If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-27816 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Hopewell Township | |
Operator Name: HOPEWELL OIL & GAS DEVELOPMENT | |
Well Pad ID: | |
Farm/Lease Name: HILL ELLIS | |
License Status: Final Restoration | |
License Date: 2014-05-07 | |
Spud Date: 1993-07-28 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 1993-08-27 | |
Well Total Depth: 5529.00 ft | |
Configuration: Vertical | |
Latitude: 39.910000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1993-07-23 | Issued Date 7/24/93 Expired Date 7/24/94 Acres 0040000 Tool Type RTAF Proposed Formation ROSE RUN Proposed Depth 05529 Proposed Drill Depth 05529 |
Original Spud | 1993-07-28 | RBDMS Rec |
Completed | 1993-08-27 | RBDMS Rec |
Reached Total Depth | 1993-08-27 | RBDMS Rec |
CO | 1993-11-15 | 1 HOPEWELL OIL & GAS DEV CO GeoDate 7/23/93 |
Completion Report Received | 1993-12-06 | RBDMS Rec |
APP | 2014-05-07 | Proposed Formations:ROSE RUN, Issued Date:5/7/2014, Expired Date:5/6/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-08-19 | RBDMS Rec |
Construction Permit Expires | 2016-05-06 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5472 | 5529 | 0 |
5472 | 5529 | 0 | |
5472 | 5529 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | NONE |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1483588916 | 2016-3-16 0:00: | FR | No Violations | 1.00 |
0000002169 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 7/18/94 INSPECTOR GERALD YOUNG DATE 07/1819/94 DATA FROM OLD VAX INFO | |
1407941842 | 2014-08-13 | Plug / Plug Back | No Violations | Hopewell has rig over well and is setting bottom hole plug thru 2.875tubing. Hopewell pulled the mud anchor out and ran tubing back in. Formation Cementing spotted cement plug to 5529-5075. No circulation. A balanced plug was set. Formation ran 50 sacks of cement. |
1408464890 | 2014-08-18 | Plug / Plug Back | No Violations | Appalachian wireline was in on location to shoot 5.5casing off. They shot casing off at 3952 and fluid was down at 700. The pipe was dragging up the hole and hanging up. They started pulling free. Laid 11 joints out and waited on cementers. They did not show up due to a break down. Will start at 8:00 am on 8-19-14. |
1408543073 | 2014-08-19 | Plug / Plug Back | No Violations | Zane Petroleum had company rig that was plugging well and had Formation Cementing setting the cement plugs thru the 5.5 casing. The clinton/ rip plug was placed at 3469-3169. They ran 75 sacks of 2% gel and 2%CaCl. The Lime plug was set 2531-2331. Ran 50 sacks of 2 %gel and 2%CaCl. The Bottom of the surface Plug was set at 1341-1141. Formation Cementing set 51 sacks of 2 %gel and 2% CaCl. The surface plug was set from 200-0 with 59 sacks of cement @2%gel after setting bridge plug at 200. None of the plugs circulated. Fluid level stayed at 200 level. |
1483588916 | 2016-03-16 | Final Restoration | Violations Noted | The Final Restoration did not pass because 250 of 2flow line was on top of ground and the tanks were still on site. There were 1-210 barrel steel tank and 1-100 barrel steel tank. There was a verticle separator and a horizontal separator left. Remove the equipment within 60 days from receiving the violation. |
1986299100 | 2015-05-11 | Final Restoration | No Violations | On my inspection I found that the location had been restored according to 1509.072. I passed the final restoration at this time. I also spoke with the Land owner who is pleased with the restoration site. |
2169 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1483588916 | US-OH-113765 | 2016-04-19 | Failure to complete final restoration within six months | |
1483588916 | US-OH-113766 | 2016-04-19 | Failure to remove production equip. within 6 mos. REPLACE |
For data sources see[9]