If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28154 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9,"lon":-82.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Newton Township | |
Operator Name: BAKERWELL INC | |
Well Pad ID: | |
Farm/Lease Name: BURCHFIELD UNIT | |
License Status: Final Restoration | |
License Date: 2013-03-12 | |
Spud Date: 1997-12-04 | |
Spud Drilling Contractor: CRYSTAL DEVELOPMENT | |
Final Drill Date: 1997-12-15 | |
Well Total Depth: 5550.00 ft | |
Configuration: Directional | |
Latitude: 39.900000 | |
Longitude: -82.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1997-12-02 | 254 EDCO DRILLING & PRODUCING Proposed Formation CLINTON thru ROSE RUN Issued Date 12/2/97 Expired Date 12/2/98 6:00:00 AM |
Original Spud | 1997-12-04 | RBDMS Rec |
Completed | 1997-12-15 | RBDMS Rec |
Reached Total Depth | 1997-12-15 | RBDMS Rec |
Completion Report Received | 1998-03-09 | RBDMS Rec |
Correction to Well | 1998-03-26 | CORRECTION IN TARGET FOOTAGE DESCRIPTION. TARGET SHOULD BE 1036'NL & 528'WL OF SEC. 2 (W); X AND Y TARGET COORDINATES CORRECTED TO X=2,095,156 AND Y=694,498; TARGET ELEVATION SHOULD BE 815 AND SOURCE OF LOCATION--AS DRILLED SURVEYOR'S PLAT. |
Change of Owner | 2007-06-06 | Operator changed from 254, EDCO DRILLING & PRODUCING to 432, BAKERWELL INC |
APP | 2010-07-06 | Proposed Formations:ROSE RUN, Issued Date:7/6/2010, Expired Date:7/6/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
APP | 2013-03-12 | Proposed Formations:ROSE RUN, Issued Date:3/12/2013, Expired Date:3/12/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-04-07 | RBDMS Rec |
Construction Permit Expires | 2015-03-12 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | EDCO DRILLING & PRODUCING | 69094.00 | 166.00 | 365 |
2000 | EDCO DRILLING & PRODUCING | 35187.00 | 212.00 | 365 |
2001 | EDCO DRILLING & PRODUCING | 17413.00 | 960.00 | 365 |
2002 | EDCO DRILLING & PRODUCING | 584.00 | 243.00 | 60 |
2003 | EDCO DRILLING & PRODUCING | 49.00 | 602.00 | 300 |
2005 | EDCO DRILLING & PRODUCING | 0.00 | 313.00 | 365 |
2006 | EDCO DRILLING & PRODUCING | 0.00 | 155.00 | 365 |
2007 | BAKERWELL INC | 0.00 | 0.00 | 365 |
2008 | BAKERWELL INC | 0.00 | 0.00 | 365 |
2009 | BAKERWELL INC | 0.00 | 67.00 | 365 |
2010 | BAKERWELL INC | 0.00 | 32.00 | 365 |
2011 | BAKERWELL INC | 0.00 | 25.00 | 365 |
2012 | BAKERWELL INC | 0.00 | 0.00 | 366 |
2013 | BAKERWELL INC | 0.00 | 0.00 | 365 |
2014 | BAKERWELL INC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | EDCO DRILLING & PRODUCING | Brine | 0 | 365 |
2000 | EDCO DRILLING & PRODUCING | Brine | 110 | 365 |
2001 | EDCO DRILLING & PRODUCING | Brine | 70 | 365 |
2002 | EDCO DRILLING & PRODUCING | Brine | 210 | 60 |
2003 | EDCO DRILLING & PRODUCING | Brine | 300 | 300 |
2005 | EDCO DRILLING & PRODUCING | Brine | 0 | 365 |
2006 | EDCO DRILLING & PRODUCING | Brine | 0 | 365 |
2007 | BAKERWELL INC | Brine | 0 | 365 |
2008 | BAKERWELL INC | Brine | 0 | 365 |
2009 | BAKERWELL INC | Brine | 675 | 365 |
2010 | BAKERWELL INC | Brine | 370 | 365 |
2011 | BAKERWELL INC | Brine | 0 | 365 |
2012 | BAKERWELL INC | Brine | 0 | 366 |
2013 | BAKERWELL INC | Brine | 0 | 365 |
2014 | BAKERWELL INC | Brine | 45 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1489090163 | 2014-4-4 0:00:0 | PB | No Violations | 5.00 |
-318137109 | 2014-8-13 0:00: | FR | No Violations | 0.50 |
0318137109 | 2014-08-13 | Final Restoration | No Violations | Final Restoration passed on 8-13-14 by Patrick Shreve. |
1396529921 | 2014-04-02 | Plug / Plug Back | No Violations | Baker well shot pipe off at 4370 with Appalachain wirline. The joints are 44 long. They are dragging and the rig is pulling 80,000lbs. The pipe weighs 15.5lb/ft so the string weight would be 67,735lbs. Hooked Formation to string and pumped on casing. There was 800 psi on fluid pressure. They pulled 6 joints after getting pipe moving. From 4106-3906 set a Trenton plug. Pulled up to the Clinton plug and shut down. No circulation at this point. |
1396623836 | 2014-04-03 | Plug / Plug Back | No Violations | Bakerwell pulled 5.5casing up to 3468 to set Clinton plug. The plug was at 3468-3257. The cement plug was set with class A cement and 2% CaCl with Cotton seed hulls. There was no circulation. The decision was made to pull all casing and run tubing after tagging cement top. |
1396762631 | 2014-04-01 | Plug / Plug Back | No Violations | Setting Bottom plug on well. Bakerwell is running 2.375upset 8 round tubing. Formation is going to pump the cement plug at 5474. There is 100 of 4.875open hole and 5.5casing is at 5336. Formation pumped 60 sacks of regular class A cement. Plug was set at 5474-5074. There was good circulation. |
1396888533 | 2014-04-07 | Plug / Plug Back | No Violations | The 2.375upset tubing was ran to depth of 2466. The Big Lime was set from 2466-2266. The bottom of the Surface was set at 1114-914 with 52 sacks ran of 2% gelled cement. Then tubing was pulled up to 350 where the plug was set at fluid level. From 350-150 set plug and ran 50 sacks of class A cement @ 2% gelled cement. The rig was instructed to pull all tubing out and then a bridge plug was set at 250. Then set top plug of 96 sacks of regular class A cement. Well did not drop back. |
1399229674 | 2014-04-08 | Plug / Plug Back | No Violations | Well was plugged and stopped in to check and see if cement dropped back. The plug was at top. |
1489090163 | 2014-04-04 | Plug / Plug Back | No Violations | Baker well was running tools in to tag cement plug. Set down was at 2970. The plug could have had cave in on top of plug. Rig was running 2.375tubing at 2466 for the lime plug. |
iDIAN00101 | 1999-05-03 | Preliminary Restoration | No Violations | |
iDIAN001014 | 1999-5-3 0:00:0 | PL | No Violations |
For data sources see[8]