If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-23980 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-82.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Licking Township | |
Operator Name: MURPHY OIL COMPANY INC | |
Well Pad ID: | |
Farm/Lease Name: SMITH RICHARD & MOODY CHARLES | |
License Status: Final Restoration | |
License Date: 2014-07-10 | |
Spud Date: 1977-10-11 | |
Spud Drilling Contractor: | |
Final Drill Date: 1977-11-09 | |
Well Total Depth: 3283.00 ft | |
Configuration: Vertical | |
Latitude: 40.030000 | |
Longitude: -82.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1977-10-11 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
Completed | 1977-11-09 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
Reached Total Depth | 1977-11-09 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
Completion Report Received | 1977-12-08 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
Change of Owner | 2003-02-26 | Operator changed from 1836, SMITH RICHARD L to 1811, BYERS DONALD D |
Change of Owner | 2003-06-19 | Operator changed from 1811, BYERS DONALD D to 516, MURPHY OIL CO |
APP | 2014-07-10 | Proposed Formations:CLINTON, Issued Date:7/10/2014, Expired Date:7/9/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2015-09-25 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
Construction Permit Expires | 2016-07-09 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
Record Last Modified | 2017-02-15 | INFERRED SMITH OWNERSHIP FROM THE FACT HE OWNS OTHER WELLS ON HIS PROPERTY AND PRO ENERGY SERVICES IS OUT OF BUSINESS R.L. & R.I. 11/16/77 IP. A.F. 1.23MMFG & 2BO |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3220 | 3248 | 21 |
3220 | 3248 | 21 | |
3220 | 3248 | 21 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 51000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | MURPHY OIL COMPANY INC | 0.00 | 0.00 | 0 |
2012 | MURPHY OIL COMPANY INC | 0.00 | 0.00 | 0 |
2013 | MURPHY OIL COMPANY INC | 0.00 | 0.00 | 0 |
2014 | MURPHY OIL COMPANY INC | 0.00 | 0.00 | 0 |
2015 | MURPHY OIL COMPANY INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | MURPHY OIL COMPANY INC | Brine | 0 | 0 |
2012 | MURPHY OIL COMPANY INC | Brine | 0 | 0 |
2013 | MURPHY OIL COMPANY INC | Brine | 0 | 0 |
2014 | MURPHY OIL COMPANY INC | Brine | 0 | 0 |
2015 | MURPHY OIL COMPANY INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-295945999 | 2016-5-16 0:00: | FR | No Violations | 1.00 |
-745309118 | 2017-1-3 0:00:0 | FR | No Violations | 1.00 |
0295945999 | 2016-05-16 | Final Restoration | No Violations | The purpose of the inspection is a Final Restoration. The Final Restoration did not pass. The vegetation is sparse on the lease road and on the well site. All the equipment has been removed. Seed and mulch need performed to establish good vegetation. I will call Bill Mitton. |
0745309118 | 2017-01-03 | Final Restoration | No Violations | Final Restoration passed on 1-3-17 by Patrick Shreve. Well was plugged in compliance OAC 1501-9-11. The land was restored back under ORC 1509.072. The weather was rainy and 52 degrees Fahrenheit |
1296997242 | 2015-09-23 | Plug / Plug Back | No Violations | Berrys well service had set a cast plug on the part of 3.5quick set pipe at 868. Then ran 1.5tubing down to the cast and Cemenco set the cement plug at 844-400. This plug would be the Berea plug and the bottom of the surface plug combined. After tubing was pulled out there was cement on the lower joints verifying the cement. Then checked cement level and plug was at 400. Berrys well service tighten joints down at the surface and then started ripping on the 8.625casing. There is some large holes on the 8.625 casing at 300- 250. The rig had to run 3 bands on the ripper knife to get through this area so the knife would not set. |
1442919605 | 2015-09-21 | Plug / Plug Back | No Violations | Berrys well service is over the well with rig running 1.5tubing past a tight spot of 910. They are running tubing to 3200 in the 3.5casing. They set down at 2146. They are going to bring the rig pump in to wash the 1.5tubing down. Donny Strange with Berrys called and stated that the tubing would not go and the tubing almost got stuck in the 3.5casing. They pulled back to 2080 and Appalachian wireline will perforate hole and then try to spot bottom plug. |
1443142751 | 2015-09-24 | Plug / Plug Back | No Violations | Berrys well service was ripping on 8.625casing at 250. They ripped on the pipe for several hours with 40,000lbs of tension and 3of stretch. Then worked pipe and started to bring the ripping knife up and try at 200. Ripped several hours there. Then the decision was made to back off the casing. 21 was brought out of the well. There was heavy clay on the back side of the casing. Berrys will grout the well in tomorrow. |
1443382537 | 2015-09-25 | Plug / Plug Back | No Violations | Cemenco had set a surface plug of 200-0. They ran 80 sacks of regular class A cement. Cement dropped back and then Cemenco topped off. |
1656371350 | 2015-09-22 | Plug / Plug Back | No Violations | Berrys well service has Appalachian wireline out on site to perforate 3.5Quick Set pipe. The tubing has slots cut in the 1.5tubing at the bottom. The shot will not drop thru the tubing so they shot at 2083. Then Cemenco cemented thru the 1.5tubing . They set a cement plug at the Big Lime from 2083-1883. Berrys well service retrieved the 3.5Quik set pipe out. The pipe was parted at 968. |
1866463740 | 2017-02-03 | Final Restoration | No Violations | On the day of my inspection surveyor Tom Smith and I inspector Patrick Shreve went into the site where the well was plugged and verified with the GA-52CX the location of the well and then updated the coordinates with the Trimble unit. The Final Restoration passed on 8-1-16 by Patrick Shreve. |
For data sources see[9]