If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28749 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82,"lon":-81.75,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Meigs Township | |
Operator Name: ANADARKO E & P ONSHORE LLC | |
Well Pad ID: US-OH-000488 | |
Farm/Lease Name: FREC MEIGS | |
License Status: Plugged Back | |
License Date: 2012-03-23 | |
Spud Date: 2012-03-27 | |
Spud Drilling Contractor: KEY ENERGY | |
Final Drill Date: 2012-04-08 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.820000 | |
Longitude: -81.750000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-12-29 | Proposed Formations:TRENTON/BLACKRIVER, Issued Date:12/29/2011, Expired Date:12/28/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2012-03-23 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/23/2012, Expired Date:3/23/2014 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class: |
Plugged Back | 2012-04-07 | UPDATED SLANT FROM DIRECTIONAL TO VERTICAL, THIS WAS A STRAT WELL, ORIGINALLY HAD DIRECTIONAL WITH A TARGET HOLE, SEE 34-119-28749-01 FOR LATERAL COORDINATES-ALE 12/21/17. |
Reached Total Depth | 2012-04-08 | UPDATED SLANT FROM DIRECTIONAL TO VERTICAL, THIS WAS A STRAT WELL, ORIGINALLY HAD DIRECTIONAL WITH A TARGET HOLE, SEE 34-119-28749-01 FOR LATERAL COORDINATES-ALE 12/21/17. |
Correction to Well | 2012-05-18 | CORRECTION TO WELL NUMBER. |
Completion Report Received | 2012-10-01 | UPDATED SLANT FROM DIRECTIONAL TO VERTICAL, THIS WAS A STRAT WELL, ORIGINALLY HAD DIRECTIONAL WITH A TARGET HOLE, SEE 34-119-28749-01 FOR LATERAL COORDINATES-ALE 12/21/17. |
Construction Permit Expires | 2014-03-23 | UPDATED SLANT FROM DIRECTIONAL TO VERTICAL, THIS WAS A STRAT WELL, ORIGINALLY HAD DIRECTIONAL WITH A TARGET HOLE, SEE 34-119-28749-01 FOR LATERAL COORDINATES-ALE 12/21/17. |
Record Last Modified | 2017-12-21 | UPDATED SLANT FROM DIRECTIONAL TO VERTICAL, THIS WAS A STRAT WELL, ORIGINALLY HAD DIRECTIONAL WITH A TARGET HOLE, SEE 34-119-28749-01 FOR LATERAL COORDINATES-ALE 12/21/17. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-10-24 | 9727 | 9510 | 40 |
2012-10-24 | 11887 | 11670 | 40 |
2012-10-24 | 11647 | 11430 | 40 |
2012-10-24 | 12369 | 12157 | 40 |
2012-10-24 | 12064 | 11920 | 40 |
2012-10-24 | 11407 | 11190 | 40 |
2012-10-24 | 10687 | 10470 | 40 |
2012-10-24 | 10447 | 10230 | 40 |
2012-10-24 | 11167 | 10950 | 40 |
2012-10-24 | 10927 | 10710 | 40 |
2012-10-24 | 9487 | 9270 | 40 |
8287 | 8070 | 40 | |
12064 | 11920 | 40 | |
11887 | 11670 | 40 | |
11647 | 11430 | 40 | |
11407 | 11190 | 40 | |
11167 | 10950 | 40 | |
10927 | 10710 | 40 | |
10687 | 10470 | 40 | |
10447 | 10230 | 40 | |
10207 | 9990 | 40 | |
9967 | 9750 | 40 | |
9727 | 9510 | 40 | |
9487 | 9270 | 40 | |
9247 | 9030 | 40 | |
9007 | 8790 | 40 | |
8767 | 8550 | 40 | |
8527 | 8310 | 40 | |
12369 | 12157 | 40 | |
8287 | 8070 | 40 | |
2012-10-24 | 10207 | 9990 | 40 |
2012-10-24 | 9967 | 9750 | 40 |
2012-10-24 | 9247 | 9030 | 40 |
2012-10-24 | 8527 | 8310 | 40 |
2012-10-24 | 8287 | 8070 | 40 |
2012-10-24 | 9007 | 8790 | 40 |
2012-10-24 | 8767 | 8550 | 40 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/01/2012 | 06/01/2012 | 6800.00 | 10,170,200.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Proppant | Methenamine | 100-97-0 | 1.00 | 0.08 | ||
Quartz | 14808-60-7 | 70.00 | 5.95 | |||||
AI-7NR | Trican Well Service | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 1.00 | 0.00001000 | ||
WG-111D | Trican Well Service | Water Gellant | Guar gum | 9000-30-0 | 100.00 | 0.00222000 | ||
FEAC-20 | Trican Well Service | Iron Control | Acetic acid | 64-19-7 | 50.00 | 0.00156000 | ||
Citric acid | 77-92-9 | 30.00 | 0.00094000 | |||||
TXP-10 | Trican Well Service | Scale Inhibitor | Acrylate phosphonate copolymer | 40.00 | 0.01 | |||
1,2-Propylene glycol | 57-55-6 | 10.00 | 0.00256000 | |||||
Neutralized organic acid | 20.00 | 0.00513000 | ||||||
Water | 7732-18-5 | 70.00 | 0.01 | |||||
Sand (Proppant) | Trican Well Service | Proppant | ||||||
WXB-10 | Trican Well Service | Fracturing Crosslinker | Ulexite | 1319-33-1 | 60.00 | 0.00 | ||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 60.00 | 0.00 | |||||
