If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-64765 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.66,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: RINARD PETROLEUM LLC | |
Well Pad ID: | |
Farm/Lease Name: MANN A | |
License Status: Producing | |
License Date: | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: 1900-04-16 | |
Well Total Depth: 1862.00 ft | |
Configuration: Vertical | |
Latitude: 39.660000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Completed | 1900-04-16 | PROD. FORM. = INJUN |
Reached Total Depth | 1900-04-16 | PROD. FORM. = INJUN |
Change of Owner | 2010-06-30 | Operator changed from 7261, HUGHES JAMES J to 5239, R & F OIL COMPANY |
Change of Owner | 2010-07-08 | Operator changed from 5239, R & F OIL COMPANY to 8688, AUGERHEAD OIL LLC |
Change of Owner | 2013-05-20 | Operator changed from 8688, AUGERHEAD OIL LLC to 9086, GENESIS RESOURCES LLC |
Change of Owner | 2018-06-20 | Operator changed from 9086, GENESIS RESOURCES LLC to 10087, RINARD PETROLEUM LLC |
Record Last Modified | 2018-06-20 | PROD. FORM. = INJUN |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | HUGHES JAMES J | 0.00 | 0.00 | 0 |
2003 | HUGHES JAMES J | 0.00 | 0.00 | 0 |
2009 | R & F OIL COMPANY | 0.00 | 0.00 | 365 |
2010 | AUGERHEAD OIL LLC | 6.00 | 15.00 | 365 |
2011 | AUGERHEAD OIL LLC | 55.00 | 0.00 | 365 |
2012 | AUGERHEAD OIL LLC | 55.00 | 0.00 | 366 |
2013 | AUGERHEAD OIL LLC | 31.00 | 31.00 | 135 |
2014 | GENESIS RESOURCES LLC | 11.00 | 9.00 | 365 |
2015 | GENESIS RESOURCES LLC | 4.00 | 10.00 | 280 |
2016 | GENESIS RESOURCES LLC | 3.00 | 14.00 | 314 |
2017 | GENESIS RESOURCES LLC | 6.00 | 5.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | HUGHES JAMES J | Brine | 0 | 0 |
2003 | HUGHES JAMES J | Brine | 0 | 0 |
2009 | R & F OIL COMPANY | Brine | 0 | 365 |
2010 | AUGERHEAD OIL LLC | Brine | 0 | 365 |
2011 | AUGERHEAD OIL LLC | Brine | 365 | |
2012 | AUGERHEAD OIL LLC | Brine | 0 | 366 |
2013 | AUGERHEAD OIL LLC | Brine | 0 | 135 |
2014 | GENESIS RESOURCES LLC | Brine | 0 | 365 |
2015 | GENESIS RESOURCES LLC | Brine | 0 | 280 |
2016 | GENESIS RESOURCES LLC | Brine | 0 | 314 |
2017 | GENESIS RESOURCES LLC | Brine | 222 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1392934841 | 2014-02-20 | Production Wells | No Violations | Inspection per request of the landowner as part of complaint # 4607. On this day Division Supervisor Brent Bear and myself met with the landowner Graham Harmon and addressed the complaint. Inspection of the well head found the following equipment present 6.250 casing-2 tubing and pumping rods with a .750 vent packer string and the well set up to be produced by the means of a pumping unit with the production valves in the open position, 3 -100 barrel production tanks along with a 70 and 50 barrel tank are present in an established dike area, There was a affected fluid impact area below the knock out fluid separator with a affected area in the ditch line of approximately 100. Contact was made with Andrew Allpin and orders given to have the party pumping the well who is the previous unregistered producer Pete English cease the discharge of production water onto the earth surface. |
For data sources see[7]