If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24678 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.71,"lon":-81.94,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Deerfield Township | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: SMITH-FRALEY UNIT | |
License Status: Final Restoration | |
License Date: 2013-07-30 | |
Spud Date: 2013-09-04 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-09-18 | |
Well Total Depth: 6517.00 ft | |
Configuration: Vertical | |
Latitude: 39.710000 | |
Longitude: -81.940000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-30 | Proposed Formations:CLINTON THRU TREMPEALEAU, Issued Date:7/30/2013, Expired Date:7/30/2015 12:00:00 PM, Drilling unit acres:79, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-09-18 | |
Completion Report Received | 2014-10-14 | |
Plugged Back | 2014-10-23 | |
Plugged/Abandoned | 2014-11-12 | |
Construction Permit Expires | 2015-07-30 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1084338971 | 2014-6-4 0:00:0 | DD | No Violations | |
-1163133823 | 2014-7-22 0:00: | DD | No Violations | |
-1346095580 | 2014-10-22 0:00 | PL | No Violations | |
-1677493623 | 2014-11-3 0:00: | PB | No Violations | |
-48488685 | 2014-4-18 0:00: | DD | No Violations | 0.30 |
-592756531 | 2014-10-28 0:00 | PB | No Violations | |
-984272113 | 2014-7-2 0:00:0 | DD | No Violations | |
-990766121 | 2014-8-15 0:00: | DD | No Violations | |
0044432620 | 2015-07-28 | Final Restoration | No Violations | The Final Restoration meets 1509.072.(B). |
0048488685 | 2014-04-18 | Drill / Deepen / Reopen | No Violations | The well location does not preliminary restoration. There are two large areas near the wellhead where the soil has slipped down the hill. I talked to Joe Schneider and he was aware of the issues. He stated that the well is loaded up with water and they plan on brining a service rig in the next few weeks to work the well. He believes it is no good and will most likely plug the well. If they do this then he will correct the slope issues. |
0552707931 | 2014-09-30 | Drill / Deepen / Reopen | No Violations | The operator has restored the slopes of the location. They have graded the roads and problem areas and have spread seed and straw. Some areas are now growing grass. I will continue to monitor the site until it meets preliminary restoration requirements. |
0592756531 | 2014-10-28 | Plug / Plug Back | No Violations | Formation was on location to cement in the 4.5 casing through tubing. A cement retainer was set at 4590 and Formation pumped 110 sacks of Class A cement. Operator will pull tubing and come back on Friday to run a cement bond log. |
0773043046 | 2014-07-14 | Plug / Plug Back | No Violations | I was at this well to do the final restoration on it. I was unable to pass the restoration at this time because there was 6 pieces of 7 at the end of the lease road and about 100 of flow line. I contacted Heath from Artex and he said he would get someone out there to clean it up. |
0984272113 | 2014-07-02 | Drill / Deepen / Reopen | No Violations | I was on location with state engineer Jason Simmerman. The location has had major rotational slips which may soon compromise the wellhead. The area consists of supersaturated unconsolidated sediment and is too wet at this time to bring in any heavy equipment. I will continue to work with state engineer and operator to ensure the protection of the wellhead and location. |
0990766121 | 2014-08-15 | Drill / Deepen / Reopen | No Violations | I was on location with Artex personnel Frank Wriggle and Casey Fritz to review preliminary restoration requirements. They need to wait until area dries out before they can began to re-stabilize the well pad. |
1084338971 | 2014-06-04 | Drill / Deepen / Reopen | No Violations | Miller Roustabout on location graded the well site and hooking up production equipment. They have begun dike construction. Operator still has no closed the pit. I will continue to monitor their progress. |
1163133823 | 2014-07-22 | Drill / Deepen / Reopen | No Violations | I was on location with Andy Thomas and Anthony Carson, state engineers, for a follow-up inspection. There is a dozer on location and it appears that there was an attempt to compact some of the area. The places have since slipped away due to the amount of water. A diversion ditch was constructed on the backside of the location but appears to be unsuccessful in capturing and redirecting the runoff. |
1346095580 | 2014-10-22 | Preliminary Restoration | No Violations | Site now correctly meets 1509.072 preliminary requirements. |
1378325591 | 2013-09-04 | Drill / Deepen / Reopen | No Violations | I arrived on location to witness the cementing of the conductor casing. Formation Cement Co was on location. Artex is using the Kilbarger Patterson #17 rig. Pump truck got clogged up with chunks of limestone from cement truck so operator had to pump cement out of hole. Pump truck was repaired and second attempt was successful. Cement was witnessed at the surface. |
1378449970 | 2013-09-06 | Drill / Deepen / Reopen | No Violations | I was on location to witness the cementing of the 9 5/8 surface casing. The Kilbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 769. The casing shoe depth was 720. Centralizers were not run on the surface casing and the baffle insert was at a depth of 676. The plug was down at 400am with good cement returns and the pressure was held at 700 psi for 5 minutes. |
1414088474 | 2014-10-23 | Plug / Plug Back | No Violations | Formation was on location to set a bottom hole plug (6138-6438) and a Trenton plug ( 5350-5750) using total of 65 sacks. They will come back tomorrow to rip the 4.5 casing in order to plug back to the Clinton/Medina formations. |
1414171296 | 2014-10-24 | Plug / Plug Back | No Violations | Operator was on location and they tagged the top of the Trenton plug at 5250. The top of cement on the 4.5 was at 5200. They made an unsuccessful attempt to rip the pipe at 4644 and then called Appalachian Wireline Services. The 4.5 was perfed from 4614-4618. Formation was on location to set the 4.5 casing but they were unable to get water to circulate prior to pumping cement. |
1415304943 | 2014-11-06 | Plug / Plug Back | No Violations | I was on location to witness Formation Cement set a 100 plug from 4223-4323 inside the 4.5 casing after an unsuccessful squeeze job in order to try to produce the Clinton and Medina. They had a free point around 4100 with the ability to circulate. The operator then ripped the 4.5 at 4069 and set a rip plug from 3820-4020. They will pull the 4.5 up to the bottom of the 7 in order to set a big lime plug tomorrow. |
1415377187 | 2014-11-07 | Plug / Plug Back | No Violations | Formation Cement was on location to set a bottom of 7 casing/Big Lime plug from 3035-3235. There was good circulation. The operator then pulled the remainder of the 4.5 casing from the hole. Timco Services was on location to shoot off the 7 at . They will pull all of the 7 from the hole and come back next week to run tubing down to finish plugging the remainder of the well. |
1624067155 | 2014-05-27 | Drill / Deepen / Reopen | No Violations | The well is still shut in and the slope down from the well location has slipped some more since the last inspection. I talked to Joe Schneider and he stated that they have a contractor moving to the location in the next few weeks to restore the area before they send in the service rig. They are talking about plugging the well back to the Clinton. Site does not meet preliminary restoration requirements. |
1677493623 | 2014-11-03 | Plug / Plug Back | No Violations | Timco Wireline ran cement bond log and the top of cement from previous squeeze job on the 4.5 was at 4366. They had perforated the Medina today at 4330. |
1765023409 | 2013-10-21 | Drill / Deepen / Reopen | No Violations | Miller Supply was on location installing equipment and constructing the dike. There was still an open pit, but the operator has removed all other drilling equipment. Site does not yet pass preliminary restoration. |
44432620 | 2015-7-28 0:00: | FR | No Violations | 1.00 |
552707931 | 2014-9-30 0:00: | DD | No Violations | |
773043046 | 2014-7-14 0:00: | PB | No Violations | 1.00 |
For data sources see[3]