X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24669

Well Details

Well ID: 34-115-24669
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Deerfield Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: HANN
License Status: Final Restoration
License Date: 2017-03-30
Spud Date: 2012-11-05
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2012-11-19
Well Total Depth: 6411.00 ft
Configuration: Vertical
Latitude: 39.670000
Longitude: -81.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-05 Proposed Formations:KNOX, Issued Date:9/5/2012, Expired Date:9/5/2014 12:00:00 PM, Drilling unit acres:90, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-10-19 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2012-11-19
Completion Report Received 2013-02-06
APP 2017-03-30 Proposed Formations:BEEKMANTOWN, Issued Date:3/30/2017, Expired Date:3/30/2019 12:00:00 PM, Drilling unit acres:90, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2017-06-30
Record Last Modified 2017-10-23
Construction Permit Expires 2019-03-30

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-01-11 6250 6344 79
6250 6344 79
6250 6344 79

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-12-05 ACID 15 17000 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY 9085.00 749.00 365
2014 ARTEX OIL COMPANY 2663.00 326.00 365
2015 ARTEX OIL COMPANY 2176.00 248.00 365
2016 ARTEX OIL COMPANY 1077.00 194.00 365
2017 ARTEX OIL COMPANY 428.00 40.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY Brine 5879 365
2014 ARTEX OIL COMPANY Brine 5110 365
2015 ARTEX OIL COMPANY Brine 3164 365
2016 ARTEX OIL COMPANY Brine 2688 365
2017 ARTEX OIL COMPANY Brine 575 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1426006232 2017-6-28 0:00: PB No Violations 3.00
-314882577 2017-6-27 0:00: PB No Violations 3.50
0220196842 2017-06-29 Plug / Plug Back No Violations Today I was back on location to witness the Berea plug being set. The rig crew ran the 2 inch tubing back in the well to set the plug. The Berea plug was set from 1376-1176 feet. After talking it over with Steve Minor from Artex he has decided to let the plug setup today then come back in tomorrow to set the final two plugs. Plugging operations will continue tomorrow.
0314882577 2017-06-27 Plug / Plug Back No Violations I returned to this well today to witness the plugging operations on it. When the rig crew tagged the bottom plug they found that the formation had drank most of the plug so they ran the tubing back in the well to reset the plug. They pumped another 30 sacks of Class A cement. The rig crew then pulled the tubing out of the well so they could rip the 4.5 inch casing. Before the rig crew ripped the 4.5 inch casing they tagged the plug at 5,986 feet. The rig crew then started to retrieve the 4.5 inch casing. They were able to find free pipe at 4,035 feet. The pipe was ripped at this point and one 5 foot pulling sub was pulled from the well to make sure pipe was free before the Clinton plug was set. Plugging operations will continue tomorrow.
0700093694 2013-10-22 Preliminary Restoration No Violations Preliminary restoration is passed in accordance to 1509.072.
0771024633 2017-08-21 Final Restoration No Violations The final restoration meets 1509.072(B) requirements.
0878854413 2013-04-10 Drill / Deepen / Reopen No Violations Upon inspection I found pits filled and a the well was equipped with a pumping unit. It was pumping at time of arrival. The road and location had not yet been restored so I called Frank, with Artex, and he said they were still waiting for the area to dry out. They also need to grade the highwall. He said he would call me here soon when they move onto location for restoration work.
0900440621 2017-06-28 Plug / Plug Back No Violations I returned to this well today to witness the plugging operations. Today the rig crew had Formation Cementing on location to set the Clinton plug from 4030 feet and the bottom of the 7 inch from 3016-2816 feet. Both of the plugs were set through the 4.5 inch diameter casing. The rig crew will now remove the 4.5 inch casing from the well then find free pipe in the 7 inch casing to retrieve it. The rig crew was able to retrieve the 7 inch casing at 2030 feet. The 7 inch will now be removed from the well and the tubing will be ran back in to set the remainder of the plugs.
1098606969 2013-09-04 Production Wells No Violations Upon inspection I found pits filled and a the well was equipped with a pumping unit. It was pumping at time of arrival. Artex removed the highwall and created a nice slope at the wellhead. There area still does not meet preliminary restoration requirements.
1352012261 2012-11-04 Drill / Deepen / Reopen No Violations Warren rig 7 is drilling and setting conductor pipe to 100of 13.37536lb/ft in a 105 of 17.5open hole. Circulation was established.
1352221121 2012-11-05 Drill / Deepen / Reopen No Violations I was on location to witness the cementing of the 9 5/8 surface casing. The Warren rig #2 drilled a 12 1/4 hole to a TD of 762. The casing shoe depth was 689. Centralizers were not run on the surface casing and the insert was at a depth of 647. The pipe was pressure tested and chart was recorded by Artex. The manifold valves were leaking however surface job had good returns and was successful.
1352491438 2012-11-05 Drill / Deepen / Reopen No Violations Warren rig 7 was setting surface pipe to 689of 9.625casing in a 12.25open hole. Formation Cementing is on location to cement casing in place. Good circulation and returns. Artex tried to test on insert after landing plug to 800 psi. The cementers manifold was leaking. Tried testing several times. Cement did not drop back.
1352914734 2012-11-09 Drill / Deepen / Reopen No Violations Warren rig 7 is setting 720lb/ft range 3 casing in a 8.875open hole. This string is casing of a potential loss circulation zone. There was a Back-off collar at 2126. There are float shoe at 2901 and baffle insert at 2858. There has been 3 centralizes ran at the bottom 3 joints. Universal services were in to cement pipe in place in the well bore. Circulation was established. Top of cement should be at 2250.The casing was tested upon landing the plug at the insert. Test pressure was at 780 psi. Test passed.
1354643580 2012-12-04 Drill / Deepen / Reopen No Violations Jason Ritchie from Artex called and said they were going to perf well at 1:00pm. I arrived on location to witness Artex perf job at 12:50pm and Gray Wireline on site. They had just finished perforating the well. Service company then ran 2 tubing downhole in preparation for acid job. Treatment for well will be tomorrow morning. The perforated intervals were 6249.8-6343.7 with 79 holes.
1426006232 2017-06-28 Plug / Plug Back No Violations Stopped at location and met Inspector Justin Smith during the plugging operation.
1498487522 2017-06-26 Plug / Plug Back No Violations I was on location today to witness the plugging operations of this well. Artex Oil Company has decided to plug this well so they brought in Bishop Well Service to plug the well. Today they will be setting the bottom plug through the 2 inch diameter tubing. Once the plug is set the tubing will be pulled from the well then the rig crew will tag the bottom plug before ripping the 4.5 inch casing. The plugging operations will continue tomorrow.
1499345379 2017-06-30 Plug / Plug Back No Violations I returned to this well today to witness the plugging of it. Today the bottom of the surface and the surface plug will be set. Both of the plugs were set with Class A cement pumped by Formation Cementing through 2 inch diameter tubing. The bottom of the surface was set at 800-600 feet and the surface plug was from 186-0 feet. The cement stayed at the surface with no settling. The well is now plugged.
2029906639 2013-06-03 Drill / Deepen / Reopen No Violations I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The pit was filled and an active pumping unit at this location. They will be moving equipment in about 10 days to work on the access road and well location.
220196842 2017-6-29 0:00: PB No Violations 3.00
700093694 2013-10-22 0:00 PL No Violations 0.50
771024633 2017-8-21 0:00: FR No Violations 0.70
878854413 2013-4-10 0:00: DD No Violations 0.50
900440621 2017-6-28 0:00: PB No Violations 5.00

For data sources see[9]

References