X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28745

Well Details

Well ID: 34-119-28745
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Meigs Township
Operator Name: ARTEX ENERGY GROUP LLC
Well Pad ID: US-OH-000479
Farm/Lease Name: FREC MUSK MEIGS
License Status: Permit Expired
License Date: 2016-08-16
Spud Date: 2012-02-10
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.800000
Longitude: -81.710000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-09-30 Proposed Formations:TRENTON/BLACKRIVER, Issued Date:9/30/2011, Expired Date:9/29/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Change of Owner 2016-07-11 Operator changed from 8798, ANADARKO E & P ONSHORE LLC to 5352, ARTEX OIL COMPANY - INCORRECT WELL #34-119-2-8745--01-00 WAS TRANSFERRED ON 9/10/2014. THIS IS THE CORRECT WELL AND WAS TRANSFERRED ON 7/11/2016 CM.
APP 2016-08-16 Proposed Formations:, Issued Date:8/16/2016, Expired Date:8/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:TI
Construction Permit Expires 2017-08-16 160 FEET OF 20" CONDUCTOR SET AND CEMENTED 2/2012. NOTHING DONE SINCE. STATUS CHANGED TO DRILLING 5/18/16 DRILLED TO APPROXIMATELY 600'. CASING AND MOUSE HOLE HAVE HAD OPEN CASING SPOT WELDED SHUT AND AREA FILLED WITH GRAVEL. NO ACTIVITY HAS OCCURRED SINCE-ALE Inactive status expired-TE
Change of Owner 2019-05-23 Operator changed from 5352, ARTEX OIL COMPANY to 9897, ARTEX ENERGY GROUP LLC
Record Last Modified 2019-05-23 160 FEET OF 20" CONDUCTOR SET AND CEMENTED 2/2012. NOTHING DONE SINCE. STATUS CHANGED TO DRILLING 5/18/16 DRILLED TO APPROXIMATELY 600'. CASING AND MOUSE HOLE HAVE HAD OPEN CASING SPOT WELDED SHUT AND AREA FILLED WITH GRAVEL. NO ACTIVITY HAS OCCURRED SINCE-ALE Inactive status expired-TE

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1013329804 2012-2-10 0:00: DD No Violations 1.50
-1466964972 2013-1-30 0:00: DD No Violations 1.00
-2067163776 2015-11-23 0:00 DD No Violations
-223713578 2016-5-31 0:00: DD No Violations 1.00
-226185910 2019-12-10 0:00 TI No Violations 0.20
-904382322 2016-8-9 0:00:0 DD No Violations 2.00
0223713578 2016-05-31 Drill / Deepen / Reopen No Violations On the day of my inspection Aaron Evilsizor accompanied me on my inspection. The wells are requested for Temporary Inactive Status. I showed Aaron that tops of the casing will be welded with a solid cap. The tin horns were filled up with pea gravel.
0904382322 2016-08-09 Drill / Deepen / Reopen No Violations On the day of inspection the purpose of for Temporary Inactive Status. The haul road that goes West off of Prouty road starts at coordinates of 39.80667,---28745 and 119-28754. The road across the haul road to the south is at coordinates of 39.79985,--
1013329804 2012-02-10 Drill / Deepen / Reopen No Violations On day of inspection Zigenfuss was spuding in.Will set 160of 20conductor.
1052618485 2018-06-19 Drill / Deepen / Reopen No Violations The inspection was conducted under hot, humid and dry conditions. The temperature was 84 degrees Fahrenheit. The inspection is due to Temporary Inactive status follow-up. The 8- foot tin horn was somewhat exposed to the surface and the 20- inch conductor was exposed with a plate and identification welded on the top. The 16- inch mouse hole has a welded-on plate on the top of the casing. There is a fence enclosing the equipment with an identification attached to the fence.
1347392476 2012-09-11 Drill / Deepen / Reopen No Violations Tin horn is in place and conductor pipe is in place with plate welded to it. No rig at this time.
1466964972 2013-01-30 Drill / Deepen / Reopen No Violations I accompanied Pat Shreve on the inspection of this well. The tin horn was in place but no rig on site.
1826788859 2012-02-14 Drill / Deepen / Reopen No Violations On day of inspection equipment was being moved to the next site.Ziggenfuss drilled to 520 with 19bit.Large rig will come in to finish well.
1903550657 2013-01-30 Drill / Deepen / Reopen No Violations Well is not drilled. Waiting on drill rig. Conductor and tin horn are in place.
2067163776 2015-11-23 Drill / Deepen / Reopen No Violations An inspection of this location revealed tin horn and conductor have been installed. Nothing has been done since. No activity or equipment on location during inspection. Time of inspection: 9:25 AM.
2146203112 2013-07-10 Drill / Deepen / Reopen No Violations Brad Sellers and I looked at the pad where the top hole was set but no surface pipe has been ran. Company has casings wleded and plated over but they set with well spudded.
265307145 2019-12-10 0:00 PW No Violations 0.20

For data sources see[3]

References