Well Details

Well ID: 34-111-24832
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Green Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001486
Farm/Lease Name: ROLLAND D
License Status: Producing
License Date: 2018-08-02
Spud Date: 2018-08-02
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-10-27
Well Total Depth: 26163.00 ft
Configuration: Horizontal
Latitude: 39.660000
Longitude: -81.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-19 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/19/2018, Expired Date:3/18/2020 12:00:00 PM, Drilling unit acres:112.475, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2018-08-02 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:8/2/2018, Expired Date:8/1/2020 12:00:00 PM, Drilling unit acres:112.475, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2018-09-21 CHANGE IN UNIT SIZE AND TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2018-10-27
Completion Report Received 2019-05-13
Correction to Well 2019-05-16 UPDATE TAKEPOINT PER AS-PERFORATED PLAT
Record Last Modified 2019-05-31
Construction Permit Expires 2020-08-01

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-05-30 10414 10568 0
2019-05-30 25845 25949 0
25845 25949 0
10414 10568 0
10414 10568 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/13/2018 01/22/2019 10297 24,725,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (28%) Solvay Acidizing Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.091579 215045
Water 7732-18-5 64 0.162807 382302
Water Eclipse Resources Carrier/Base Fluid Water 7732-18-5 100 87.8678 206,330,000.0
Sand (40/70 Proppant) US Silica Proppant Silica Substrate 14808-60-7 100 9.47835 22,257,000.0
Sand (100 Mesh Proppant) US Silica Proppant Silica Substrate 14808-60-7 100 2.13209 5,006,560.0
Sand (30/50 Resin Proppant) US Silica Proppant Silica Substrate 14808-60-7 99.5 0.264504 621105
Phenolic Resin 9003-35-4 0.5 0.00132916 3121.13
Other Chemical(s) Listed Above See Trade Name(s) List Phenolic Resin 9003-35-4 0.5 0.00132916 3121.13
Methanol 67-56-1 40 0.000629065 1477.17
Coconut oil acid diethanolamine 68603-42-9 5 0.00007863 184.646
Water 7732-18-5 64 0.162807 382302
2-Propyn-1-ol 107-19-7 5 0.00007863 184.646
Fatty acids, tall oil 61790-12-3 5 0.00007863 184.646
2-Ethylhexanol 104-76-7 10 0.000157266 369.291
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007863 184.646
NEFE-180 Solvay Corrosion Inhibitor/Iron Control 2-Ethylhexanol 104-76-7 10 0.000157266 369.291
Fatty acids, tall oil 61790-12-3 5 0.00007863 184.646
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007863 184.646
2-Propyn-1-ol 107-19-7 5 0.00007863 184.646
Coconut oil acid diethanolamine 68603-42-9 5 0.00007863 184.646
Methanol 67-56-1 40 0.000629065 1477.17
Acetic acid 64-19-7 89 0.00139967 3286.69

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2019-01-22 H2O 28 10608 Bbl 448100 STINGRAY PRESSURE PUMPING LLC
2018-11-13 H2O 0 12992 Bbl 451169 Keane Frac STAGE 1

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 ECLIPSE RESOURCES I LP 846410 0 43

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 ECLIPSE RESOURCES I LP Brine 17382 43

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-809867540 2020-7-15 0:00: PW No Violations 2.00
1115964784 2020-5-14 0:00: PW No Violations 1.00
1533302192 2018-08-03 Casing String Witnessed No Violations I am onsite to witness the 24 inch diameter conductor cement job with Stingray Cementing and Precision Rathole. Precision used a conductor rig to drill a 30 inch diameter borehole to a depth of 120 feet from ground level, and inserted 120 feet of 24 inch diameter weld-connection casing. A pre-job safety meeting was held. Then, Stingray cemented the conductor with 290 sacks, 62.5 barrels total volume, of Class A cement, with a 1.21 yield, a weight of 15.6 pound per gallon. It was displaced with 57 barrels of fresh water. 14 barrels of good cement returns were witnessed at surface
1538741432 2018-10-05 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with H&P Drilling rig 608 on location along with Schlumberger cement service. The rig has air drilled a 17.5 diameter surface borehole to a measured depth of 1,520 with the depth being measured from a drilling rig Kelly Bushing heigth of 26.8 above ground level. The rig then inserted 1,468 of J-55 grade Buttress Thread casing with a casing guide shoe and float collar ran and centralizers ran on every 3rd casing joint. The casing was cemented by Schlumberger using a 267 barrel class A cement mix consisting of 1,270 sacks of class A cement. The cement weight was verified by weight of scale at 15.6 pound per gallon. The cement was displaced with 224 barrels of fluid to the float collar with the casing being pressure tested to1,291 pounds pressure upon the landing of the plug.
1539703049 2018-10-16 Drill / Deepen / Reopen No Violations Status check inspection on the current well drilling process found H&P Drilling rig 608 on location and currently drilling the 8.5 diameter horizontal production well bore at a measured depth of 13,545 using 14.1 pound per gallon diesel fuel based drilling mud with managed pressure drilling in place with the choke open and a 14.3 pound per gallon circulating equivalent. The proposed total depth is 25,235 and the 9.625 intermediate casing was set at 9,098. The rig and support equipment is situated on polymer containment with the well pad perimeter earthen berm serving as the primary containment with all drain valves closed during drilling operations.
1540482660 2018-10-25 Drill / Deepen / Reopen No Violations Status check inspection on the current well drilling process found H&P Drilling rig 608 on location along with Wyoming Casing Service. The rig has drilled an 8.5 diameter surface bore hole to a measured depth of 26,134. The drill sting has been pulled out of the hole and broken down and is being sent to the next location. The rig is running the 26,084 of 23 pound per foot P-110 grade casing. The casing equipment includes a guide shoe and float collar along with 3 smart sleeve and 85 casing centralizers. The well bore is static with 13.3 pound per gallon dies fuel base drilling mud in the hole. The rig and support equipment is situated on polymer containment with the well pad earthen berm serving as the primary containment with the drain valves in the closed position during drilling operations. There is one live well in operation on the pad. This is the last well on the pad to be drilled at this time and the rig is moving off location.
1548668737 2019-01-28 Completion Testing No Violations On site inspection found the drilling and completion process now complete and a workover tubing snubbing unit on location owned by Deep Well Services. The Unit is currently running in the hole drilling out the completion plugs at 17,000. The well bore is being circulated by a pressure fluid pump owned by Wetherford, the circulation fluid being used is 10 pound per gallon brine and the circulation pressure is 6,800 pounds pressure. The well bore working pressure at shut in is 3,600 pounds pressure. No production tubing is scheduled to be initially set in the well bore. There are (7) steel 500 barrel tanks being used for the drill out and one sand X container for the sand produced during the drill out. The company is monitoring annular pressures daily with the A section well head pressure reported at 150 pounds and the B section at zero pounds pressure. The total drilled measured depth of this well is 25,949. 3 wells were drilled in the last drilling phase, the wells were the 2-4 & 6H wells with one pre existing well on the pad.