Well Details

Well ID: 34-117-24242
Loading map...
Country: United States
State: Ohio
County: Morrow
Municipality: Perry Township
Operator Name: MARAM ENERGY INC
Well Pad ID:
Farm/Lease Name: SEI-K & B LANKER UNIT
License Status: Producing
License Date: 2012-05-03
Spud Date: 2012-06-13
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2012-06-21
Well Total Depth: 3910.00 ft
Configuration: Vertical
Latitude: 40.590000
Longitude: -82.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-05-03 Proposed Formations:UTICA THRU TREMPEALEAU, Issued Date:5/3/2012, Expired Date:5/3/2014 12:00:00 PM, Drilling unit acres:66.67, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-06-21
Completion Report Received 2012-11-14
Construction Permit Expires 2014-05-03
Change of Owner 2016-11-10 Operator changed from 1146, SCION ENERGY, INC. to 476, MARAM ENERGY CO
Record Last Modified 2017-06-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-12-11 3858 3912 0
3858 3912 0
3858 3912 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-08-15 ACID 15 2000 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 SCION ENERGY INC 0.00 82.00 153
2013 SCION ENERGY INC 0.00 13.00 365
2014 SCION ENERGY INC 0.00 54.00 365
2015 SCION ENERGY INC 0.00 76.00 365
2016 MARAM ENERGY INC 0.00 0.00 58
2017 MARAM ENERGY INC 0.00 0.00 365
2018 MARAM ENERGY INC 0.00 113.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 SCION ENERGY INC Brine 351 153
2013 SCION ENERGY INC Brine 161 365
2014 SCION ENERGY INC Brine 380 365
2015 SCION ENERGY INC Brine 100 365
2016 MARAM ENERGY INC Brine 180 58
2017 MARAM ENERGY INC Brine 525 365
2018 MARAM ENERGY INC Brine 540 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1026562321 2012-11-13 0:00 PW No Violations
-1061149172 2017-4-27 0:00: PW No Violations
-1230494784 2012-8-16 0:00: CT No Violations
-1919098248 2017-1-17 0:00: PW No Violations
-1935167857 2013-4-4 0:00:0 PL No Violations
-2078967247 2017-9-13 0:00: PW No Violations
-376776758 2012-10-5 0:00: CT No Violations
-622845489 2012-9-10 0:00: CT No Violations
-97441288 2012-6-13 0:00: DD No Violations
0097441288 2012-06-13 Drill / Deepen / Reopen No Violations Kilbarger #1 move in and spud with 17.5 bit at 3:15 p.m. Total depth reached at 61 5:20 p.m. Ran 63 of new 36 pound 13.375 diameter conductor, not cemented.
0325991585 2012-06-19 Drill / Deepen / Reopen No Violations Kilbarger #1 drilling ahead on soap at 3138 in the shale (2:00 p.m.), one hour per kelly. D.V. survey 3050 .75 degrees. Stratagraph on location and rigged up. Rig personnel working on chaining and staking the blow line down and lighting the smudge pot. S&H oil field services hauling in fresh water and 250 barrels of brine for control fluid.
0376776758 2012-10-05 Completion Testing No Violations Completion testing continues. The gas flare is lit.
0540235682 2015-10-29 Production Wells No Violations Inspect well, storage and identification. Status: well was in production, ok.
0622845489 2012-09-10 Completion Testing No Violations The tank battery and separator have been set up at the road. The well is still pumping into the temporary storage.
1026562321 2012-11-13 Production Wells No Violations The well is pumping and in production. Gas flare for excess gas is operational. The storage tanks and separator have been painted green.
1061149172 2017-04-27 Production Wells No Violations Inspect wellsite, storage and identification. Status: noted slight gas odor at well, called operator to investigate. The farmer had just finished seeding the field.
1115113848 2018-12-11 Production Wells No Violations Inspected the Lanker #3 (#4242) as part of a standard production well status check. Inspect well, storage and identification. Status: ok.
1158806191 2018-04-20 Production Wells No Violations Inspected the Lanker #3 (#4242) as part of a standard production well status check. Inspect well, storage and identification. Status: ok. The well was pumping at the time of inspection
1165776919 2017-04-27 Production Wells No Violations Location Information for the Lanker #3 (#4242). WELL HEAD: Lat. 40.59205 Long. -82.64793 / CENTER-OF-STORAGE: Lat. 40.59385 Long. -82.64349 / ENTRANCE: Lat. 40.59375 Long. -82.64310.
