If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28392 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99,"lon":-82.1,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Falls Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: APPERSON UNIT | |
License Status: Producing | |
License Date: 2002-03-28 | |
Spud Date: 2002-05-06 | |
Spud Drilling Contractor: PROFESSIONAL WELL SVC-PWS | |
Final Drill Date: 2002-05-10 | |
Well Total Depth: 3572.00 ft | |
Configuration: Vertical | |
Latitude: 39.990000 | |
Longitude: -82.100000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-03-28 | Proposed Formations:BEREA THRU CLINTON, Issued Date:3/28/2002, Expired Date:3/28/2003 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-05-06 | RBDMS Rec |
Completed | 2002-05-10 | RBDMS Rec |
Reached Total Depth | 2002-05-10 | RBDMS Rec |
Completion Report Received | 2002-07-24 | RBDMS Rec |
Construction Permit Expires | 2003-03-28 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2002-08-22 | 3422 | 3460 | 22 |
3422 | 3460 | 22 | |
3422 | 3460 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2000 Bbl | 30000 | 500 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | HOPEWELL OIL & GAS DEVELOPMENT | 6625.00 | 0.00 | 184 |
2003 | HOPEWELL OIL & GAS DEVELOPMENT | 13153.00 | 0.00 | 365 |
2004 | HOPEWELL OIL & GAS DEVELOPMENT | 12525.00 | 0.00 | 365 |
2005 | HOPEWELL OIL & GAS DEVELOPMENT | 18178.00 | 0.00 | 365 |
2006 | HOPEWELL OIL & GAS DEVELOPMENT | 13962.00 | 73.00 | 365 |
2007 | HOPEWELL OIL & GAS DEVELOPMENT | 10392.00 | 0.00 | 0 |
2008 | HOPEWELL OIL & GAS DEVELOPMENT | 7850.00 | 0.00 | 365 |
2009 | HOPEWELL OIL & GAS DEVELOPMENT | 9656.00 | 0.00 | 365 |
2010 | HOPEWELL OIL & GAS DEVELOPMENT | 8343.00 | 0.00 | 0 |
2011 | HOPEWELL OIL & GAS DEVELOPMENT | 8224.00 | 0.00 | 0 |
2012 | HOPEWELL OIL & GAS DEVELOPMENT | 6646.00 | 0.00 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | 5632.00 | 0.00 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | 3661.00 | 0.00 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | 3224.00 | 0.00 | 365 |
2016 | HOPEWELL OIL & GAS DEVELOPMENT | 454.00 | 0.00 | 60 |
2017 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
2018 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 184 |
2003 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2004 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2005 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 25 | 365 |
2006 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 25 | 365 |
2007 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | ||
2008 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2009 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2010 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
2011 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | |
2012 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2016 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 60 |
2017 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
2018 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1353546914 | 2018-7-2 0:00:0 | PW | No Violations | 0.60 |
0327654715 | 2004-08-16 | Preliminary Restoration | No Violations | Tank battery is N of well out of sight over the hill |
0343179386 | 2018-07-11 | Production Wells | No Violations | The inspection revealed the well is shut-[1]100--place on the tank. |
0553054263 | 2016-03-03 | Production Wells | No Violations
- | |
1233142790 | 2009-01-26 | Production Wells | No Violations | Producing, no problems noted. |
1353546914 | 2018-07-02 | Production Wells | No Violations | The inspection was conducted under hot, humid and dry conditions. The temperature is 88 degrees Fahrenheit. The inspection is a Compliance Notice Follow-[1]100-barrel steel tank and a vertical separator that is shut in. I called Howard Harrop and Tom Giusti. The Compliance Notice would be resolved if the identification and the 2- inch bull plug were installed on the tank. |
1527174208 | 2018-05-24 | Production Wells | Violations Noted | The inspection is conducted under dry, sunny clear condition with a temperature of 70 degrees Fahrenheit. I met the landowner Mark Blatt where the well is setting. The well is idle but a gas leak has scalded an area 12 foot x 21 foot. The Ventis Pro 4 gas meter was used to check the leak. The meter verified that there was 23- LEL, 21- O2, 0-CO, 0-H2S. The well is equipped with an Allied pumping unit, well head, 4.5 inch casing, tubing head, 1.5 inch tubing, 118 single piston motor. Two out of the 4 valves are open at the well head. The flowline valve is open to the tank site. The tank site consists of [[1]vertical separator,[1] chart meter with no activity and a .375 inch orifice plate. The company needs to fix the gas leak within 24 hours, Install a bull plug with on the tank within 5 days and install identification within 10 days. |
327654715 | 2004-8-16 0:00: | PL | No Violations | |
343179386 | 2018-7-11 0:00: | PW | No Violations | 1.50 |
553054263 | 2016-3-3 0:00:0 | PW | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1527174208 | US-OH-114619 | 2018-05-25 | Well operation causing pollution and contamination | |
1527174208 | US-OH-114620 | 2018-05-25 | Well insufficiently equipped to prevent escape of oil and gas | |
1527174208 | US-OH-114621 | 2018-05-25 | Failure to legibly identify well | |
1527174208 | US-OH-114622 | 2018-05-25 | Failure to have required locks, bull plugs |
For data sources see[9]