X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24259

Well Details

Well ID: 34-115-24259
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Homer Township
Operator Name: PETRO QUEST INC
Well Pad ID:
Farm/Lease Name: LOWE
License Status: Producing
License Date: 1992-04-17
Spud Date: 1992-07-29
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1992-08-10
Well Total Depth: 1305.00 ft
Configuration: Vertical
Latitude: 39.470000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1992-04-17 Issued Date 4/17/92 Expired Date 4/17/93 Acres 0010000 Tool Type CT Proposed Formation MACKSBURG thru BE Proposed Depth 01305 Proposed Drill Depth 01305
Original Spud 1992-07-29
Completed 1992-08-10
Reached Total Depth 1992-08-10
CO 1992-08-24 2165 PETRO QUEST INC GeoDate 4/17/92
Completion Report Received 1992-09-15
Construction Permit Expires 1993-04-17
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 0 0
1284 1305 0
1997-06-29 1284 1305 0
0 0
0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 900 Bbl 20000 FRAC W/900 BW & 200 SX SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1992 PETRO QUEST INC 1187.00 0.00 180
1993 PETRO QUEST INC 911.00 0.00 365
1994 PETRO QUEST INC 2190.00 0.00 365
1995 PETRO QUEST INC 2100.00 0.00 365
1997 PETRO QUEST INC 2142.00 0.00 365
1998 PETRO QUEST INC 2190.00 0.00 365
1999 PETRO QUEST INC 1897.00 0.00 365
2000 PETRO QUEST INC 1717.00 0.00 365
2002 PETRO QUEST INC 1511.00 0.00 365
2003 PETRO QUEST INC 1415.00 0.00 365
2004 PETRO QUEST INC 1252.00 0.00 365
2005 PETRO QUEST INC 1167.00 0.00 365
2006 PETRO QUEST INC 1044.00 0.00 365
2007 PETRO QUEST INC 1230.00 0.00 365
2008 PETRO QUEST INC 1081.00 0.00 365
2009 PETRO QUEST INC 1230.00 0.00 365
2010 PETRO QUEST INC 1396.00 0.00 365
2011 PETRO QUEST INC 1392.00 0.00 365
2012 PETRO QUEST INC 1242.00 0.00 366
2013 PETRO QUEST INC 1140.00 0.00 365
2014 PETRO QUEST INC 874.00 0.00 365
2015 PETRO QUEST INC 1317.00 0.00 365
2016 PETRO QUEST INC 1131.00 0.00 365
2017 PETRO QUEST INC 1234.00 0.00 365
2018 PETRO QUEST INC 1062.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1992 PETRO QUEST INC Brine 0 180
1993 PETRO QUEST INC Brine 0 365
1994 PETRO QUEST INC Brine 0 365
1995 PETRO QUEST INC Brine 0 365
1997 PETRO QUEST INC Brine 0 365
1998 PETRO QUEST INC Brine 0 365
1999 PETRO QUEST INC Brine 0 365
2000 PETRO QUEST INC Brine 0 365
2002 PETRO QUEST INC Brine 0 365
2003 PETRO QUEST INC Brine 0 365
2004 PETRO QUEST INC Brine 0 365
2005 PETRO QUEST INC Brine 0 365
2006 PETRO QUEST INC Brine 0 365
2007 PETRO QUEST INC Brine 0 365
2008 PETRO QUEST INC Brine 0 365
2009 PETRO QUEST INC Brine 0 365
2010 PETRO QUEST INC Brine 0 365
2011 PETRO QUEST INC Brine 0 365
2012 PETRO QUEST INC Brine 0 366
2013 PETRO QUEST INC Brine 0 365
2014 PETRO QUEST INC Brine 0 365
2015 PETRO QUEST INC Brine 0 365
2016 PETRO QUEST INC Brine 0 365
2017 PETRO QUEST INC Brine 0 365
2018 PETRO QUEST INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1977166230 2017-1-12 0:00: PW No Violations 1.00
-237905603 2016-12-12 0:00 PW No Violations 1.00
0237905603 2016-12-12 Production Wells No Violations The inspection today revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel and plastic production lines, and 2 inch diameter production tubing. The valves on the wellhead for gas were open at the time of inspection but, the valve leading to the tank for fluid was closed. The tank battery is equipped with a 100 barrel steel tank. The identification for this well is hanging on the wellhead. There are no issues to report at this time and this well is currently producing.
1247571869 2013-06-14 Production Wells No Violations There are no issues to report at this time.
1619246868 2017-01-12 Production Wells No Violations The inspection today revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel and plastic production lines, and 2 inch diameter production tubing. The valves on the wellhead for gas were open at the time of inspection but, the valve leading to the tank for fluid was closed. The tank battery is equipped with a 100 barrel steel tank. The identification for this well is hanging on the wellhead. There are no issues to report at this time and this well is currently producing. The previous violations on this well have been resolved at the time of inspection.
1648596760 2016-07-11 Production Wells No Violations The inspection revealed the well is equipped with a rabbit unit, 7 inch casing, 4.5 casing, and 2 tubing. Valve are open on the well head and the well appears to be capable of production.. There is a single 100 barrel tank near the entrance to the well .There is a proper ID attached to the tank and the production reports are up to date on RBDMS. There appear to be no violations at this time.
1760378577 2015-10-15 Production Wells Violations Noted On my inspection today I found that the tank battery is leaking oil into the dike and causing contamination of the soil. The leak seems to be coming from the bottom of the back side of the tank and into the dike. The well is equppied to a single 100 bbl tank and a rabbit well head with lines leading directly into the tank. All the fittings seem to properly be fitted into the tank and well head. The contaminated soil must be removed and the leak must be fixed. The contamination is contained with in the dike.
1977166230 2017-01-12 Production Wells No Violations The inspection today revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel and plastic production lines, and 2 inch diameter production tubing. The valves on the wellhead were open at the time of inspection. The tank battery is equipped with a 100 barrel steel tank. The identification for this well is hanging on the wellhead. There are no issues to report at this time and this well is currently producing.
2114830777 2015-12-01 Production Wells No Violations On my inspection today I found the well to have the spill cleaned up and the soil has been removed. They have also replaced part of the earthen dike where it looked like they removed some of the contaminated soil. No other issues to report at this time.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1760378577 US-OH-117515 2017-01-13 9-1-07 Well operation causing pollution and contamination
1760378577 US-OH-117516 2017-01-13 9-9-05(A)8 Equipment pressure rated below operating pressure

For data sources see[9]

References