WBE-6 | Trican Well Service | Gel Breaker | No hazardous ingredients | 100.00 | 0.00 | |||
DF-1 | Trican Well Service | Defoaming Agent | Non-hazardous materials only in the product | 100.00 | 0.00 | |||
CS-1 | Trican Well Service | Clay Stabilizer | Inorganic salts | 30.00 | 0.06 | |||
Blend | 25.00 | 0.05 | ||||||
1,2-Propylene glycol | 57-55-6 | 20.00 | 0.04 | |||||
Surfactant | 5.00 | 0.01 | ||||||
WBO-2 | Trican Well Service | Gel Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00061000 | ||
Water | Anadarko | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 90.76 | ||
Acid, Hydrochloric (15) | Trican Well Service | General Acidizing | ||||||
TXP-8 | Trican Well Service | Friction Reducer | Cationic water-soluble polymer emulsion | 100.00 | 0.08 | |||
GBO-1 | Trican Well Service | Gel Breaker | Sodium perborate tetrahydrate | 10486-00-7 | 100.00 | 0.00 | ||
Spectrachem tracer | Diagnostics | |||||||
Acid, Hydrochloric (7.5) | General Acidizing | |||||||
Acid, Hydrochloric (7.5) | Trican Well Service | General Acidizing | Water | 7732-18-5 | 92.50 | 0.31 | ||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.02 | |||||
BioClear 5000 | Trican Well Service | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 10.00 | 0.00535000 | ||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.03 | |||||
Acid, Hydrochloric (15) | General Acidizing | Hydrochloric acid | 7647-01-0 | 15.00 | 0.00 | |||
Water | 7732-18-5 | 85.00 | 0.00 | |||||
BXL-A | Trican Well Service | Gel Breaker | Proprietary | 70.00 | 0.00 | |||
Spectrachem tracer | ProTechnics | Diagnostics | Sodium Salt | 10.00 | 0.00006000 | |||
Water | 7732-18-5 | 90.00 | 0.00058000 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ANADARKO E & P ONSHORE LLC | Brine | 12787 | 121 |
2013 | ANADARKO E & P ONSHORE LLC | Brine | 1031 | 154 |
2014 | ARTEX OIL COMPANY | Brine | 1273 | 364 |
2015 | ARTEX OIL COMPANY | Brine | 3119 | 365 |
2016 | ARTEX OIL COMPANY | Brine | 1950 | 366 |
2017 | ARTEX OIL COMPANY | Brine | 1450 | 365 |
2018 | ARTEX OIL COMPANY | Brine | 1425 | 365 |
2019 | ARTEX OIL COMPANY | Brine | 300 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1034969234 | 2012-10-9 0:00: | CT | No Violations | 1.00 |
-1087161208 | 2019-12-10 0:00 | PW | No Violations | 0.30 |
-1172395589 | 2013-5-2 0:00:0 | PW | No Violations | 1.50 |
-1252252928 | 2012-11-8 0:00: | CT | No Violations | 2.00 |
-1575787965 | 2012-9-12 0:00: | AM | No Violations | |
-178092893 | 2013-8-7 0:00:0 | PL | No Violations | 1.00 |
-2089415231 | 2012-10-9 0:00: | CT | No Violations | 1.00 |
-2127039464 | 2012-2-17 0:00: | DD | No Violations | 2.00 |
-486662796 | 2012-4-27 0:00: | DD | No Violations | 2.00 |
-535935049 | 2013-5-29 0:00: | PW | No Violations | 1.00 |
-583561022 | 2012-4-27 0:00: | DD | No Violations | 5.00 |
-639013399 | 2012-11-8 0:00: | PW | No Violations | |
-662670289 | 2012-6-6 0:00:0 | CT | No Violations | 3.00 |
-759204864 | 2012-4-13 0:00: | DD | No Violations | 3.00 |
-763021214 | 2013-2-5 0:00:0 | AD | No Violations | |
0178092893 | 2013-08-07 | Preliminary Restoration | No Violations | Preliminary Restoration passed on day of 8-7-13 on the inspection by Patrick Shreve. |
0232743937 | 2012-04-19 | Drill / Deepen / Reopen | No Violations | On day of inspection Key rig #9 is drilling at rate of 7per hour. The depth is at 11,000ft. |
0371416617 | 2012-08-22 | Completion Testing | No Violations | Service rig is swabbing well. The well is slowly starting to kick off. |
0486662796 | 2012-04-27 | Drill / Deepen / Reopen | No Violations | On day of inspection rig is trying to get 5.5 casing in the well. The rig had to run 400to Total depth of 12871.Will wait on phone call. |
0535935049 | 2013-05-29 | Production Wells | No Violations | I inspected site and Mclaughlin was in installing tanks and production equipment on the well pad. I will look at later to complete a preliminary restoration. |
0583561022 | 2012-04-27 | Drill / Deepen / Reopen | No Violations | Halliburton is on site to cement 12,450of 5.5casing in place. Rig could not get pipe down. The rig could not get pipe all the way to total depth. |
