If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24842 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Perry Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: US-OH-001004 | |
Farm/Lease Name: MOONRAKER | |
License Status: Producing | |
License Date: 2018-08-16 | |
Spud Date: 2018-10-04 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-12-02 | |
Well Total Depth: 17996.00 ft | |
Configuration: Horizontal | |
Latitude: 39.670000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-08-16 | Proposed Formations:POINT PLEASANT, Issued Date:8/16/2018, Expired Date:8/15/2020 12:00:00 PM, Drilling unit acres:476.45, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-12-02 | |
Completion Report Received | 2019-03-15 | |
Record Last Modified | 2019-05-15 | |
Correction to Well | 2019-05-17 | UPDATE TARGET/TAKE FINAL PLAT |
Construction Permit Expires | 2020-08-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-04-02 | 10341 | 10455 | 0 |
2019-04-02 | 17760 | 17856 | 0 |
17760 | 17856 | 0 | |
10341 | 10455 | 0 | |
10341 | 10455 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/11/2019 | 01/29/2019 | 9759 | 13,891,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LD-2850 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
OptiKleen-WF(TM) | Halliburton | Concentrate | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-30/50 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
LD-2950 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.173394 | 232660 | |
Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.00180841 | 2427 | ||||
Calcium chloride | 10043-52-4 | 96 | 0.00676112 | 9072 | ||||
Ethoxlated alcohols | Proprietary | 5 | 0.00083287 | 1118 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.032964 | 44232 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00102145 | 1371 | ||||
9-Octadecenamide,
n,n-bis-2(hydroxy-ethyl)-,(Z) |
93-83-4 | 5 | 0.00466633 | 6262 | ||||
Poly(oxy-1,2-ethanediyl),
.alpha.-tridecyl-.omega.-hydroxy-, branched |
69011-36-5 | 5 | 0.000827667 | 1111 | ||||
Methanol | 67-56-1 | 100 | 0.00654501 | 8784 | ||||
Ethanol | 64-17-5 | 1 | 0.00020429 | 275 | ||||
Sodium chloride | 7647-14-5 | 10 | 0.00968481 | 12996 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00612871 | 8224 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 13.4586 | 18,058,600.0 | ||||
Ethanaminium,
N,N,N-trimethyl-2-[(1-oxo-2-propen-1-yl)oxy ]-, chloride (1:1), polymer with 2-propenamide |
69418-26-4 | 30 | 0.027998 | 37568 | ||||
Potassium chloride | 7447-40-7 | 5 | 0.000352142 | 473 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.00641235 | 8605 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.00003122 | 42 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002043 | 28 | ||||
Citric acid | 77-92-9 | 60 | 0.000900745 | 1209 | ||||
Ammonium chloride | 12125-02-9 | 10 | 0.00933266 | 12523 | ||||
Strontium chloride | 10476-85-4 | 5 | 0.000352142 | 473 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00000520 | 7 | ||||
Hydrochloric acid | 7647-01-0 | 60 | 0.0214069 | 28724 | ||||
CALCIUM CHLORIDE - HI-TEST PELLETS | Halliburton | Accelerator | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1296-7 | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.2365 | 115,711,000.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2019-01-11 | H2O | 15 | 370753 Gal | 368440 | Halliburton | STAGE 1/50
STAGES 2-49 SEE IMAGES |
2019-01-29 | H2O | 0 | 6247 Bbl | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | EM ENERGY OHIO LLC | 594894 | 0 | 42 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | EM ENERGY OHIO LLC | Brine | 15205 | 42 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1384904668 | 2018-10-10 0:00 | PW | No Violations | 0.20 |
-1790862734 | 2019-2-5 0:00:0 | CT | No Violations | 0.20 |
-796375524 | 2019-3-5 0:00:0 | PW | No Violations | 0.30 |
-970082966 | 2020-2-3 0:00:0 | PW | No Violations | 0.80 |
