If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-117-24270 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.39,"lon":-82.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morrow | |
Municipality: Peru Township | |
Operator Name: GEOPETRO LLC | |
Well Pad ID: | |
Farm/Lease Name: FFLH | |
License Status: Plugged and Abandoned | |
License Date: 2018-12-13 | |
Spud Date: 2018-12-13 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2018-12-19 | |
Well Total Depth: 2994.00 ft | |
Configuration: Vertical | |
Latitude: 40.390000 | |
Longitude: -82.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-12-13 | Proposed Formations:TRENTON THROUGH TREMPEALEAU, Issued Date:12/13/2018, Expired Date:12/12/2020 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-12-19 | |
Plugged/Abandoned | 2019-01-22 | |
Record Last Modified | 2019-03-08 | |
Construction Permit Expires | 2020-12-12 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1043532840 | 2019-4-9 0:00:0 | PB | No Violations | |
-1348001055 | 2018-12-17 0:00 | DD | No Violations | |
-1581003194 | 2019-4-15 0:00: | DD | No Violations | |
-1992280933 | 2019-1-28 0:00: | PB | No Violations | |
-2141347183 | 2019-4-22 0:00: | PB | No Violations | |
-549378057 | 2018-12-14 0:00 | DD | No Violations | |
-953520244 | 2019-4-17 0:00: | DD | No Violations | |
0172204484 | 2019-04-11 | Plug / Plug Back | No Violations | Fishburn moved a frac tank to the entrance and began pumping the pits lower as requested. Closure to occurs as weather permits. |
0295077301 | 2018-12-10 | Drill / Deepen / Reopen | No Violations | Fishburn is currently building the location. |
0460666445 | 2018-12-28 | Drill / Deepen / Reopen | No Violations | Kilbarger #5 rigged down and moved off hole, but remains stacked out on location. |
0485967758 | 2018-12-13 | Drill / Deepen / Reopen | No Violations | Fishburn Services hauled in fresh water and brine (two separate trucks). Permit issued at approximately 10:49 am. Kilbarger #5 spud at 4:10 pm with 12.25 inch PDC bit on fresh water mud. Cellar and mud pit lined. Approximately 46 feet of drift. |
0549378057 | 2018-12-14 | Drill / Deepen / Reopen | No Violations | Inspect drilling location and met with the tool pusher and operators drilling engineer to discuss and check surface casing cementing plan. Independently test mix water (40 degrees/46 ppm/7 ph). Inspected 10 joints, new 20# 8.625 inch surface casing on the racks with guide shoe installed on the bottom joint. Two new bow spring centralizers on location. Fishburn Services track hoe operator was digging the air pit. Status: ok. |
0953520244 | 2019-04-17 | Drill / Deepen / Reopen | No Violations | Fishburn started emptying the air pit. Waiting on additional frac tanks. |
1043532840 | 2019-04-09 | Plug / Plug Back | No Violations | Check chloride content of pits and met with Fishburn on location who is closing the pits and performing the final restoration-they also built the location. |
1234832721 | 2019-01-22 | Plug / Plug Back | No Violations | 1/22/2019 resume plugging operations after thawing out equipment and water. 12:00 pm Staged Huffman Bowers #8 bulk truck and Fishburn brine truck emptied the steel half tank. 12:43 pm Cemenco hooked up and began pumping-tubing pressured up to 750 pounds. 12:55 pm Berry Well Service began tripping the bit: pulled three joints and hooked up Cemenco who was able to clear the tubing. *Cemenco mixed and displaced 38 sacks Class A cement Plug #3 (898-748 Newburg), plug down 1:15 pm (*est./unwitnessed). Berry laid down tubing. 1:30 pm Cemenco hooked up pumped 30 bbls of fresh water ahead to clear the surface casing. 1:45 pm mixed 69 sacks Class A neat cement Plug #4 (542-342 Bottom-of-Surface), displaced with 1.3 bbls fresh water. Plug down: 1:54 pm. Berry laid down tubing. 2:15 pm Cemenco hooked up and circulated top of casing. 2:16 pm mixed and displaced 36 sacks Class A neat cement plug #5 (120-0 top-of-surface). 2:19 pm cement circulated to the surface. Berry laid down the tubing and Cemenco topped off the casing by gravity and placed metal identification tag on casing and rigged down. Plugging operation co-witnessed by Geopetro representative Mr. Eric Brown (plugs #4/5) and Berry Well Service representative Mr. Donny Strange (plugs#1-5). |
1348001055 | 2018-12-17 | Drill / Deepen / Reopen | No Violations | Kilbarger #5 currently soaping at 1801 feet in shale. DV survey at 1750 feet-1.75 degrees. Air pit lined, flowline and chokes lines-chained and staked. Bop installed. Status: ok. |
1548444816 | 2019-01-18 | Plug / Plug Back | No Violations | Berry Well Service ran in the openhole with 2.375 inch tubing and a 3.875 inch button bit. Set down on shale bridge at approximately 1900 feet and began clean/drill out. Averaged 45-60 minute Kellys with bit torques in the shale section. Wellbore cleared in the Trenton (+-2400) but Berry set down with the tubing/bit on hole cavings/debris at 2758 feet, 236 feet short of total depth (2994). After discussions, the decision was made to plug the well out from 2758-to avoid losing the hole. 3:32 pm Cemenco hooked up and began pumping. 3:34 pm broke circulation and cleared the tubing and bit. 3:36 pm mixed 72 sacks Class A neat cement Plug #1 (2758-2508 Trempealeau), displaced with 9.6 bbls fresh water through the tubing inside the 7.875 inch openhole. Plug down: 3:43 pm at 500 pounds. *Berry Well service pulled tubing to 2322 and set Plug #2 (2322-2172 Trenton) Class A (2% gel) pulled tubing up past the shale section and shut down for the weekend (*unwitnessed). |
1581003194 | 2019-04-15 | Drill / Deepen / Reopen | No Violations | Fishburn has drained and closed the fluid pit. Started draining the air pit-pumping fluid into frac tanks parked at the road. |
172204484 | 2019-4-11 0:00: | PB | No Violations | |
1816626699 | 2020-4-20 0:00: | PB | No Violations | |
1888984643 | 2019-6-14 0:00: | DD | No Violations | |
1992280933 | 2019-01-28 | Plug / Plug Back | No Violations | On-site to witness Mr. Kenny Smith cut off the casing 36 inches below ground level and weld on the identification plate/photo-documented. Mr. Kevin Mullins buried the well casing. |
2108673321 | 2018-12-27 | Drill / Deepen / Reopen | No Violations | Kilbarger #5 rigging down, met with the tool pusher. Contacted the operator as a reminder to watch the drilling pit levels before predicted rains. |
2141347183 | 2019-04-22 | Plug / Plug Back | No Violations | Fishburn Services has closed the air pit, removed all debris and replaced the topsoil and graded. Landowner waiver needed for entrance and culvert. Status: contacted operator by email with waiver request. |
295077301 | 2018-12-10 0:00 | DD | No Violations | |
460666445 | 2018-12-28 0:00 | DD | No Violations | |
485967758 | 2018-12-13 0:00 | DD | No Violations |
For data sources see[3]