X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28311

Well Details

Well ID: 34-119-28311
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Monroe Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: WATERS W
License Status: Plugged and Abandoned
License Date: 2014-06-12
Spud Date: 2001-01-02
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 2001-01-08
Well Total Depth: 4511.00 ft
Configuration: Vertical
Latitude: 40.110000
Longitude: -81.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2000-11-22 Proposed Formations:CLINTON, Issued Date:11/22/2000, Expired Date:11/22/2001 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2001-01-02 RBDMS Rec
Completed 2001-01-08 RBDMS Rec
Reached Total Depth 2001-01-08 RBDMS Rec
Completion Report Received 2001-03-01 RBDMS Rec
APP 2014-06-12 Proposed Formations:CLINTON, Issued Date:6/12/2014, Expired Date:6/11/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2015-01-28 RBDMS Rec
Construction Permit Expires 2016-06-11 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2001-05-15 4314 4349 20
4314 4349 20
4314 4349 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 57000 Gal 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2000 KNOX ENERGY INC. 0.00 0.00 0
2001 KNOX ENERGY INC. 4387.00 365.00 365
2002 KNOX ENERGY INC. 4446.00 145.00 365
2003 KNOX ENERGY INC. 2338.00 140.00 365
2004 KNOX ENERGY INC. 999.00 0.00 366
2005 KNOX ENERGY INC. 690.00 0.00 365
2006 KNOX ENERGY INC. 1197.00 190.00 365
2007 KNOX ENERGY INC. 1216.00 0.00 365
2008 KNOX ENERGY INC. 1892.00 125.00 365
2009 KNOX ENERGY INC. 1343.00 53.00 365
2010 KNOX ENERGY INC. 676.00 16.00 365
2011 KNOX ENERGY INC. 859.00 23.00 365
2012 KNOX ENERGY INC. 718.00 34.00 366
2013 KNOX ENERGY INC. 511.00 0.00 365
2014 KNOX ENERGY INC. 318.00 47.00 365
2015 KNOX ENERGY INC. 29.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2000 KNOX ENERGY INC. Brine 0 0
2001 KNOX ENERGY INC. Brine 0 365
2002 KNOX ENERGY INC. Brine 280 365
2003 KNOX ENERGY INC. Brine 110 365
2004 KNOX ENERGY INC. Brine 80 366
2005 KNOX ENERGY INC. Brine 0 365
2006 KNOX ENERGY INC. Brine 35 365
2007 KNOX ENERGY INC. Brine 70 365
2008 KNOX ENERGY INC. Brine 50 365
2009 KNOX ENERGY INC. Brine 80 365
2010 KNOX ENERGY INC. Brine 76 365
2011 KNOX ENERGY INC. Brine 70 365
2012 KNOX ENERGY INC. Brine 195 366
2013 KNOX ENERGY INC. Brine 0 365
2014 KNOX ENERGY INC. Brine 0 365
2015 KNOX ENERGY INC. Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-788205994 2006-11-27 0:00 PW No Violations
0788205994 2006-11-27 Production Wells No Violations Well is producing.
1422285684 2015-01-26 Plug / Plug Back No Violations I was called on 1-23-15 by Knox Energy on a full day of plugging by Bull heading the cement plug and then rip the 4.5casing and finish the plug job on the same day. The recent snowfall has changed the status of the work. Cemenco will not be able to make out for today.
1422624859 2015-01-28 Plug / Plug Back No Violations I was onsite to witness the plugging of this well. Knox Energy has a service rig on it to plug it. They called out Cemenco to set the cement plugs. The bottom plug was set from 4314-3914. They then ran in the hole and ripped the 4.5. The lime plug was set from 3076-2876. The pipe was pulled up to the Berea and a plug was set from1050-850. The rig crew then pulled up to the bottom of the 8 and set a plug from 626-426. Then they pulled the pipe up and set a 200ft surface plug. The cement stayed at the surface and did not settle. The well is now plugged.
iDIAN00611 2001-06-20 Preliminary Restoration No Violations
iDIAN006117 2001-6-20 0:00: PL No Violations

For data sources see[9]

References