X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24676

Well Details

Well ID: 34-115-24676
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: York Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: BARKMAN UNIT
License Status: Producing
License Date: 2013-06-17
Spud Date: 2013-07-29
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-08-08
Well Total Depth: 6574.00 ft
Configuration: Vertical
Latitude: 39.740000
Longitude: -81.950000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-06-17 Proposed Formations:TRENTON THRU KNOX, Issued Date:6/17/2013, Expired Date:6/17/2015 12:00:00 PM, Drilling unit acres:120, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-08-08
Completion Report Received 2014-07-17
Construction Permit Expires 2015-06-17
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-07-06 6377 6447 96
6377 6447 96
6377 6447 96

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-21 ACID 15 20000 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY 0.00 25.00 365
2014 ARTEX OIL COMPANY 44375.00 7813.00 365
2015 ARTEX OIL COMPANY 24893.00 13153.00 365
2016 ARTEX OIL COMPANY 16564.00 11215.00 365
2017 ARTEX OIL COMPANY 17775.00 10433.00 365
2018 ARTEX OIL COMPANY 14409.00 8913.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY Brine 3394 365
2014 ARTEX OIL COMPANY Brine 6470 365
2015 ARTEX OIL COMPANY Brine 10074 365
2016 ARTEX OIL COMPANY Brine 7634 365
2017 ARTEX OIL COMPANY Brine 6980 365
2018 ARTEX OIL COMPANY Brine 6506 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1765193574 2014-4-18 0:00: DD No Violations 0.20
-1824170216 2017-2-13 0:00: PW No Violations 1.50
-2026166526 2014-9-30 0:00: DD No Violations
-454085381 2014-12-31 0:00 DD No Violations 0.30
-669436873 2013-7-31 0:00: DD No Violations 6.50
0155436080 2018-02-15 Production Wells No Violations I was on location today to do a field inspection on this well. At the time of my inspection the well was in operation. The well has a pumping unit on it with rods and 2 inch diameter tubing in it. The identification for the well has been posted at the wellhead and the production tank. There are no violations at this time.
0454085381 2014-12-31 Drill / Deepen / Reopen No Violations The operator has recently installed a pumpjack on the wellhead so the area around the well is not currently growing vegetation. There are now two 210 bbl tanks and one 100bbl tank in the dike. The well is currently in production.
0669436873 2013-07-31 Drill / Deepen / Reopen No Violations Witnessed 690 of new 9 5/8 surface casing set in 740 of 12 1/4 borehole with 238 sacks Class A cement. Centralizers placed at 649 and 523, baffle set in casing at 648. Guide shoe placed at 691 feet. Mix water tested and found to have 215 ppm Chloride content. Good returns seen at the surface. Casing pressure test administered and held 700 psi for 5 minutes with no loss.
0699305963 2019-04-17 Production Wells No Violations I was on location today to do a field inspection on this well. The well appears to have been serviced recently. There is a pile of tubing laying off to the side of the well. The well is pumping today during my inspection. The identification for the well is located on the production tank. There is 2-100 barrel and 1-100 barrel storage tanks for this well. There are no violations at this time.
1064273100 2015-02-17 Production Wells No Violations JH Hawk hauler was on location draining the brine from the tanks. The pumpjack was in operation when I arrived at the well. There are no issues to report at this time.
1375164381 2013-07-30 Drill / Deepen / Reopen No Violations Witnessed 84 of 13 3/8 new 36 lb/ft conductor pipe with a 17 landing joint set in 90 of 17 1/2 borehole with 100 sacks Class A cement. 200 lb gel, 300 lb CaCl-, 40 lb cotton seed hulls. Circulation established. Good returns seen at the surface.
1375637824 2013-08-04 Drill / Deepen / Reopen No Violations Aretex called me at 0700 hours, they informed me of the BOP test. The test was started at 1345 hours and finished at 1400 hours. The test pressure was 950 PSI. No loss in pressure, test passed.
1389206442 2014-01-08 Drill / Deepen / Reopen No Violations Well does not yet meet preliminary restoration requirements, however the wellhead is hooked up to the separator and tanks. The valves at the wellhead are currently shut in. There are two 100 bbl tanks in a good dike. The area will have to be seeded in order to establish vegetative growth. I will come back in the spring to check location.
1396854197 2019-9-11 0:00: PW No Violations
1436891256 2015-07-14 Preliminary Restoration No Violations The preliminary restoration meets 1509.072. The well was pumping during the time of my inspection.
155436080 2018-2-15 0:00: PW No Violations 0.50
1765193574 2014-04-18 Drill / Deepen / Reopen No Violations The well is currently in production. Artex has completed installation of gas lines and there is a chart on the meter at the wellhead. They have switched out the 100bbl oil tank for a 210 bbl tank. There was an oil truck on location draining the oil from the new tank. The location still does not meet preliminary restoration. I will continue to monitor this well.
1824170216 2017-02-13 Production Wells No Violations The inspection this day revealed that this well is equipped with a pumping unit, a 4 1/2 inch diameter wellhead, 2 inch diameter production tubing, and 2 inch diameter production lines. The well is pumping at the time of inspection and all valves are open on the wellhead. The tank battery is equipped with two (2) 210 barrel steel tanks, a 100 barrel steel tank, and proper identification posted on one of the 210 barrel tanks. The separator for the well is to the left of the tanks and is a horizontal separator. Artex has one of their pumpers on site at the time of inspection running a few repairs on the separator. There are no issues to report at this time and the well is in production at the time of inspection.
2025622754 2019-9-9 0:00:0 PW No Violations 0.50
2026166526 2014-09-30 Drill / Deepen / Reopen No Violations The well is currently in production. There was a track hoe on location and it appears they are going to bury a 1 plastic line from the wellhead to the separator.
699305963 2019-4-17 0:00: PW No Violations

For data sources see[9]

References