Well Details

Well ID: 34-111-24823
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Benton Township
Operator Name: TRIAD HUNTER LLC
Well Pad ID: US-OH-001543
Farm/Lease Name: POOL
License Status: Plugged Back
License Date: 2018-03-07
Spud Date: 2018-03-20
Spud Drilling Contractor:
Final Drill Date: 2018-05-19
Well Total Depth:
Configuration: Vertical
Latitude: 39.590000
Longitude: -81.100000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-07 Proposed Formations:TRENTON, Issued Date:3/7/2018, Expired Date:3/6/2020 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2018-05-04 CORRECTION TO PROPOSED TOTAL DEPTH PER INSPECTOR INFORMATION.
Plugged Back 2018-05-06
Reached Total Depth 2018-05-19
Record Last Modified 2018-12-21
Construction Permit Expires 2020-03-06

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-04-02 10332 10474 0
2019-04-02 16972 17072 0
16972 17072 0
10332 10474 0
10332 10474 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/09/2018 07/29/2018 9545 11,282,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Resin coated) Muskie Proppant Silica Substrate 14808-60-7 96 0.380562 408518
Phenolic Resin 9003-35-4 4 0.0158568 17021.6
SI-20 Moon Scale inhibitor Water 7732-18-5 55 0.012514 13433.3
Phosphinocarboxylic Acid 110224-99-2 45 0.0102387 10990.9
Plexgel 907L-EB Chemplex Gelling Agent Guar Gum 9000-30-0 50 0.00004120 44.229
Cyrstaline silca 14808-60-7 0.1 0.00000005 0.053
Organophylic Clay Proprietary 2 0.00000165 1.769
Alcohol ethoxylate 34398-01-1 1 0.00000082 0.885
Distilates (petroleum), Hydrotreated Light 64742-47-8 50 0.00004120 44.229
Water Blue Ridge Mountain Resources Carrier Fluid Water 7732-18-5 100 87.7097 94,152,800.0
Sodium Persulfate Chemplex Gel Breaker Disodium peroxodisulphate 7775-27-1 100 0.00000373 4
Hydrochloric Acid (28%) Oxy Acidizing Water 7732-18-5 72 0.274189 294331
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.106629 114462
Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 11.4068 12,244,700.0
Plexslick 957 Chemplex Friction Reducer Ammonium Chloride 12125-02-9 2 0.00134312 1441.78
Petroleum Distillate 64742-47-8 20 0.0134312 14417.8
Water 7732-18-5 60 0.0402936 43253.5
Oleic Acid Diethanolamide 93-83-4 1.5 0.00100734 1081.34
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.00100734 1081.34
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00011779 126.443
2-Propyn-1-ol 107-19-7 5 0.00011779 126.443
Coconut oil acid diethanolamine 68603-42-9 5 0.00011779 126.443
Methanol 67-56-1 35 0.000824531 885.101
2-Ethylhexanol 104-76-7 10 0.00023558 252.886
Olefin Proprietary 5 0.00011779 126.443
Acetic acid 64-19-7 65 0.00153127 1643.76
Fatty acids, tall oil 61790-12-3 5 0.00011779 126.443
Other Chemical(s) Listed Above See Trade Name(s) List Polyethylene glycol 25322-68-3 50 0.00698721 7500.49
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.00100734 1081.34
Water 7732-18-5 44.3 0.00619066 6645.43
Methanol 67-56-1 35 0.000824531 885.101
Ammonium Chloride 12125-02-9 2 0.00134312 1441.78
Organophylic Clay Proprietary 2 0.00000165 1.769
Oleic Acid Diethanolamide 93-83-4 1.5 0.00100734 1081.34
Water 7732-18-5 55 0.012514 13433.3
Olefin Proprietary 5 0.00011779 126.443
Cyrstaline silca 14808-60-7 0.1 0.00000005 0.053
Alcohol ethoxylate 34398-01-1 1 0.00000082 0.885
2-Ethylhexanol 104-76-7 10 0.00023558 252.886
Water 7732-18-5 60 0.0402936 43253.5
Fatty acids, tall oil 61790-12-3 5 0.00011779 126.443
Water 7732-18-5 72 0.274189 294331
2-Propyn-1-ol 107-19-7 5 0.00011779 126.443
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00011779 126.443
Phenolic Resin 9003-35-4 4 0.0158568 17021.6
Guar Gum 9000-30-0 50 0.00004120 44.229
Coconut oil acid diethanolamine 68603-42-9 5 0.00011779 126.443
K-BAC 1005 WST Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000804926 864.056
Water 7732-18-5 44.3 0.00619066 6645.43
Polyethylene glycol 25322-68-3 50 0.00698721 7500.49

