If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-119-28319 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.95,"lon":-82.19,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Hopewell Township | |
| Operator Name: KENOIL LLC | |
| Well Pad ID: | |
| Farm/Lease Name: ASP CONSTRUCTION UNIT | |
| License Status: Final Restoration | |
| License Date: 2014-10-07 | |
| Spud Date: 2001-01-02 | |
| Spud Drilling Contractor: CAPSTAR DRILLING | |
| Final Drill Date: 2001-01-09 | |
| Well Total Depth: 5338.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.950000 | |
| Longitude: -82.190000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2000-12-27 | 627 KENOIL Proposed Formation KNOX (MAY NOT PRODUCE CLINTON) Issued Date 12/27/00 Expired Date 12/27/01 6:00:00 AM |
| Original Spud | 2001-01-02 | RBDMS Rec |
| Completed | 2001-01-09 | RBDMS Rec |
| Reached Total Depth | 2001-01-09 | RBDMS Rec |
| Completion Report Received | 2001-05-14 | RBDMS Rec |
| APP | 2014-10-07 | Proposed Formations:ROSE RUN, Issued Date:10/7/2014, Expired Date:10/6/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2015-05-28 | RBDMS Rec |
| Construction Permit Expires | 2016-10-06 | RBDMS Rec |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2001-07-11 | 5182 | 5187 | 11 |
| 2001-07-11 | 5208 | 5213 | 11 |
| 5182 | 5187 | 11 | |
| 5208 | 5213 | 11 | |
| 5225 | 5237 | 25 | |
| 5182 | 5187 | 11 | |
| 2001-07-11 | 5225 | 5237 | 25 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 15 | 2000 Gal | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | KENOIL LLC | 3457.00 | 1840.00 | 365 |
| 2002 | KENOIL LLC | 6039.00 | 884.00 | 365 |
| 2003 | KENOIL LLC | 6871.00 | 896.00 | 365 |
| 2004 | KENOIL LLC | 5785.00 | 439.00 | 365 |
| 2005 | KENOIL LLC | 3826.00 | 565.00 | 365 |
| 2006 | KENOIL LLC | 3326.00 | 482.00 | 365 |
| 2007 | KENOIL LLC | 2659.00 | 308.00 | 365 |
| 2008 | KENOIL LLC | 2050.00 | 284.00 | 365 |
| 2009 | KENOIL LLC | 1237.00 | 154.00 | 365 |
| 2010 | KENOIL LLC | 1360.00 | 211.00 | 365 |
| 2011 | KENOIL LLC | 1069.00 | 178.00 | 0 |
| 2012 | KENOIL LLC | 910.00 | 130.00 | 366 |
| 2013 | KENOIL LLC | 830.00 | 72.00 | 365 |
| 2014 | KENOIL LLC | 1252.00 | 130.00 | 365 |
| 2015 | KENOIL LLC | 0.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | KENOIL LLC | Brine | 4835 | 365 |
| 2002 | KENOIL LLC | Brine | 2300 | 365 |
| 2003 | KENOIL LLC | Brine | 1993 | 365 |
| 2004 | KENOIL LLC | Brine | 1445 | 365 |
| 2005 | KENOIL LLC | Brine | 2040 | 365 |
| 2006 | KENOIL LLC | Brine | 2190 | 365 |
| 2007 | KENOIL LLC | Brine | 1925 | 365 |
| 2008 | KENOIL LLC | Brine | 1975 | 365 |
| 2009 | KENOIL LLC | Brine | 2170 | 365 |
| 2010 | KENOIL LLC | Brine | 2145 | 365 |
| 2011 | KENOIL LLC | Brine | 2008 | |
| 2012 | KENOIL LLC | Brine | 1411 | 366 |
| 2013 | KENOIL LLC | Brine | 1505 | 365 |
| 2014 | KENOIL LLC | Brine | 1873 | 365 |
| 2015 | KENOIL LLC | Brine | 85 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1429210405 | 2008-1-16 0:00: | PW | No Violations | |
| 0391569193 | 2016-01-26 | Final Restoration | No Violations | Final Restoration passed on 1-26-16 by Patrick Shreve. Well was plugged in compliance OAC 1501-9-11. The land was restored back under ORC 1509.072. |
| 0940599725 | 2003-04-17 | Production Wells | No Violations | |
| 1156969264 | 2015-05-27 | Plug / Plug Back | No Violations | Moran Well service was trying to get 4.5casing ripped off at 4700 and was up to 3200. There was no telegraph and the casing only had 3 of stretch. Appalachian wireline was called in to run a bond log on the well. There was several tight spots up until 3100. Then the company will try shooting the casing at 3080. Moran pulled one joint of 4.5casing out. The rip and the Clinton plug will be set as a combination plug. |
| 1289i11456 | 2002-02-08 | Production Wells | No Violations | STATUS CHECK. |
| 1289i11456003 | 2002-2-8 0:00:0 | PW | No Violations | |
| 1394173933 | 2015-01-26 | Final Restoration | No Violations | 119-28319 well was plugged by Ken Oil and restored back and good vegetation has been established. Final Restoration passed on 1-26-16 by Patrick Shreve. Well was plugged in compliance OAC 1501-9-11. The land was restored back under ORC 1509.072. |
| 1429210405 | 2008-01-16 | Production Wells | No Violations | Producing pumpjack, no problems noted. |
| 1432311059 | 2015-05-22 | Plug / Plug Back | No Violations | Phil Moran has rig over the well. He pulled rods and Petroset has showed up to pump the bottom cement plug. They cleared the tubing and set the plug from 5207-4807. The plug has brought fluid level up to 300. |
| 1432839675 | 2015-05-28 | Plug / Plug Back | No Violations | Moran well service had 4.5 pipe shot off at 3080. They pulled up to 3060 and set Clinton /rip plug from 3060-2760. Petro-set cementing placed a 300 cement plug. Then Pulled up to 2305-2105 and set cement plug over the Big Lime top. Petro-set set a 200 cement plug. Then pulled up to 1000-800 and set the cement plug of 200 at the bottom of the surface pipe. Then pulled all the pipe pou and topped off with cement at 200-0. All plugs circulated and were placed thru the 4.5casing. |
| 391569193 | 2016-1-26 0:00: | FR | No Violations | 3.00 |
| 940599725 | 2003-4-17 0:00: | PW | No Violations | |
| iDIAN00611 | 2001-06-15 | Preliminary Restoration | No Violations | |
| iDIAN006118 | 2001-6-15 0:00: | PL | No Violations |
For data sources see[9]