Well ID: 34-111-24820 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.65,"lon":-80.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Ohio Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001542 | |
Farm/Lease Name: HANNIBAL A | |
License Status: Producing | |
License Date: 2018-03-07 | |
Spud Date: 2018-05-02 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-07-06 | |
Well Total Depth: 23590.00 ft | |
Configuration: Horizontal | |
Latitude: 39.650000 | |
Longitude: -80.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/7/2018, Expired Date:3/6/2020 12:00:00 PM, Drilling unit acres:291.696, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-07-06 | |
Correction to Well | 2018-08-31 | TAKE TARGET AS-DRILLED |
Completion Report Received | 2018-12-18 | |
Record Last Modified | 2018-12-28 | |
Construction Permit Expires | 2020-03-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-12-27 | 11167 | 11320 | 0 |
2018-12-27 | 23307 | 23411 | 0 |
23307 | 23411 | 0 | |
11167 | 11320 | 0 | |
11167 | 11320 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/22/2018 | 09/25/2018 | 11142 | 26,408,500.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | PROP-RC CERAMIC-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
Naphthalene | 91-20-3 | 5 | 0.00002097 | 53 | ||||
Ethanol | 64-17-5 | 60 | 0.000251673 | 629 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.011694 | 29181 | ||||
Mullite | 1302-93-8 | 100 | 0.246182 | 614300 | ||||
Ammonium Persulfate | 7727-54-0 | 95 | 0.00130814 | 3265 | ||||
Olefins | Proprietary | 5 | 0.00004419 | 112 | ||||
Tetrahydro-3,5-dimethyl-2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24 | 0.00661566 | 16509 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.000167782 | 420 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000123453 | 309 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00002097 | 53 | ||||
Organic phosphate copolymer | 71050-62-9 | 25 | 0.00313969 | 7835 | ||||
Poly(oxy-1,2-ethanediyl, a-tridecyl-w-hydroxy-, branched | 69011-36-5 | 5 | 0.00129934 | 3243 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000419 | 11 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000112632 | 282 | ||||
Phenol / formaldehyde resin | 9003-35-4 | 5 | 0.0123091 | 30715 | ||||
Sodium hydroxide | 1310-73-2 | 11.25 | 0.00310109 | 7739 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0339439 | 84701 | ||||
Citric acid | 77-92-9 | 60 | 0.00172629 | 4308 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000110468 | 276 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00003899 | 98 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 18 | 0.00971488 | 24242 | ||||
Hexamethylenetetramine | 100-97-0 | 1 | 0.00246182 | 6143 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.6092 | 26,473,200.0 | ||||
Methanol | 67-56-1 | 60 | 0.000246905 | 617 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.000809573 | 2021 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.000125837 | 315 | ||||
HP-2814 | One Aqua | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1296-17 | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.228019 | 568978 | |
Fresh Water | Operator | Base Fluid | Produced Water | 7732-18-5 | 100 | 8.21922 | 20,509,500.0 | |
Water | 7732-18-5 | 100 | 80.6478 | 201,241,000.0 | ||||
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-9601 | One Aqua | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2816 | One Aqua | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2220 | One Aqua | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
MB-7532 | One Aqua | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-08-22 | H2O | 15 | 452051 Gal | 449515 | Halliburton | STAGE 1/61
STAGES 2-60 SEE IMAGES |
2018-09-25 | H2O | 15 | 395569 Gal | 450585 | Halliburton |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | 1759656 | 0 | 71 |
2019 | ECLIPSE RESOURCES I LP | 1009965 | 0 | 53 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | Brine | 34828 | 71 |
2019 | ECLIPSE RESOURCES I LP | Brine | 32783 | 53 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2136883901 | 2018-8-29 0:00: | CT | No Violations | 0.50 |
-944414193 | 2020-7-22 0:00: | PW | No Violations | 1.50 |
0859549312 | 2018-05-15 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found H&P Drilling rig 608 on location and has drilled the 12.250 1st intermediate well bore at a measured depth of 3,581. The rig has pulled the drill string and loaded the well bore with 8.3 pound per gallon recycled water. Historically on 05/12/2018 the company set their 13.375 surface casing to a measured depth of 1,887and cemented it back to surface. Upon drilling out from under the 13.375 the company encountered a gas influx at a measured depth of 2,065, the gas was believed to be coming from the Big Injun formation. The company is modifying their gas control system past the well head and will then once again attempt to drill the well with a tri cone bit soaping on air. |
