34-119-27229

Well Details

Well ID: 34-119-27229
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Newton Township
Operator Name: PORTER PETROLEUM
Well Pad ID:
Farm/Lease Name: RUSSELL L
License Status: Producing
License Date: 1985-11-05
Spud Date: 1985-12-14
Spud Drilling Contractor:
Final Drill Date: 1985-12-19
Well Total Depth: 3465.00 ft
Configuration: Vertical
Latitude: 39.830000
Longitude: -82.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1985-01-02 Issued Date 12/31/84 Expired Date Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth Proposed Drill Depth
CO 1985-11-05 1278 CLYMAR, INC GeoDate 11/5/85
Oil and Gas 1985-11-05 Issued Date 11/5/85 Expired Date 11/5/86 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03465 Proposed Drill Depth 03465
Original Spud 1985-12-14 RI 11-9-85 RI. 11/09/1985
Completed 1985-12-19 RI 11-9-85 RI. 11/09/1985
Reached Total Depth 1985-12-19 RI 11-9-85 RI. 11/09/1985
CO 1986-07-01 1278 CLYMAR, INC GeoDate 1/2/85
Completion Report Received 1986-07-10 RI 11-9-85 RI. 11/09/1985
Construction Permit Expires 1986-11-05 RI 11-9-85 RI. 11/09/1985
CO 1996-09-17 5512 NEWSTAR ENERGY USA INC GeoDate 11/5/85
Change of Owner 1999-01-11 Operator changed from 5512, NEWSTAR ENERGY USA INC to 5658, PORTER PETROLEUM
Last Compliance Report 2015-12-14 RI 11-9-85 RI. 11/09/1985
Record Last Modified 2017-02-15 RI 11-9-85 RI. 11/09/1985

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3350 3370 2
3350 3370 2
3350 3370 2

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 300 Gal 80000
H2O 0 90000 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 BAKERWELL INC 940.00 209.00 360
1988 BAKERWELL INC 975.00 221.00 365
1990 BAKERWELL INC 0.00 140.00 75
1991 CLYMAR, INC 1469.00 253.00 365
1992 CLYMAR, INC 601.00 203.00 365
1993 CLYMAR, INC 535.00 211.00 365
1994 CLYMAR, INC 301.00 139.00 365
1995 CLYMAR, INC 427.00 126.00 365
1996 NEWSTAR ENERGY USA INC 292.00 126.00 365
1997 NEWSTAR ENERGY USA INC 0.00 187.00 365
2001 PORTER PETROLEUM 0.00 130.00 365
2002 PORTER PETROLEUM 0.00 126.00 365
2003 PORTER PETROLEUM 0.00 105.00 365
2004 PORTER PETROLEUM 0.00 126.00 365
2005 PORTER PETROLEUM 0.00 116.00 365
2006 PORTER PETROLEUM 0.00 114.00 365
2007 PORTER PETROLEUM 0.00 118.00 365
2008 PORTER PETROLEUM 0.00 108.00 365
2009 PORTER PETROLEUM 0.00 84.00 365
2010 PORTER PETROLEUM 0.00 86.00 365
2011 PORTER PETROLEUM 0.00 82.00 365
2012 PORTER PETROLEUM 0.00 74.00 366
2013 PORTER PETROLEUM 0.00 76.00 365
2014 PORTER PETROLEUM 0.00 57.00 365
2015 PORTER PETROLEUM 0.00 37.00 365
2016 PORTER PETROLEUM 0.00 31.00 365
2017 PORTER PETROLEUM 0.00 38.00 365
2018 PORTER PETROLEUM 0.00 44.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 BAKERWELL INC Brine 0 360
1988 BAKERWELL INC Brine 0 365
1990 BAKERWELL INC Brine 0 75
1991 CLYMAR, INC Brine 70 365
1992 CLYMAR, INC Brine 70 365
1993 CLYMAR, INC Brine 100 365
1994 CLYMAR, INC Brine 55 365
1995 CLYMAR, INC Brine 50 365
1996 NEWSTAR ENERGY USA INC Brine 41 365
1997 NEWSTAR ENERGY USA INC Brine 62 365
2001 PORTER PETROLEUM Brine 60 365
2002 PORTER PETROLEUM Brine 48 365
2003 PORTER PETROLEUM Brine 50 365
2004 PORTER PETROLEUM Brine 64 365
2005 PORTER PETROLEUM Brine 76 365
2006 PORTER PETROLEUM Brine 60 365
2007 PORTER PETROLEUM Brine 65 365
2008 PORTER PETROLEUM Brine 65 365
2009 PORTER PETROLEUM Brine 40 365
2010 PORTER PETROLEUM Brine 60 365
2011 PORTER PETROLEUM Brine 60 365
2012 PORTER PETROLEUM Brine 60 366
2013 PORTER PETROLEUM Brine 40 365
2014 PORTER PETROLEUM Brine 27 365
2015 PORTER PETROLEUM Brine 12 365
2016 PORTER PETROLEUM Brine 16 365
2017 PORTER PETROLEUM Brine 10 365
2018 PORTER PETROLEUM Brine 8 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1165410773 2015-10-5 0:00: PW No Violations 3.00
-182348074 2017-1-9 0:00:0 AM No Violations 0.50
-259693850 2015-9-14 0:00: TD No Violations 2.00
-297488134 2015-9-15 0:00: PW No Violations 3.50
-537155656 2015-9-15 0:00: PW No Violations 2.00
-797251066 2015-9-14 0:00: PW No Violations
-840184999 2015-9-15 0:00: AM No Violations
0000PL8077 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0122742044 2005-08-12 Production Wells No Violations
0182348074 2017-01-09 Administrative Inspection No Violations The purpose of the Administrative inspection is due to a Compliance Follow-up to number --9-17.
0259693850 2015-09-14 Temporary Abandoned Annular Disposal No Violations TAAD Well is not hooked up for annular disposal.
0297488134 2015-09-15 Production Wells No Violations Brent and I looked at the oil mess around the pumping unit due to packing in the stuffing box is leaking. Then we looked at the brine scald and the mess that needs cleaned up around the tanks and toward the strip mine pond.
0537155656 2015-09-15 Production Wells No Violations I stopped by location to take a control sample cs-1. Then I took field samples fs-4 and 5. I will check before meeting tomorrow.
0714404607 2016-02-23 Production Wells No Violations 10:00-11:00hrs 119-27229 well owned by Porter Petroleum. This inspection is a Compliance Follow-up to #-797251066. There is vegetation on the soils that had a scald from brine. The vegetation is good and binding. There were no issues at well. There will need to be a bull plug on the piping at the valves below the poly tank. Supervisor called Company and explained what needed done. He was instructed to call Patrick Shreve on the completion of the installation of the plug.

