If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24758 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.71,"lon":-80.84,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Ohio Township | |
| Operator Name: TRIAD HUNTER LLC | |
| Well Pad ID: US-OH-000561 | |
| Farm/Lease Name: ORMET | |
| License Status: Producing | |
| License Date: 2017-06-29 | |
| Spud Date: 2017-09-06 | |
| Spud Drilling Contractor: H&P DRILLING | |
| Final Drill Date: 2018-10-01 | |
| Well Total Depth: 19145.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.710000 | |
| Longitude: -80.840000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2017-06-29 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/29/2017, Expired Date:6/29/2019 12:00:00 PM, Drilling unit acres:800.9, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Correction to Well | 2018-03-09 | CORRECTION TO UNIT SIZE AND TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. |
| Reached Total Depth | 2018-10-01 | |
| Completion Report Received | 2019-01-10 | |
| Record Last Modified | 2019-01-24 | |
| Correction to Well | 2019-01-25 | UPDATE TAKE/TARGET PER AS-DRILLED PLAT |
| Construction Permit Expires | 2019-06-29 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2019-01-11 | 11418 | 11525 | 0 |
| 2019-01-11 | 18978 | 19085 | 0 |
| 18978 | 19085 | 0 | |
| 11418 | 11525 | 0 | |
| 11418 | 11525 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 07/21/2018 | 08/23/2018 | 10493 | 16,320,800.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 44.3 | 0.0061371 | 9585.15 |
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.000114335 | 178.573 | ||||
| 2-Ethylhexanol | 104-76-7 | 10 | 0.000228671 | 357.147 | ||||
| Water | 7732-18-5 | 75 | 0.0473013 | 73877 | ||||
| Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.000946026 | 1477.54 | ||||
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.000114335 | 178.573 | ||||
| Alcohols, C14-15, ethoxylated | 68551-12-2 | 1.5 | 0.000946026 | 1477.54 | ||||
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.000114335 | 178.573 | ||||
| Water | 7732-18-5 | 55 | 0.012219 | 19084.2 | ||||
| Methanol | 67-56-1 | 40 | 0.000914683 | 1428.59 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.000114335 | 178.573 | ||||
| Water | 7732-18-5 | 64 | 0.245967 | 384161 | ||||
| Ammonium Chloride ((NH4)Cl) | 12125-02-9 | 2 | 0.00126137 | 1970.05 | ||||
| Polyethylene glycol | 25322-68-3 | 50 | 0.00692674 | 10818.5 | ||||
| Phenolic Resin | 9003-35-4 | 0.5 | 0.00184584 | 2882.9 | ||||
| Plexslick 957 | Solvay | Friction Reducer | Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.000946026 | 1477.54 | |
| Alcohols, C14-15, ethoxylated | 68551-12-2 | 1.5 | 0.000946026 | 1477.54 | ||||
| Water | 7732-18-5 | 75 | 0.0473013 | 73877 | ||||
| Ammonium Chloride ((NH4)Cl) | 12125-02-9 | 2 | 0.00126137 | 1970.05 | ||||
| Petroleum Distillate | 64742-47-8 | 20 | 0.0126137 | 19700.5 | ||||
| SI-20 | Moon | Scale inhibitor | Phosphinocarboxylic Acid | 110224-99-2 | 45 | 0.0099974 | 15614.3 | |
| Water | 7732-18-5 | 55 | 0.012219 | 19084.2 | ||||
| Sand (40/70 Proppant) | US Silica | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.9634 | 17,123,100.0 | |
| Sand (40/70 Resin Proppant) | US Silica | Proppant | Phenolic Resin | 9003-35-4 | 0.5 | 0.00184584 | 2882.9 | |
| Silica Substrate | 14808-60-7 | 99.5 | 0.367322 | 573697 | ||||
| Hydrochloric Acid (28%) | Solvay | Acidizing | Water | 7732-18-5 | 64 | 0.245967 | 384161 | |
| Hydrochloric Acid (Hydrogen Chloride) | 7732-18-5 | 36 | 0.138356 | 216090 | ||||
| NEFE-180 | Solvay | Corrosion Inhibitor/Iron Control | Acetic acid | 64-19-7 | 89 | 0.00203517 | 3178.61 | |
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.000114335 | 178.573 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.000114335 | 178.573 | ||||
| Methanol | 67-56-1 | 40 | 0.000914683 | 1428.59 | ||||
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.000114335 | 178.573 | ||||
| 2-Ethylhexanol | 104-76-7 | 10 | 0.000228671 | 357.147 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.000114335 | 178.573 | ||||
| Water | Blue Ridge Mountain Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.2032 | 136,197,000.0 | |
| Sand (100 Mesh Proppant) | US Silica | Proppant | Silica Substrate | 14808-60-7 | 100 | 0.978501 | 1,528,260.0 | |
| K-BAC 1005 | WST | Biocide | Polyethylene glycol | 25322-68-3 | 50 | 0.00692674 | 10818.5 | |
| Water | 7732-18-5 | 44.3 | 0.0061371 | 9585.15 | ||||
| 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.000797961 | 1246.29 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2018-08-23 | H2O | 15 | 6348 Bbl | 350020 | STINGRAY PRESSURE PUMPING LLC | STAGE 55/55
STAGES 2-54 SEE IMAGES |
| 2018-07-21 | H2O | 15 | 7551 Bbl | 352660 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/55
