If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-117-24234 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-82.81,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morrow | |
Municipality: Harmony Township | |
Operator Name: GEOPETRO LLC | |
Well Pad ID: | |
Farm/Lease Name: V COOPER UNIT | |
License Status: Final Restoration | |
License Date: 2011-08-24 | |
Spud Date: 2011-09-21 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2011-09-27 | |
Well Total Depth: 3505.00 ft | |
Configuration: Vertical | |
Latitude: 40.500000 | |
Longitude: -82.810000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-24 | Proposed Formations:TRENTON THRU KNOX, Issued Date:8/24/2011, Expired Date:8/23/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-09-27 | |
Correction to Well | 2011-10-28 | CORRECTION TO LEASE NAME AND ADDED GEOLOGICAL FORMATION. |
Plugged/Abandoned | 2011-11-02 | |
Completion Report Received | 2011-11-14 | |
Construction Permit Expires | 2013-08-23 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | SWAB TESTED OPEN HOL W 4 1/2" CASING SET ON PACKER@3360' |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-206652383 | 2011-10-26 0:00 | PB | No Violations | |
-2090603341 | 2011-10-31 0:00 | PB | No Violations | |
-237512978 | 2011-9-23 0:00: | DD | No Violations | |
-49068344 | 2011-10-11 0:00 | DD | No Violations | |
-716216418 | 2011-9-21 0:00: | DD | No Violations | |
0049068344 | 2011-10-11 | Drill / Deepen / Reopen | No Violations | the 4.5 inch casing has been set on a packer. Pits are partially closed. Berry well service rig on well. |
0206652383 | 2011-10-26 | Plug / Plug Back | No Violations | Inspect location. Service rig on well. Maintenance on service rig. Bottom plug was set, by bullhead, pressured up to 600 psi during operation. Packer originally set at 3360 feet, pull one joint, packer wedged at 3320 feet. Rip at 3170 feet. Operator chang |
0237512978 | 2011-09-23 | Drill / Deepen / Reopen | No Violations | On site for cementing of surface casing. Conductor casing (9 5/8) set to 313 on 9/21/11 and cemented in with 220 sacks. Bowman Drilling drilled an 8 7/8 hole to 1585 and set 1558 of 7 casing. Hole drilled on air and circulated with mud prior to cementing. Formation Cementing ran 232 sacks of class A with 2% gel and 600 lb of accelerator. Circulation throughout job but returns slowed due to weight of mud. Returns accumulated around wellhead but believe cement circulated to surface. |
0663562951 | 2011-09-22 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Conductor set and cemented. Rig broke down. |
0716216418 | 2011-09-21 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Set and cement conductor casing. |
0757995204 | 2014-06-11 | Preliminary Restoration | No Violations | The V. Cooper Unit #1 (#4234) has been plugged: preliminary restoration completed. |
0915282037 | 2014-06-11 | Final Restoration | No Violations | Inspected the V. Cooper Unit #1 (#4234) as part of a standard final restoration inspection. The well was officially plugged and abandoned witnessed by Inspectors Tom Benko and Ben Harpster on 11/2/2011. The well site has been graded and erosion control established at the wooded edge of the farmers field. The timber removed has been stock piled for wildlife habitat as per restoration plan. The portion of the access road through the broadleaf forest remains (no gravel or rock) and is being utilized by the landowner for access to the field. Status: Final Restoration complete. |
1322763730 | 2011-10-25 | Plug / Plug Back | No Violations | On site for bottom plug. See plug report. |
2025255014 | 2011-11-02 | Plug / Plug Back | No Violations | Plug well. shale has collapsed in hole at 1610 feet. Set 400 foot plug at 60 feet below surface casing and surface plug 200 feet to surface. |
2090603341 | 2011-10-31 | Plug / Plug Back | No Violations | Shale has collapsed to 2460 feet. Set plugs according to site conditions. |
663562951 | 2011-9-22 0:00: | DD | No Violations | |
757995204 | 2014-6-11 0:00: | PL | No Violations | |
915282037 | 2014-6-11 0:00: | FR | No Violations |
For data sources see[4]