34-111-63555

Well Details

Well ID: 34-111-63555
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Perry Township
Operator Name: P P & G OIL
Well Pad ID:
Farm/Lease Name: HOGUE W O
License Status: Producing
License Date:
Spud Date: 1900-01-01
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth: 1470.00 ft
Configuration: Vertical
Latitude: 39.680000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Record Last Modified 2017-02-15

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 P P & G OIL 0.00 23.00 365
2014 P P & G OIL 0.00 27.00 365
2015 P P & G OIL 0.00 0.00 365
2016 P P & G OIL 0.00 0.00 365
2017 P P & G OIL 0.00 31.00 365
2018 P P & G OIL 0.00 0.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 P P & G OIL Brine 6 365
2014 P P & G OIL Brine 0 365
2015 P P & G OIL Brine 0 365
2016 P P & G OIL Brine 0 365
2017 P P & G OIL Brine 8 365
2018 P P & G OIL Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1075374932 2010-9-27 0:00: PW No Violations 1.00
-1418747459 2010-11-1 0:00: PW No Violations 1.00
-178423104 2010-9-17 0:00: CT No Violations 1.00
-201766490 2010-9-17 0:00: CT No Violations 1.00
-73743374 2010-9-27 0:00: PW No Violations 1.00
-943001330 2010-12-9 0:00: PW No Violations 1.00
0050903091 2018-03-26 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. There is a tubing head visible at the surface with 2.375 inch diameter tubing and the valve open. It is produced by means of a pumping unit with an electric motor, tubing, and rods. The production facility is shared with additional wells and contains (1) 70 barrel steel tank and (1) 100 barrel steel tank. The identification at the wellhead needs updated, and the production numbers are current, but 0s have been reported since 2015. Awaiting 2017 production numbers. The company will be contacted about the issues.
0073743374 2010-09-27 Production Wells No Violations FOLLOW UP TO NOV # 1872148976 I stopped to check status of well. There is a churchill pump jack.There is 2tubing in well. After my phone call with Rick simmers on 09-23-2010 I stopped by the yard and talked to roustabout at yard and told him to tell Glen Ludwig to shut well in and do not produce well. Well has to be rectified and fixed or it needs to be plugged. Simmers instructed me to issue compliance notice.
0178423104 2010-09-17 Completion Testing No Violations FOLLOW UP TO NOV # 1285582265 On day of inspection at frac job well did not have an api#.There was 300gal of HCL 15%dropped down well and then truck was taken out of location. Then 1 hr later the other frac equipment was mobbed in and set up.TD is at 1665 and the perfs were shot at 1526-1546.There is 1000of 6 1/4surface casing. There was no mandrel well had at all. There was 4 1/2casing frac valve and 6 1/4casing.The frac commenced. The hole was loaded and we just started to pressure up and the frac communicated up the backside of the 4 1/2 casing. The frac crew shut down. We were fracking the keener and at some point in time the well was deepened to the Berea. According to JT Wireline there was 80of cement above the top perfs.
0201766490 2010-09-17 Completion Testing No Violations FOLLOW UP TO NOV # 1115493205 FOLLOW UP TO NOV # 1285582265 On day of inspection at frac job well did not have an api#.There was 300gal of HCL 15%dropped down well and then truck was taken out of location. Then 1 hr later the other frac equipment was mobbed in and set up.TD is at 1665 and the perfs were shot at 1526-1546.There is 1000of 6 1/4surface casing. There was no mandrel well had at all. There was 4 1/2casing frac valve and 6 1/4casing.The frac commenced. The hole was loaded and we just started to pressure up and the frac communicated up the backside of the 4 1/2 casing. The frac crew shut down. We were fracking the keener and at some point in time the well was deepened to the Berea. According to JT Wireline there was 80of cement above the top perfs.
0230101953 2010-09-27 Production Wells No Violations FOLLOW UP TO NOV # 1872148976 I stopped to check status of well. There is a churchill pump jack.There is 2tubing in well. After my phone call with Rick simmers on 09-23-2010 I stopped by the yard and talked to roustabout at yard and told him to tell Glen Ludwig to shut well in and do not produce well. Well has to be rectified and fixed or it needs to be plugged. Simmers instructed me to issue compliance notice.
0505751277 2010-09-28 Administrative Inspection No Violations I called Glen Ludwig for a copy of the Bond log of the well by Thursday or he may be ordered to plug well.
