If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24609 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.61,"lon":-81.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Union Township | |
Operator Name: R C POLING CO INC | |
Well Pad ID: | |
Farm/Lease Name: SKINNER | |
License Status: Final Restoration | |
License Date: 2012-10-24 | |
Spud Date: 2008-08-26 | |
Spud Drilling Contractor: JAM OIL & GAS | |
Final Drill Date: 2008-08-08 | |
Well Total Depth: 1430.00 ft | |
Configuration: Vertical | |
Latitude: 39.610000 | |
Longitude: -81.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-10-16 | Proposed Formations:BEREA, Issued Date:10/16/2007, Expired Date:10/15/2008 6:00:00 AM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-08-08 | |
Completion Report Received | 2008-12-22 | |
APP | 2012-10-24 | Proposed Formations:BEREA, Issued Date:10/24/2012, Expired Date:10/24/2014 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2012-12-04 | |
Construction Permit Expires | 2014-10-24 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-02-13 | 1388 | 1398 | 24 |
1388 | 1398 | 24 | |
1388 | 1398 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 35420 Gal | 20000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | R C POLING CO INC | 0.00 | 42.00 | 134 |
2010 | R C POLING CO INC | 0.00 | 23.00 | 365 |
2011 | R C POLING CO INC | 36.00 | 0.00 | 365 |
2012 | R C POLING CO INC | 48.00 | 0.00 | 366 |
2013 | R C POLING CO INC | 0.00 | 19.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | R C POLING CO INC | Brine | 50 | 134 |
2010 | R C POLING CO INC | Brine | 65 | 365 |
2011 | R C POLING CO INC | Brine | 1270 | 365 |
2012 | R C POLING CO INC | Brine | 405 | 366 |
2013 | R C POLING CO INC | Brine | 30 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-400719826 | 2014-3-25 0:00: | AM | No Violations | |
-547890838 | 2009-10-29 0:00 | PL | No Violations | |
0004011364 | 2012-12-03 | Plug / Plug Back | No Violations | Arrived on location to witness plugging of Skinner #1 with Pat Shreve. Plug job was performed by Wright Well Services and cement job was completed by Formation Cement. An unsuccessful attempt was made to set a 30 sack bottom plug from 998-1398 with bullhead method. Wright well services ran 2 tubing in order to circulate cement plug out of the 4.5 casing. 2 tubing was then run to the bottom where a 30 sack plug was set from 981-1381. The 2 tubing was pulled out of hole. The 4.5 casing was ripped at 937 and the service company then pulled 15 joints to set a rip plug from 837-937. After plug was set, casing was locked up and had to be ripped again at a depth of 246. Fluid level was at 300. All remaining 4.5 casing was pulled and a stone and brush plug was set at 246. Well was topped off with 48 sacks of cement and 3% gel from 246 to surface, however cement dropped back 30. Company will bring out quickcrete this week to top of and complete the job. |
0400719826 | 2014-03-25 | Administrative Inspection | No Violations | I spoke with Dick Poling today and he stated he and the landowner were going to wait until spring to see if grass is capable of growing at the location. He will restore the area or get a landowner waiver if the site does not show vegetative growth this spring. |
0547890838 | 2009-10-29 | Preliminary Restoration | No Violations | Restoration meets 1509.072(A) requirements. |
0634995384 | 2013-08-26 | Plug / Plug Back | Violations Noted | The location is still barren of vegetation. Site does not meet final restoration requirements. I called Dick Poling and he stated they seeded the location in agreement with the landowners specific request. He will call the landowner and correct the issue. |
0926949017 | 2014-06-10 | Final Restoration | No Violations | There is no evidence of production equipment left behind and the land was properly restored. The location has met all 1509.072B restoration requirements. |
0964473933 | 2013-04-23 | Plug / Plug Back | No Violations | I went out to location to inspect the top hole cement job. Dick Poling had finished plugging the last 30 of surface. Zak Poling was out on location with a back hoe. He was excavating around the wellhead to cut casing and weld the steel plate. He stated they used 8 sacks of cement last week to finish the plug job. The tanks were still up at top of access road. |
1316002529 | 2011-09-13 | Production Wells | No Violations | Inspection this day found tank battery with proper ID. Dike walls need built up or dike size increased. Did not get to well but it appears to be in production - can hear fluids running into tank. |
1354545355 | 2012-12-03 | Plug / Plug Back | No Violations | Wright well service is plugging well and Formation cementing is placing plugs. Attempted to set plug at 1398-998. Ran 30 sacks as bottom hole plug thru a bullhead method. The Plug stopped at 4 barrel in to the displacement. Wright well service ran 2tubing in the well and circulated cement plug out of 4.5casing. Then ran tubing to bottom and set a 30 sack plug thru 2tubing at 1381-981. Ripped off at 937. Set a rip plug from 937-837. Pulled up to 445. Set 100 in and 100out on bottom of surface plug. Rig tried to pull pipe could not. Rig started ripping pipe at 250. Ripped pipe at 246.Fluid level was down to 300. Pulled all 4.5casing out. Ran stone and brush plug to 246. Topped off well with 48 sacks at 3%geled cement to surface. Cement dropped back to 30. Company will bring out Quick Crete to top off well. They will contact Morgan county inspector. All plugs circulated. |
1405352268 | 2014-07-14 | Final Restoration | No Violations | I received a landowner waiver from Dick Poling which was signed by the landowner Russell Hardyshell. |
4011364 | 2012-12-3 0:00: | PB | No Violations | 12.50 |
634995384 | 2013-8-26 0:00: | PB | No Violations | 0.50 |
926949017 | 2014-6-10 0:00: | FR | No Violations | 2.00 |
964473933 | 2013-4-23 0:00: | PB | No Violations | 0.50 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0634995384 | US-OH-127208 | 2014-07-18 | Defective casing, leaking well |
For data sources see[9]