1525379037 | 2018-05-03 | Casing String Witnessed | No Violations | On site inspection to witness the witness the conductor casing cement job. Precision Rat hole is on location along with Stingray Cement Service. The Auger type rig spudded the well on 05/02/2018 and drilled a 30 diameter conductor well bore to a measured depth of 120 and inserted 120 of 24 diameter 94 pound per foot weld connection casing into the well bore. Stingray Cement Service cemented the casing using a 62.5 barrel absolute volume cement mix consisting of 290 sacks of class A cement with the cement weight verified at 15.6 pound per gallon by weight of scale, the cement yield was 1.21. The cement additives was 2% Calcium and .25 pound per sack celluseal. The cement was displaced to 110 with 57.7 barrels of fresh water. Cement returns were not witnessed to surface and the fluid level was tagged at 71 from the bottom of the cellar after displacment.. 3 conductors were set and cemented today. The job was called out for 14:00 but did not start until 18:30. The company has also started to lay containment and move the drilling rig in while conductor operations are in progress. |
1542126972 | 2018-11-13 | Preliminary Restoration | No Violations | Preliminary restoration status check inspection found the well pad surface and lease road is of stone construction and in good repair. There is vegetation established on all outward facing slopes of the well pad and erosion control in place. The well pad perimeter drains are in the closed position. There is disturbance on the outward slopes where the 3rd stream party pipe line has been installed and will need more vegetation growth before the restoration can be considered complete. The perimeter berm on the South West corner of the well pad has been removed and not sufficiently restored to proper heigth. The location was in close proximity to the tank battery and found at 39.65569 x 80.90328. Bruce Carpenter with Eclipse was notified at 11:45 am and asked to address the issue with the berm. There are 3 wells on the pad in production. The said well has a manual master valve installed on the B section of the well head. The 5.5 production casing internal working pressure as indicated on the well head gauge is 7,377 pounds per square inch (psi) there are (2) production flow lines attached and associated with this well at the well head with 2,200 psi on the production flow lines down stream from the well head pressure reduction choke system. Attached to well head A&B sections are riser pipes with valves and gauges present to monitor annular pressure, the riser pipes are equipped with gauges. The A section gauge shows 200 psi, this is the area which is between the 9.625 and 13.375 diameter casing strings. The B section gauge shows zero pounds pressure, this is the section between the 9.625 and 5.5 diameter casing strings. The tank battery consists of (4) steel construction 400 barrel capacity tanks that are situated inside a polymer lined steel containment dike area. There is a low pressure vapor recovery system present associated with the production equipment. There is multiple line and glycol heaters present on location. |
1548686243 | 2019-01-28 | Production Wells | No Violations | On site inspection found (3) wells on the pad that are in production. The said well is producing off the 5.5 diameter production casing through a primary master valve and into (2) sales lines, there is also a single line heater for each flow line. Down stream from the line heaters is (2) gas processing units. Annular pressure monitoring is in place with zero pressure noted on both the A&B section well heads. The tank battery is at the right rear corner of the well pad and consists of (4) steel tanks capable of holding 400 barrels fluid each, the tanks are situated inside a polymer lined steel containment dike area. Identification is posted at the well heads. The lease road and well pad surface are stone construction and in good repair. Also noted was the company was stacking out drill pipe on the location and a 3rd party contractor identified as Fairmont Tool was on site certifying the pipe. The pipe was being trucked in by Grant Smith Trucking and being unloaded by Fairmont Tool Employees within 10 of the (3) live well heads. The truck was being parked parallel to the wells. I notified the Fairmont Tool Employees along with Eclipse Personnel and asked them to move back a safe distance from the well heads while unloading pipe. |
2136883901 | 2018-08-29 | Completion Testing | No Violations | Status check inspection on the well completion process found Halliburton pressure pumping service along with Nine Energy wireline service. The 5.5 production casing was set to a measured depth of 23,590. The well will be stimulated in 61 stages total. Halliburton recently completed stage 11. The average treating pressure was 11,300 pounds per square inch (psi), the initial shut in pressure was 7,400 psi. The total fluid volume used was 9,800 barrels. The well head master valves and flow cross is rented from FMC. The B section annular pressure is being monitored electronically with 4 psi showing on the electronic transducer between the 5.5and 9.625 diameter casing strings. A manual gauge is on the A section and is being recorded daily. 3 wells are present on the pad and all the stimulation support equipment is situated on polymer containment. Nine Energy wireline is running in the hole to perforate stage 12 which will be perforated between the depths of 21,080 and 21,259 and the plug was set at 21,259. |
859549312 | 2018-5-15 0:00: | DD | No Violations | 1.00 |
For data sources see[10]