0818776338 2017-01-17 Production Wells No Violations Compliance notices # 1285582265 and 1872148976 follow up inspection found the following equipment visible at surface- 2 tubing and a tubing head with a sales line hooked to the tubing head and the production valves in the open position. A 2 diameter sales line is present coming out of the ground approximately 3 from the well head with the sales line connection point to the well not visible from surface. At the production fluid storage facility a single 70 barrel capacity storage tank is present along with a 100 barrel storage tank. No violations noted and the previous violations issued appear to of been addressing 3411163554-0000.
0943001330 2010-12-09 Production Wells No Violations On day of inspection well is capable and all valves are open. Well was to be shut in and not producing until mechanical integrity tests were done. The company also has option to plug well. Well was fraced and there was communication up the annulus. Well is shared with another well and two tanks. There is no id.
1075374932 2010-09-27 Production Wells No Violations FOLLOW UP TO NOV # -73743374 FOLLOW UP TO NOV # 1872148976 I stopped to check status of well. There is a churchill pump jack.There is 2tubing in well. After my phone call with Rick simmers on 09-23-2010 I stopped by the yard and talked to roustabout at yard and told him to tell Glen Ludwig to shut well in and do not produce well. Well has to be rectified and fixed or it needs to be plugged. Simmers instructed me to issue compliance notice.
1115493205 2010-09-17 Completion Testing No Violations FOLLOW UP TO NOV # 1285582265 On day of inspection at frac job well did not have an api#.There was 300gal of HCL 15%dropped down well and then truck was taken out of location. Then 1 hr later the other frac equipment was mobbed in and set up.TD is at 1665 and the perfs were shot at 1526-1546.There is 1000of 6 1/4surface casing. There was no mandrel well had at all. There was 4 1/2casing frac valve and 6 1/4casing.The frac commenced. The hole was loaded and we just started to pressure up and the frac communicated up the backside of the 4 1/2 casing. The frac crew shut down. We were fracking the keener and at some point in time the well was deepened to the Berea. According to JT Wireline there was 80of cement above the top perfs.
1285582265 2010-09-17 Completion Testing Violations Noted On day of inspection at frac job well did not have an api#.There was 300gal of HCL 15%dropped down well and then truck was taken out of location. Then 1 hr later the other frac equipment was mobbed in and set up.TD is at 1665 and the perfs were shot at 1526-1546.There is 1000of 6 1/4surface casing. There was no mandrel well had at all. There was 4 1/2casing frac valve and 6 1/4casing.The frac commenced. The hole was loaded and we just started to pressure up and the frac communicated up the backside of the 4 1/2 casing. The frac crew shut down. We were fracking the keener and at some point in time the well was deepened to the Berea. According to JT Wireline there was 80of cement above the top perfs.
1418747459 2010-11-01 Production Wells No Violations On day of inspection Stonerock and I observed Ludwigs service rig pulling well.
1522087553 2018-03-26 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas. The well was observed to have a production casing and tubing string present and is set up to be produced by the means of a pumping unit. The well head valves are open. The company has identification at the well head however the well permit number is incorrect. The production facility consisted of (2) steel tanks not of common size, the tanks are shared by multiple wells on the lease.
1872148976 2010-09-27 Production Wells No Violations I stopped to check status of well. There is a churchill pump jack.There is 2tubing in well. After my phone call with Rick simmers on 09-23-2010 I stopped by the yard and talked to roustabout at yard and told him to tell Glen Ludwig to shut well in and do not produce well. Well has to be rectified and fixed or it needs to be plugged. Simmers instructed me to issue compliance notice.
2134763122 2010-09-27 Production Wells No Violations I called Glen Ludwig on well to let him Know he will be receiving a compliance notice. There was no answer.
230101953 2010-9-27 0:00: PW No Violations 1.00
505751277 2010-9-28 0:00: AM No Violations
50903091 2018-3-26 0:00: PW No Violations 0.50
818776338 2017-1-17 0:00: PW No Violations 1.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1285582265 US-OH-107918 2010-09-27 Well stimulation; failure to protect USDW; failure to complete well integrity testing

For data sources see[7]