X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-22895

Well Details

Well ID: 34-115-22895
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Homer Township
Operator Name: AM-TEK OIL INC
Well Pad ID:
Farm/Lease Name: FISHER SCOTT
License Status: Producing
License Date: 1982-08-24
Spud Date: 1982-10-28
Spud Drilling Contractor: AZTEC DRLG
Final Drill Date: 1982-10-30
Well Total Depth: 1600.00 ft
Configuration: Vertical
Latitude: 39.530000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-08-24 1 HOPEWELL OIL & GAS DEV CO GeoDate 8/24/82
Oil and Gas 1982-08-24 Issued Date 8/24/82 Expired Date 2/15/83 Acres 0010000 Tool Type RTA Proposed Formation BEREA Proposed Depth 01600 Proposed Drill Depth 01600
Original Spud 1982-10-28
Completed 1982-10-30
Reached Total Depth 1982-10-30
Completion Report Received 1982-11-24
Construction Permit Expires 1983-02-15
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 1486 1506 0
1486 1506 0
2006-09-11 1549 1557 9
1549 1557 9
1486 1506 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1200 Bbl 15000 FRAC: 1200 BBL H2O, 15M SAND, ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 HOPEWELL OIL & GAS DEVELOPMENT 3517.00 0.00 365
1985 HOPEWELL OIL & GAS DEVELOPMENT 2813.00 0.00 0
1986 HOPEWELL OIL & GAS DEVELOPMENT 2174.00 0.00 365
1987 HOPEWELL OIL & GAS DEVELOPMENT 2420.00 0.00 365
1988 HOPEWELL OIL & GAS DEVELOPMENT 2097.00 0.00 365
1989 HOPEWELL OIL & GAS DEVELOPMENT 1896.00 0.00 365
1990 HOPEWELL OIL & GAS DEVELOPMENT 1175.00 48.00 365
1991 HOPEWELL OIL & GAS DEVELOPMENT 1107.00 0.00 365
1992 HOPEWELL OIL & GAS DEVELOPMENT 1333.00 0.00 365
1993 HOPEWELL OIL & GAS DEVELOPMENT 1012.00 0.00 365
1994 HOPEWELL OIL & GAS DEVELOPMENT 1105.00 0.00 365
1995 HOPEWELL OIL & GAS DEVELOPMENT 1093.00 0.00 365
1996 HOPEWELL OIL & GAS DEVELOPMENT 1029.00 0.00 365
1997 HOPEWELL OIL & GAS DEVELOPMENT 587.00 0.00 365
1998 HOPEWELL OIL & GAS DEVELOPMENT 406.00 0.00 365
1999 HOPEWELL OIL & GAS DEVELOPMENT 359.00 0.00 365
2000 HOPEWELL OIL & GAS DEVELOPMENT 7206.00 0.00 365
2001 HOPEWELL OIL & GAS DEVELOPMENT 459.00 0.00 365
2002 HOPEWELL OIL & GAS DEVELOPMENT 567.00 0.00 365
2003 HOPEWELL OIL & GAS DEVELOPMENT 279.00 0.00 365
2004 HOPEWELL OIL & GAS DEVELOPMENT 360.00 0.00 365
2005 HOPEWELL OIL & GAS DEVELOPMENT 290.00 0.00 365
2006 HOPEWELL OIL & GAS DEVELOPMENT 108.00 0.00 365
2007 HOPEWELL OIL & GAS DEVELOPMENT 192.00 0.00 0
2008 HOPEWELL OIL & GAS DEVELOPMENT 65.00 0.00 0
2009 HOPEWELL OIL & GAS DEVELOPMENT 187.00 0.00 365
2010 HOPEWELL OIL & GAS DEVELOPMENT 125.00 0.00 0
2011 HOPEWELL OIL & GAS DEVELOPMENT 217.00 0.00 0
2012 HOPEWELL OIL & GAS DEVELOPMENT 102.00 0.00 366
2013 HOPEWELL OIL & GAS DEVELOPMENT 59.00 0.00 365
2014 HOPEWELL OIL & GAS DEVELOPMENT 2.00 0.00 365
2015 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 365
2016 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 60
2017 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 0
2018 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 HOPEWELL OIL & GAS DEVELOPMENT Brine 2 365
1985 HOPEWELL OIL & GAS DEVELOPMENT Brine 10 0
1986 HOPEWELL OIL & GAS DEVELOPMENT Brine 30 365
1987 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1988 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1989 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1990 HOPEWELL OIL & GAS DEVELOPMENT Brine 17 365
1991 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1992 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1993 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1994 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1995 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1996 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1997 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1998 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1999 HOPEWELL OIL & GAS DEVELOPMENT Brine 365
2000 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2001 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2002 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2003 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2004 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2005 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2006 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2007 HOPEWELL OIL & GAS DEVELOPMENT Brine
2008 HOPEWELL OIL & GAS DEVELOPMENT Brine 0
2009 HOPEWELL OIL & GAS DEVELOPMENT Brine 35 365
2010 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 0
2011 HOPEWELL OIL & GAS DEVELOPMENT Brine 0
2012 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 366
2013 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2014 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2015 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2016 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 60
2017 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 0
2018 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL9909 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0967024791 2016-03-04 Production Wells No Violations My inspection today is on a well with the RBDMS status of producing. During the time of my inspection the well is equipped with 4.5 inch production casing that goes into a 4.5 inch by 2 inch swage nipple. There is a 2 inch steel line hooked up with a valve in the open position. The production equipment consists of one vertical separator and one 100 bbl. tank. No violations noted.
967024791 2016-3-4 0:00:0 PW No Violations 1.00
PL9909 PL No Violations

For data sources see[9]

References