1230494784 2012-08-16 Completion Testing No Violations Berry well service swabbed well and kicked off. Flowing combination of oil and completion acid into steel tanks. Scion plans to blow well down and run rods and tubing.
1323745172 2012-08-10 Completion Testing No Violations Berry well service swabbed well and flowed into steel tanks. Scion plans to acidize early next week.
1339719613 2012-06-14 Drill / Deepen / Reopen No Violations Kilbarger Rig #1 reached total depth on the surface hole (12.25 inch bit) at 620 4:00 p.m. on air, loaded the hole and circulated. 7:30 p.m. Os power tongs finish running 14 joints (588) 9.625, 26 pound new surface casing with a guide shoe on bottom, set at 598. Formation cementing on location 8:00 p.m. and started hooking up to well. Pumped 203 sacks Class A with excellent circulation at the surface which held. Plug down at 9:40 p.m.
1340199278 2012-06-20 Drill / Deepen / Reopen No Violations Kilbarger #1 drilling ahead on soap 3600 one hour per kelly. Air head rubber change and check of the choke lines scheduled at 3800.
1340300165 2012-06-21 Drill / Deepen / Reopen No Violations Kilbarger #1 reached total depth at 3910 in the Trempealeau at 9:00 a.m. Lay well down with mud pump and circulate hole. Begin pulling out of hole at 10:45. Preparing to log well and run 4.5 productive casing.
1340371522 2012-06-22 Drill / Deepen / Reopen No Violations Kilbarger #1 finish running 91 joints 4.5 productive casing set at 3868. Plug down at 4:00 a.m. Open hole completion.
1341705891 2012-07-07 Preliminary Restoration No Violations Miller roustabout has finished closing all pits, compacted and graded location. Waiting on completion.
1344355066 2012-08-07 Completion Testing No Violations Berry well service is running in the hole with drill collars and bit to drill out shoe beginning 8/9/2012. Initial plan is to drill out shoe and flow back well into steel pits.
1344452696 2012-08-08 Completion Testing No Violations Berry well service drilled out shoe and circulated hole. Preparing to swab.
1345728615 2012-08-23 Completion Testing No Violations A New River gas powered pump jack has been installed on the well and is pumping into temporary storage and separator. Excess gas is being flared. Permanent storage tanks have been delivered and are waiting hook-up.
1350919701 2012-10-22 Production Wells No Violations The location is in the process of being fully converted to production, testing has been completed. The permanent storage which consist of three tanks and a flare stacked is hooked-up and operational. The New River pump jack is being wired for electric and telemetry. Status OK.
138430934 2020-6-19 0:00: PW No Violations
1577197009 2012-08-06 Completion Testing No Violations Berry well service unloading tubing and preparing to begin completion testing.
1878853151 2014-04-22 Production Wells No Violations Inspected the Lanker Unit #3 (#4242) as part of a standard production well status check. Inspect well, storage and identification. Status: ok.
1907653488 2012-06-18 Drill / Deepen / Reopen No Violations 6/16/2012 had strong Hydrogen Sulfide show in the Newburg (1752), rig gas detectors went off, convert to fluid. 6/17/2012 T.D. surface hole 2159 and set 7 intermediate casing. 6/18/2012 drilling ahead with 6.25 bit 2500 (shale) soaping. D.V. survey 2440 1.25 degree. Both air and fluid pits are lined and functional. B.O.P. (blow-out preventer) installed and tested OK.
1919098248 2017-01-17 Production Wells No Violations The operator has posted their own identification and emergency contact information. Status: ok.
1935167857 2013-04-04 Preliminary Restoration No Violations Well is in production, preliminary restoration passed.
2078967247 2017-09-13 Production Wells No Violations Inspected the Lanker #1 (#4242) as part of a standard production well status check. Inspect storage and identification. Status: ok.
2100151715 2012-07-02 Preliminary Restoration No Violations Miller roustabout is closing the pits. Fluid pit is closed, working on the large air pit.
325991585 2012-6-19 0:00: DD No Violations
540235682 2015-10-29 0:00 PW No Violations