X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28710

Well Details

Well ID: 34-119-28710
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Salt Creek Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: HOLSKEY JAMES
License Status: Final Restoration
License Date: 2015-05-15
Spud Date: 2010-07-28
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2010-08-07
Well Total Depth: 6854.00 ft
Configuration: Vertical
Latitude: 39.850000
Longitude: -81.820000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-07-02 Proposed Formations:OHIO SHALE THRU KNOX, Issued Date:7/2/2010, Expired Date:7/1/2012 12:00:00 PM, Drilling unit acres:100, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-08-07
Completion Report Received 2010-10-19
APP 2015-05-15 Proposed Formations:BEEKMANTOWN, Issued Date:5/15/2015, Expired Date:5/14/2017 12:00:00 PM, Drilling unit acres:100, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2015-08-19
Construction Permit Expires 2017-05-14
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-10 6714 6753 35
6714 6753 35
6714 6753 35

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-08-12 ACID 15 11800 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 ARTEX OIL COMPANY 151.00 0.00 365
2011 ARTEX OIL COMPANY 8105.00 0.00 365
2012 ARTEX OIL COMPANY 6052.00 0.00 366
2013 ARTEX OIL COMPANY 4210.00 0.00 365
2014 ARTEX OIL COMPANY 3641.00 0.00 365
2015 ARTEX OIL COMPANY 1876.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 ARTEX OIL COMPANY Brine 2177 365
2011 ARTEX OIL COMPANY Brine 1549 365
2012 ARTEX OIL COMPANY Brine 1268 366
2013 ARTEX OIL COMPANY Brine 855 365
2014 ARTEX OIL COMPANY Brine 600 365
2015 ARTEX OIL COMPANY Brine 665 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1010980078 2015-8-19 0:00: PB No Violations
-1062728966 2010-8-18 0:00: PL No Violations
-1170165215 2010-9-20 0:00: PL No Violations
-1631017688 2010-12-21 0:00 PW No Violations
-463162202 2015-8-17 0:00: PB No Violations 5.00
-899270345 2010-8-4 0:00:0 DD No Violations
0463162202 2015-08-17 Plug / Plug Back No Violations Bishop well services was rigged up over well and ran 2.375tubing down to 6700 and set bottom plug to 6700-6300. Formation Cementing set the cement plug.
0870746611 2010-08-19 Preliminary Restoration No Violations Pit being closed. Cleaning up lease road. Requested that road bars be installed where ever a good avenue presented itself.
0899270345 2010-08-04 Drill / Deepen / Reopen No Violations Drilling ahead at 5890
1010980078 2015-08-19 Plug / Plug Back No Violations I was not at site to witness plug job so Artex would finish plugging. The rig ripped 4.5casing off at 3378. They pulled one joint and set Big Lime plug with Formation Cementing. The plug was set at 3337-3037. Then the rig pulled up to the bottom of the 8.625casing and set plug from 1661-1461. The rig pulled 4.5casing up to 200-0 and set top plug. The 3plugs set today circulated per company. Total 4.5casing pulled was 4250of casing.
1018322470 2010-07-20 Drill / Deepen / Reopen No Violations Location cut.
1062728966 2010-08-18 Preliminary Restoration No Violations Pit is empty. Reclamation of location is in progress. Well is complete but not yet on line.
1159080693 2015-08-18 Plug / Plug Back No Violations Bishop well services had ripped 4.5casing off at 5749 for the 1st rip. Formation Cementing was placing the plug at 5714-5514 as a Utica plug. Then the rig tried to pull the casing and it was hung. Then the rig came up to 5105 and ripped 4.5casing off as the 2nd rip. They pulled up to the Clinton and set a 300 plug. The plug was set at 4512-4212. The rig tried to pull 4.5casing again and it was hung. The job was shutdown.
1170165215 2010-09-20 Preliminary Restoration No Violations Well is producing. No problems noted. Growth in shady areas only so far.
1439928853 2015-08-18 Plug / Plug Back No Violations
1446040742 2010-08-06 Drill / Deepen / Reopen No Violations Ran 161 joints of 4-1/2 10.5# casing set at 6836.45. Schlumberger cemented with 150sx of Rose Run Blend. Plug down at Midnight.
1631017688 2010-12-21 Production Wells No Violations Producing pump jack. No problems noted.
1642329128 2017-01-04 Final Restoration No Violations Final Restoration passed on 1-4-17 by Patrick Shreve. Well was plugged in compliance OAC 1501-9-11. The land was restored back under ORC 1509.072. Weather is cold, windy and clear. The temperature is 31 degrees Fahrenheit and there is no snow on the ground.
1765606097 2010-08-12 Drill / Deepen / Reopen No Violations Well was acidized with 12,500 gallons of acid. Avg Rate 4.1 BPM, Avg. Pressure 2500 psi.
1857688760 2012-08-22 Preliminary Restoration No Violations Preliminary Restoration passed on day of 8-22-12 by Patrick Shreve.
1864593429 2010-08-26 Preliminary Restoration No Violations Location has been restored and seeded and mulched. Well has been completed but is not yet on line.
1999225213 2010-09-08 Preliminary Restoration No Violations Well site has been completely reclaimed, seeded and mulched. Some growth in shady areas. Mulch is thin in some areas. Ditching of flowline has messed up some of the reclamation. The well is producing.
870746611 2010-8-19 0:00: PL No Violations

For data sources see[9]

References