If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24595 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.76,"lon":-81.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: York Township | |
Operator Name: TEMPLE OIL & GAS CO | |
Well Pad ID: | |
Farm/Lease Name: FLOYD JAMES | |
License Status: Producing | |
License Date: 2007-06-26 | |
Spud Date: 2007-06-27 | |
Spud Drilling Contractor: TEMPLE OIL & GAS | |
Final Drill Date: 2007-08-24 | |
Well Total Depth: 1305.00 ft | |
Configuration: Vertical | |
Latitude: 39.760000 | |
Longitude: -81.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-06-26 | Proposed Formations:BEREA, Issued Date:6/26/2007, Expired Date:6/25/2008 6:00:00 AM, Drilling unit acres:64.13, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2007-08-24 | |
Construction Permit Expires | 2008-06-25 | |
Completion Report Received | 2008-10-16 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-12-03 | 1264 | 1288 | 20 |
1264 | 1288 | 20 | |
1264 | 1288 | 20 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 300 Gal | 11000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | TEMPLE OIL & GAS CO | 382.00 | 0.00 | 77 |
2008 | TEMPLE OIL & GAS CO | 1164.00 | 0.00 | 365 |
2009 | TEMPLE OIL & GAS CO | 899.00 | 0.00 | 261 |
2010 | TEMPLE OIL & GAS CO | 746.00 | 36.00 | 313 |
2011 | TEMPLE OIL & GAS CO | 0.00 | 749.00 | 365 |
2012 | TEMPLE OIL & GAS CO | 430.00 | 33.00 | 366 |
2013 | TEMPLE OIL & GAS CO | 347.00 | 33.00 | 365 |
2014 | TEMPLE OIL & GAS CO | 237.00 | 0.00 | 365 |
2015 | TEMPLE OIL & GAS CO | 200.00 | 27.00 | 365 |
2016 | TEMPLE OIL & GAS CO | 155.00 | 19.00 | 365 |
2017 | TEMPLE OIL & GAS CO | 92.00 | 0.00 | 365 |
2018 | TEMPLE OIL & GAS CO | 71.00 | 21.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | TEMPLE OIL & GAS CO | Brine | 0 | 77 |
2008 | TEMPLE OIL & GAS CO | Brine | 0 | 365 |
2009 | TEMPLE OIL & GAS CO | Brine | 75 | 261 |
2010 | TEMPLE OIL & GAS CO | Brine | 65 | 313 |
2011 | TEMPLE OIL & GAS CO | Brine | 1052 | 365 |
2012 | TEMPLE OIL & GAS CO | Brine | 47 | 366 |
2013 | TEMPLE OIL & GAS CO | Brine | 32 | 365 |
2014 | TEMPLE OIL & GAS CO | Brine | 0 | 365 |
2015 | TEMPLE OIL & GAS CO | Brine | 0 | 365 |
2016 | TEMPLE OIL & GAS CO | Brine | 25 | 365 |
2017 | TEMPLE OIL & GAS CO | Brine | 12 | 365 |
2018 | TEMPLE OIL & GAS CO | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-827815839 | 2008-12-12 0:00 | PL | No Violations | |
0827815839 | 2008-12-12 | Preliminary Restoration | No Violations | Restoration work at site satisfactory,pit has been filled in and site reclaimed well is equipped with pumping unit and 2-100 bbl tanks with dike in place. |
For data sources see[9]