If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-23276 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.65,"lon":-81.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Meigsville Township | |
Operator Name: SABRE ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: ALLEN | |
License Status: Final Restoration | |
License Date: 1997-10-24 | |
Spud Date: 1984-03-13 | |
Spud Drilling Contractor: DYNAMIC DRILLING | |
Final Drill Date: 1984-03-17 | |
Well Total Depth: 5261.00 ft | |
Configuration: Vertical | |
Latitude: 39.650000 | |
Longitude: -81.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-09-20 | Issued Date 9/20/83 Expired Date 3/18/84 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-03-12 | 182 BELDEN & BLAKE CO GeoDate 3/12/84 |
Oil and Gas | 1984-03-12 | Issued Date 3/12/84 Expired Date 9/8/84 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05261 Proposed Drill Depth 05261 |
Original Spud | 1984-03-13 | R.I. 3-17-84 IP. A.F. |
Completed | 1984-03-17 | R.I. 3-17-84 IP. A.F. |
Reached Total Depth | 1984-03-17 | R.I. 3-17-84 IP. A.F. |
Completion Report Received | 1984-04-20 | R.I. 3-17-84 IP. A.F. |
CO | 1984-05-17 | 126 ENTERPRISE ENERGY CORP GeoDate 9/20/83 |
CO | 1994-10-25 | 4381 PELICAN PRODUCING INC GeoDate 3/12/84 |
CO | 1996-12-10 | 5244 SABRE ENERGY CORPORATION GeoDate 3/12/84 |
APP | 1997-10-24 | Proposed Formations:CLINTON, Issued Date:10/24/97, Expired Date:10/24/98 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 1998-04-22 | R.I. 3-17-84 IP. A.F. |
Construction Permit Expires | 1998-10-24 | R.I. 3-17-84 IP. A.F. |
Record Last Modified | 2015-09-24 | R.I. 3-17-84 IP. A.F. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4985 | 5098 | 0 |
4985 | 5098 | 0 | |
2006-09-11 | 5004 | 5154 | 8 |
5004 | 5154 | 8 | |
4985 | 5098 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 44000 Gal | 70000 | FRAC;H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ENTERPRISE ENERGY CORP | 6307.00 | 249.00 | 0 |
1985 | ENTERPRISE ENERGY CORP | 3881.00 | 179.00 | 333 |
1986 | BELDEN & BLAKE CORPORATION | 1331.00 | 88.00 | 365 |
1987 | BELDEN & BLAKE CORPORATION | 1211.00 | 76.00 | 365 |
1988 | BELDEN & BLAKE CORPORATION | 888.00 | 59.00 | 284 |
1990 | BELDEN & BLAKE CORPORATION | 475.00 | 71.00 | 124 |
1991 | BELDEN & BLAKE CORPORATION | 488.00 | 51.00 | 365 |
1994 | PELICAN PRODUCING INC | 0.00 | 0.00 | 365 |
1995 | PELICAN PRODUCING INC | 639.00 | 75.00 | 365 |
1996 | SABRE ENERGY CORPORATION | 244.00 | 0.00 | 365 |
1997 | SABRE ENERGY CORPORATION | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ENTERPRISE ENERGY CORP | Brine | 400 | 0 |
1985 | ENTERPRISE ENERGY CORP | Brine | 505 | 333 |
1986 | BELDEN & BLAKE CORPORATION | Brine | 75 | 365 |
1987 | BELDEN & BLAKE CORPORATION | Brine | 178 | 365 |
1988 | BELDEN & BLAKE CORPORATION | Brine | 215 | 284 |
1990 | BELDEN & BLAKE CORPORATION | Brine | 215 | 124 |
1991 | BELDEN & BLAKE CORPORATION | Brine | 67 | 365 |
1994 | PELICAN PRODUCING INC | Brine | 0 | 365 |
1995 | PELICAN PRODUCING INC | Brine | 307 | 365 |
1996 | SABRE ENERGY CORPORATION | Brine | 60 | 365 |
1997 | SABRE ENERGY CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL9685 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
iDIAN00021 | 1998-10-06 | Final Restoration | No Violations | |
iDIAN000215 | 1998-10-6 0:00: | FR | No Violations | |
PL9685 | PL | No Violations |
For data sources see[9]