If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-119-27276 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.96,"lon":-81.86,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Perry Township | |
| Operator Name: CAMERON PRODUCTION CO INC | |
| Well Pad ID: | |
| Farm/Lease Name: PATTON MARILYN | |
| License Status: Producing | |
| License Date: 1985-04-22 | |
| Spud Date: 1985-06-15 | |
| Spud Drilling Contractor: EASY DRILLING | |
| Final Drill Date: 1985-06-17 | |
| Well Total Depth: 4266.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.960000 | |
| Longitude: -81.860000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1985-04-22 | Issued Date 4/22/85 Expired Date 10/19/85 Acres 0080000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 04266 Proposed Drill Depth 04266 |
| Original Spud | 1985-06-12 | |
| Completed | 1985-06-17 | |
| Reached Total Depth | 1985-06-17 | |
| CO | 1985-06-25 | 81 CAMERON BROTHERS GeoDate 4/22/85 |
| Completion Report Received | 1985-06-26 | |
| Construction Permit Expires | 1985-10-19 | |
| CO | 1996-04-22 | 1720 CAMERON PROD CO INC GeoDate 4/22/85 |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4082 | 4124 | 0 |
| 4082 | 4124 | 0 | |
| 2006-09-11 | 4086 | 4194 | 19 |
| 4086 | 4194 | 19 | |
| 4082 | 4124 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2000 Bbl | 50000 | FRAC;H2O,SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | CAMERON BROTHERS | 3064.00 | 207.00 | 0 |
| 1986 | CAMERON BROTHERS | 14093.00 | 336.00 | 365 |
| 1987 | CAMERON BROTHERS | 19386.00 | 288.00 | 365 |
| 1988 | CAMERON BROTHERS | 14832.00 | 102.00 | 365 |
| 1989 | CAMERON BROTHERS | 15793.00 | 433.00 | 365 |
| 1990 | CAMERON BROTHERS | 16085.00 | 251.00 | 365 |
| 1991 | CAMERON BROTHERS | 20706.00 | 342.00 | 365 |
| 1992 | CAMERON BROTHERS | 111765.00 | 191.00 | 365 |
| 1993 | CAMERON BROTHERS | 9519.00 | 137.00 | 365 |
| 1994 | CAMERON BROTHERS | 10409.00 | 97.00 | 365 |
| 1995 | CAMERON BROTHERS | 4890.00 | 137.00 | 365 |
| 1996 | CAMERON PRODUCTION CO INC | 5725.00 | 83.00 | 0 |
| 1997 | CAMERON PRODUCTION CO INC | 8636.00 | 37.00 | 365 |
| 1998 | CAMERON PRODUCTION CO INC | 9112.00 | 94.00 | 365 |
| 2000 | CAMERON PRODUCTION CO INC | 4095.00 | 0.00 | 365 |
| 2001 | CAMERON PRODUCTION CO INC | 4153.00 | 52.00 | 365 |
| 2002 | CAMERON PRODUCTION CO INC | 3721.00 | 94.00 | 365 |
| 2003 | CAMERON PRODUCTION CO INC | 3382.00 | 39.00 | 365 |
| 2004 | CAMERON PRODUCTION CO INC | 1164.00 | 34.00 | 365 |
| 2005 | CAMERON PRODUCTION CO INC | 2282.00 | 0.00 | 365 |
| 2006 | CAMERON PRODUCTION CO INC | 2156.00 | 106.00 | 365 |
| 2007 | CAMERON PRODUCTION CO INC | 2952.00 | 35.00 | 365 |
| 2008 | CAMERON PRODUCTION CO INC | 2156.00 | 106.00 | 365 |
| 2009 | CAMERON PRODUCTION CO INC | 1134.00 | 0.00 | 365 |
| 2010 | CAMERON PRODUCTION CO INC | 806.00 | 0.00 | 365 |
| 2011 | CAMERON PRODUCTION CO INC | 1350.00 | 0.00 | 0 |
| 2012 | CAMERON PRODUCTION CO INC | 1592.00 | 88.00 | 366 |
| 2013 | CAMERON PRODUCTION CO INC | 1789.00 | 0.00 | 365 |
| 2014 | CAMERON PRODUCTION CO INC | 1055.00 | 0.00 | 365 |
| 2015 | CAMERON PRODUCTION CO INC | 2099.00 | 88.00 | 365 |
| 2016 | CAMERON PRODUCTION CO INC | 2486.00 | 0.00 | 365 |
| 2017 | CAMERON PRODUCTION CO INC | 2338.00 | 15.00 | 365 |
| 2018 | CAMERON PRODUCTION CO INC | 2443.00 | 0.00 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0000PL8047 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 1950289594 | 2004-07-15 | Production Wells | No Violations | Way back in |
| PL8047 | PL | No Violations |
For data sources see[9]