STAGES 2-54 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | TRIAD HUNTER LLC | 1416403 | 0 | 92 |
| 2019 | TRIAD HUNTER LLC | 1262273 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | TRIAD HUNTER LLC | Brine | 40504 | 92 |
| 2019 | TRIAD HUNTER LLC | Brine | 19730 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1284649700 | 2018-8-16 0:00: | CT | No Violations | 0.30 |
| -1318797420 | 2018-11-13 0:00 | PL | No Violations | 0.30 |
| -1990765219 | 2018-8-2 0:00:0 | CT | No Violations | 0.50 |
| 1284649700 | 2018-08-16 | Completion Testing | No Violations | Status check inspection on the well completion process found Stingray Pressure pumping service on location stimulating the well along with Allied Horizontal wireline service. The company has just completed stimulating stage 27 and wireline is perforating stage 28. The stage was perforated between the depths of 15,465 and 15,336. The stage was perforated with 4 cluster of 36 perforations total. A completion plug was set at 15,465. All annulis are being monitored and the 5.5 x 9.625 diameter casing well head section electronic gauge shows 569 psi currently. Stage 27 stimulated had an average pump rate of 85 barrels per minute with an average treating pressure of 10,322 pounds per square inch. The initial shut in pressure was 7,563 psi. |
| 1318797420 | 2018-11-13 | Preliminary Restoration | No Violations | Preliminary restoration status check inspection found crews on site from Beaver Excavating repairing areas of the pad surface. The crews have dug down in 3 different areas approximately 6 to 8 and removed the surface material. New material is being brought in. The perimeter area of the pad has vegetation established. There are 2 well pad side by side at this location. There are 4 wells present and in production on the said well pad. All 4 wells are constructed in the same manner and in production with production trees present on each well. The said well has riser pipes with valves and gauges present attached to the well head A&B sections. The A section gauge which monitors the pressure between the 9.625 and 13.375 diameter well head sections shows 100 pounds pressure. The B section gauge which monitors the pressure between the 5.5 and 9.625 casing strings shows 750 pounds pressure. The 5.5 diameter casing internal pressure is 6,000 pounds per square inch (psi). The production facility consists of (3) steel construction 500 barrel capacity tanks situated inside a polymer lined steel containment dike area. Also present is (4) gas processing units along with a contact tower and glycol heater. Proper identification is posted. |
| 1504883285 | 2017-09-08 | Casing String Witnessed | No Violations | Status check inspection to witness the conductor casing cement job found Express Energys drilling rig on the hole. The rig has drilled a 26 diameter conductor borehole to a measured depth of 135 from ground level elevation with fresh water encountered at 20 while drilling and the static fluid level observed at 20 prior to cementing. The casing was cemented with a 54 barrel cement mix consisting of 258 sacks of class A cement. The cement was displaced with 44 barrels of fresh water and cement returns were witnessed to surface. |
| 1522341430 | 2018-03-27 | Casing String Witnessed | No Violations | On site today to witness running and cementing of 13.375 inch casing, H&P rig 611 drilled to a depth of 1470of 17.5inch hole and ran 1450 of 13.375 inch casing and CJ Services cemented it in place with 1350 sacks of Class A cement and they had 95 barrels of good cement returns to surface.
See cement report for further details. |
| 1523276356 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | |
| 1585754444 | 2020-4-1 0:00:0 | PW | No Violations | 0.50 |
| 1990765219 | 2018-08-02 | Completion Testing | No Violations | Status check inspection on the well completion process found 4 wells total on location and Stingray pressure pumping service currently stimulating 3 of the 4 wells. The said well has had 20 out of 55 total stages stimulated. Annular pressure monitoring is in place on both the A and B well head sections with the area between the 5.5 diameter production casing and the 9.625 diameter intermediate casing showing 14 pounds per square inch pressure. The area between the 13.375 diameter surface casing and the 9.625 diameter intermediate casing is showing 275 pounds per square inch pressure. The wireline company identified as EP Wireline has perforated stage 20 between the depths of 16,318 and 16,425, the stage was perforated with 4 clusters of 9 shots a cluster. The records indicate the average treating pressure has been 10,300 psi with an average pumping rate of 85 barrels per minute. The average initial shut in pressure has been 6,800 psi. The well head completion and lower assembly is all Universal Well Head 15,000 pound rated working pressure. |
For data sources see[10]