X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24812

Well Details

Well ID: 34-111-24812
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Green Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001524
Farm/Lease Name: ROTH D
License Status: Producing
License Date: 2017-12-18
Spud Date: 2018-10-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-11-23
Well Total Depth: 30676.00 ft
Configuration: Horizontal
Latitude: 39.700000
Longitude: -81.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-18 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/18/2017, Expired Date:12/18/2019 12:00:00 PM, Drilling unit acres:207.273, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2017-12-22 CORRECTION TO UNIT SIZE AND TARGET INFORMATION.
Reached Total Depth 2018-11-23
Correction to Well 2019-02-08 UPATE TARGET/TAKE PER AS-DRILLED PLAT
Record Last Modified 2019-03-08
Construction Permit Expires 2019-12-18

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
30417 30519 0
10107 10259 0
10107 10259 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-588279891 2020-4-17 0:00: PW No Violations 0.30
1210470591 2019-02-27 Completion Testing No Violations Status check inspection found Stingray Pressure pumping Service on location and stimulating 3 of the 5 wells on the pad. The said well has had 102 out of 102 stages completed. Nine Energy wireline is providing the perforating services. The well head completion stack is a FMC. The well head A&B sections have annular pressure monitoring in place and flow lines attached o the B section that are tied into a separate choke manifold. The flow lines are equipped with a 1,500 psi pop off with (2) in line shut off valves between the well head and pop off. Only the well being stimulated has the B section valves open to the check manifold during stimulation of that well. All stimulation equipment is situated on polymer containment and the well pad is equipped with a perimeter earthen berm with the perimeter berm drain valves being in the closed position.
1542117554 2018-11-13 Drill / Deepen / Reopen No Violations
1592125115 2020-8-18 0:00: PL No Violations 1.20

For data sources see[4]

References