0037219923 | 2018-11-07 | Casing String Witnessed | No Violations | On this day, I am onsite to witness the 13.375-inch diameter surface casing cement job with C&J Energy Services and an O-Tex pump truck. I am accompanied by ODNR Inspector Jeff Adams. The Patterson 714 rig drilled a 17.5-inch diameter borehole to a depth of 2,046 feet from a Kelly Bushing of 26 feet. Then, they inserted 2,016 feet of 13.375-inch diameter J-55 54.50 lb./ft. casing into the wellbore. A pre-job safety meeting was held in the doghouse. The hole was loaded and established circulation. C&J Energy Services initially pumped 25 barrels of gel spacer, followed by 10 barrels of fresh water. They cemented the casing with 340.9 barrels total volume (1,565 sacks) of Class A cement with a 1.22 yield, and a weight of 15.6 pounds per gallon, verified by scale. It was displaced with 305 barrels of water. The plug landed at 900 psi and pressured up to 1,400 psi, and held for 5 minutes. The floats held and bled back 1.5 barrels. 70 barrels of cement returns were witnessed at the surface. |
0563461124 | 2019-05-24 | Preliminary Restoration | No Violations | On this day, I am conducting a preliminary restoration inspection. The site meets ORC 1509.072(A). I found the pad fenced and gated with signage at the entrance. An earthen berm surrounds the perimeter of the pad. There are (3) producing wells, (3) gas processing units (GPU), and (3) 500-barrel and (1) 100-barrel steel production tanks within plastic lined steel containment. An Emergency Shutdown (ESD) button is present at the production facility, wellheads, and entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Identification and annular pressure monitoring devices are present at the wellheads. The 9.625 inch diameter intermediate casing has a pressure of 600 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 490 psi. Additionally, this well is tied into a secondary sand trap and gas buster. |
0796375524 | 2019-03-05 | Production Wells | No Violations | On this day, I spoke with EdgeMarc Company Representative Fritz Oser. The drilling and completions operations are finalized. Mr. Oser stated that flowback equipment is being rigged down, and the well is being placed into production. |
1384904668 | 2018-10-10 | Production Wells | No Violations | On this day, I am conducting a follow-up inspection to the 20 diameter conductor cement job that was initially pumped on 10/5/2018. I spoke with Edgemarc Drilling Consultant Duane Goodsell. He indicated that the cellar floors will be grouted within the next 24 hours. |
1541608283 | 2018-11-07 | Casing String Witnessed | No Violations | |
1543249462 | 2018-11-26 | Drill / Deepen / Reopen | No Violations | On this day, I found the Patterson 714 rig currently drilling the 8.75 inch diameter production borehole at a measured depth of 10,753 feet with an azimuth of 134.23 degrees and an inclination of 90.15 degrees. The projected total depth of the well is 18,010 feet. I spoke with Company Man, Danny Brooks, about monitoring annular pressures while drilling. They are currently drilling with diesel-based fluid with a weight of 13.5 pounds per gallon. |
1790862734 | 2019-02-05 | Completion Testing | No Violations | On this day, I found all 50 frac plugs have been drilled out, and Gladiator Energy is currently rigging down. I spoke with EdgeMarc Company Representative Travis Bostick and he stated that tubing will be run in the well within the next couple days. Flowback will commence following the installation of the tubing. Annular pressures are continued to be monitored. |
1913524696 | 2020-1-9 0:00:0 | PW | No Violations | 0.30 |
2046825040 | 2019-01-25 | Completion Testing | No Violations | On this day, I am conducting an inspection during the completion process, and found Halliburton Pressure Pumping Service onsite along with Allied Horizontal Wireline Service. They are zipper fracing between permit numbers 4843 (3PPH) and 4842 (1PPH). I spoke with EdgeMarc Company Man Travis Bostick during the inspection. They are preparing to complete stage 36 of 50, with 42 shots per stage. The frac plug is set at a measured depth of 12,593 feet. Mr. Bostick stated that annular pressures for the 13.375 inch diameter casing and 9.625 inch diameter casing are monitored and logged daily. Additionally, the pad is being used as a staging area during completion operations on a nearby pad. |
2132216574 | 2018-12-12 | Drill / Deepen / Reopen | No Violations | On this day, I spoke with Company Man Danny Brooks, and he stated that the Patterson 714 rig drilled the 8.5 inch diameter production borehole to a total measured depth of 17,996 feet and the 5.5 inch production casing shoe was set at a measured depth of 17,966 feet. |
37219923 | 2018-11-7 0:00: | CS | No Violations | 5.40 |
563461124 | 2019-5-24 0:00: | PL | No Violations | 0.30 |
For data sources see[10]