Well coordinates are 39.8399,- Tank coordinates are 39.84018,-

0797251066 2015-09-14 Production Wells Violations Noted Well is supplied with pumping unit and tubing head. The tubing annulus and the rod annulus are open. The packing was leaking at the polish rod and had sprayed crude around the pumping unit. There is 100 barrel tank and a 30 barrel poly tank. They are connected at the bottom. There is a dike and identification in place. There is a 2line coming off of the bottom of the tanks and is laying over the dike. There is a large scald from end of 2line that is approximately 80-100 down over the hill and is 20-30wide. Then it hits a rock trough. From there it approximately 150down over hill again until it drops straight down over high wall and into strip mine pond that is full of fresh water. The strip mine pond approximately measures .25 to .5 acre. I took field samples to verify where the brine was in the soil. Field Sample 1 or (FS #1) had cords at 39.84015,-82.13953. This was end of dump line and the chlorides were above 6300ppm. FS#2 was at cords 39.84019,-82.13944. This sample was approximately 75down slope. The chlorides were above 3600ppm. FS#3 cords were at 39.84026,-82.13941. The chlorides were over 2400ppm. FS#4 was at cords of 39.84006,-82.13918. The chlorides were above 5700 ppm.This sample was approximately 250-300 down slope. FS#5 was at cords 39.84081,-82.13965. This sample was taken 40north of tank battery. The sample had less than 31ppm of chlorides. There was a control sample taken at cords 39.84026,-82.13980. The sample was taken at 33west of the tank battery. The sample had less than 31ppm of chlorides.
0840184999 2015-09-15 Administrative Inspection No Violations I called Darrel Porter and no answer. He was going to be notified of the situation at the well and the tanks.
1165410773 2015-10-05 Production Wells No Violations I entered the well site and Darrel Porter and his contractor Andy Browning is loading up the equipment and pulling out. He failed to notify the inspector Patrick Shreve of starting the work. Work was initiated on 10-4-15. They bio-remediated over the scald. There was no soil removed. Then they enlarged the trough and the contractor had a small poly tank and flushed the soil and hauled the brine water to Porters house. The contractor was not a licensed UIC Hauler. I stated that hauling brine water is regulated under Underground Injection Control (UIC). I took pictures of the work they done. I took a field sample at the new trough made by Browning and tested the soil at the sump. The sample showed below 31 ppm.
1186685488 2015-09-29 Production Wells No Violations I stopped by site to see if company started the clean up. They cleaned up oil at the well head. They have fixed the packing at the stuffing box on the pumping unit. They did not start on any brine scald clean up below the tanks. I called company and they stated that they had till October and I told them that the company had 7 days from the 9-16-15 only. She stated that Darrel was on vacation and would be back on October 3rd, 2015. I stated to have Darrel call me when he gets back.
122742044 2005-8-12 0:00: PW No Violations
1262866106 2010-01-06 Annular Disposal No Violations AD not in use. Well is producing, no problems noted.
1443536715 2015-09-16 Production Wells No Violations Brent Bear and I met with Darrel Porter of Porter Petroleum. We explained the samples that were taken and the process of clean up. The soil is to be removed and was allowed to be bio-remediated on site. The soil would be from end of dump line to top of rock trough. The soil would be dug down to virgin soil and placed on a liner that is going to be liquid tight and incorporate lime to neutralize the soil. Then place a liner catch basin at where the FS #4 was and flush with fresh water to bring the chloride levels down. The rock trough is unstable and should not be disturbed. There was verbal Compliance Notice issued from this date of 9-16-15. The agreement between us was 1 full week. He was to notify me when he would be in on the location.
1481557958 2016-12-12 Production Wells No Violations

-off device. The gas will have to be flared or sold into a production line. There is 1-

1487080967 2017-02-13 Production Wells No Violations The purpose of my inspection is due to Compliance Follow-up to number --787-
714404607 2016-2-23 0:00: PW No Violations 1.00
PL8077 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0797251066 US-OH-129068 2017-01-27 Well operation causing pollution and contamination
0797251066 US-OH-129069 2017-01-27 Well insufficiently equipped to prevent escape of oil and gas

For data sources see[9]

References