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 TRIAD HUNTER LLC Brine 28319 184
2019 TRIAD HUNTER LLC Brine 14607 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1702856343 2018-3-22 0:00: CS No Violations 1.50
-1885505404 2018-4-23 0:00: CS No Violations 3.10
1525361338 2018-05-03 Drill / Deepen / Reopen No Violations Status check inspection on the current well drilling process found H&P Drilling rig 371 on location and currently drilling a 8.750 vertical well bore at a depth of 9,656 with a proposed total depth of the stratigraphically test section of 10,300. The 9.625 intermediate casing string was set at 8,948 and the company will bond log the 9.625 casing string once the strata graphical side wall boring test is complete. The side wall boring test will be conducted by an electrical wireline service. The vertical strata graphical section will be plugged back and the well bore drilled horizontally. The company does have the correct drilling permits to conduct this activity. The company man on duty is Clayton Lane.
1525790602 2018-05-08 Drill / Deepen / Reopen No Violations Status check inspection on the current well drilling process found H&P Drilling rig # 371 on location and rigged up over the well bore. The rig has previously completed the well drilling process down to a vertical depth of 10,122 using a 8.75 drill bit. The 9.625 casing was also set 50 into the Reedsville shale. The 8.750 vertical section was side wall cored and the well bore section plugged back to a depth of 9,092. The company is currently time drilling with a 8.750 directional drilling assembly attempting to kick off the cement plug. They are at a current depth of 9,092 and still have 80% cement returns to surface. The rig and support equipment is situated on polymer containment with the well pad perimeter earthen berm serving as the primary containment.
1529945608 2018-06-25 Completion Testing No Violations Status check inspection on the well completion process found the company has installed a lower master valve and is preparing the well for stimulation. Annular pressure monitoring is in place and is being checked daily. The company will fill the mouse holes and pour extra concrete in the cellar up to the base plate of the surface casing tomorrow morning. This will be to add extra support to the well head. The well pad earthen poly liner is intact with rubber mats in place on the liner. All rig equipment is off site. There will be an above ground storage tank placed on the well pad location.
1532371324 2018-07-23 Completion Testing No Violations
1534862459 2018-08-21 Completion Testing No Violations Status check inspection found the well drilling -stimulation and completion drill out operations now complete. The company man on site indicated that 2.875 diameter L-80 grade 6.5 pound per foot production tubing was set in the well bore on a tubing hanger. The tubing was set to a measured depth of 9,906 with a tubing profile X nipple set in the string at 9,575 and an XN nipple also set in the string at 9,871. The tubing hanger was positive pressure tested to 7,500 pounds per square inch for 15 minutes then negative tested for 15 minutes also. The well head consists of a lower A and upper B section followed by a production flow cross then a tubing flow cross. The tubing flow cross consists of a primary master valve followed by a secondary master valve with a total of (2) emergency shut down valves present in the well head production assembly. Crews are on site installing the production equipment downstream from the well head assembly. Crews are also on site mopping up from the completion process which includes pressure washing and removing all containment mats, all fluid created is being recovered and hauled from site by the means of a vacuum truck. All perimeter drain valves are in the closed position and no surface water is being discharged. 3 wells are present on this pad.
1599151815 2020-9-3 0:00:0 PL No Violations 0.40
1702856343 2018-03-22 Casing String Witnessed No Violations The purpose of my inspection was to witness cement operations on the conductor casing. Express Energy was on location with 2 auger rigs, 2 bulk cement trucks, and one pump truck. The borehole was 26 inches in diameter and was drilled to 120 feet in depth. No water was encountered during the drilling process. A 20 inch diameter conductor was set on bottom of the borehole at 120 feet. Express held a pre job safety meeting with all personnel on location. Following the safety meeting Expressed plumbed up to the casing and pumped 10 barrels of fresh water ahead of 230 sacks of class A cement weighing 15.6 pounds per gallon and 39 barrels of fresh water for displacement. 10 feet of cement was left within the casing and the remaining cement filled the annuals and circulated to surface. Returns were siphoned from the cellar.
1885505404 2018-04-23 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with H&P drilling rig 371 on location along with C&J Cement Service. The rig has drilled a 17.5 diameter surface borehole on air with a hammer bit to a measured depth of 1,546 with the depth measured off a drilling rig Kelly Bushing heigth of 25 above ground level elevation. The rig circulated the hole clean and pulled the drill string before inserting the 1,511 of 61 pound per foot J-55 grade buttress thread casing, the casing shoe track was 43.71 and made up of a float collar and float shoe with casing centralizers installed on the string every 4th casing joint. Upon installing the casing the casing was loaded with fresh water before starting the cement job by first pumping 40 barrels gel spacer followed by 20 barrels of fresh water then a 317 barrel cement mix consisting of 1,435 sacks of class A cement weighing 15.6 pound per gallon with a 1.24 yield. The cement weight was verified at 15.6 pound per gallon by weight of scale. The cement was displaced with 223 barrels of fresh water behind the cement wiper plug to the float shoe. Cement returns were witnessed to surface at 110 barrels into displacement with the final cement returns weight being verified by weight of scale at 15.6 pound per gallon. The final displacement pressure was 586 (psi) pounds per square inch with the casing being pressure tested to 1,125 psi upon the landing of the cement plug. Casing floats held.