displacing the cement with 62 barrels of fresh water. Stingray circulated 20 barrels of cement back to surface. Stingray used 280 sacks of class A cement with 3% CaCL2, and .25 parts per sack of celluseal. The cement weight 15.6 pounds per gallon and had a yield of 1.21.
1491493548 2017-04-06 Casing String Witnessed No Violations 5:00 AM-On site inspection to witness the surface casing cement job with Nomac Drilling rig 137 on location along with Stingray Cement Service. The rig has drilled a 24 surface borehole to a measured depth of 720, the coal seam was marked at 587 to 593. The rig has installed 719 of 18.625 diameter 87.5 lb/ft J-55 grade casing with a guide shoe and float collar casing equipment ran along with 7 centralizers. The casing was cemented by Stingray Cement Service with 25 barrels of 6% gel spacer ran ahead of the cement followed by a 218 barrel class A cement slurry consisting of 1025 sacks of cement with 1.5% calcium and 0.025 pound per sack celluseal. The cement was displaced with 208 barrels of fresh water and the casing was pressure tested to932 psi total or 500 psi over displacement pressure upon the landing of the cement plug. Cement weight was verified by weight of scale 3 times throughout the job. 40 barrels of cement returns were witnessed to surface. Off location 12:00 pm.
1526929379 2018-05-21 Completion Testing No Violations Status check inspection on the well completion process found a total of 5 wells on the well pad and all 5 have had the drilling - stimulation and completion process stages completed. All wells have 2.875 production tubing set in the well bore. All production equipment is set and the wells are awaiting the initial flow back stages. A flow back company is on site identified as J&A Service, the company has flow back iron plumbed into each well head and is currently pressure testing their equipment to 8,000 pound per square inch working pressure before commencing the initial flow back production operations in the next 24 hours. All well bore annular pressure is being monitored and is being addressed accordingly with pressure reducing valves set to release pressure above line pressure of 1,000 psi.