0639013399 | 2012-11-08 | Production Wells | No Violations | On site with training group from Central Office conducting inspection of producing Utica Shale well site, well is equipped with tubing and rods and pumping unit and currently producing into three 500 bbl frac tanks. |
0662670289 | 2012-06-06 | Completion Testing | No Violations | Trican was fracing well and was in between stages 12 and 13.Braek down pressure was 6755psi and7057psi.Between 90 and 94 barrel per minute was average rate. |
0759204864 | 2012-04-13 | Drill / Deepen / Reopen | No Violations | On day of inspection pipe was tripped out and new down hole drill motor and drill bit being installed. |
0763021214 | 2013-02-05 | Annular Disposal | No Violations | I accompanied Pat Shreve on the inspection of this well. |
1034969234 | 2012-10-09 | Completion Testing | No Violations | Jake Glasscock and I stopped in to look at well . Express Energy services are looking after well now. They stated that the well is making good oil. They are burning 2 flares. The well with pumping unit engaged will want kick off. |
1078565079 | 2013-01-30 | Production Wells | No Violations | Well is completed and ready to go in line. Waiting on tanks to be installed and production equipment. Well is equipped with a 660 pumping unit. Gates have been installed. |
1172395589 | 2013-05-02 | Production Wells | No Violations | On day of inspection Rick Trippel, Mallory Stanton, Teresa McQuade and I stopped in to look at well. Company is waiting on ROC Service company to come in and hook up tanks and facility. |
1252252928 | 2012-11-08 | Completion Testing | No Violations | On day of inspection the tour of the Columbus staff was purpose of being on site. Brad Millikan and Matt Carmichael and Steve Dimon met with the group and answered any questions. Well is being flowed back and developed. |
1337095417 | 2012-05-15 | Completion Testing | No Violations | On day of inspection the Christmas tree is in place and testing equipment is in place getting reading for frac job. |
1339860964 | 2012-06-11 | Completion Testing | No Violations | Coiled tubing unit is drilling out plugs after the frac job. |
1347971962 | 2012-09-18 | Completion Testing | No Violations | Well is being tested. Upon flare of well and flowing back into 500 barrel tank the tank started to expand. The material was contained and disposed of. The company is testing and find out the cause of the tank expanding. There were pressure relief hatches on the tank. There could have been a chemical reaction. The tank was used for emulsion purposes. |
1358451298 | 2013-01-17 | Completion Testing | No Violations | On day of inspection flow back is completed and company is moving equipment off of drill pad. Well will need electric hooked up. Company will have to install production system at production pad. |
1575787965 | 2012-09-12 | Administrative Inspection | No Violations | Bob Pitt with Anadarko called and they would be flaring well in the evening of 9-12-12. Local 911 was called and advised of the flare. |
1805808688 | 2012-08-08 | Completion Testing | No Violations | Company is getting ready to flow back well. The equipment will be coming in soon. |
1863797987 | 2013-07-10 | Completion Testing | No Violations | Brad Sellers and I went to the well site and looked at the production equipment. The Well is still shut in and the gas line has not been hooked up the salesline. There are men still working on the unit. I will check back at a later date for the preliminary. |
2004520298 | 2012-09-11 | Completion Testing | No Violations | Well is equipped with a 640 artificial lift unit. Edge is waiting on electric motor for unit. Edge is flow back group that will be performing flow back operations on well. |
2046561174 | 2019-12-10 0:00 | PW | No Violations | 0.20 |
2089415231 | 2012-10-09 | Completion Testing | No Violations | I accompanied Pat Shreve on a field inspection where we found the well to be flaring and well not pumping. The company man stated they were waiting on the electrician to show and stated the well was making good amounts of oil. |
2127039464 | 2012-02-17 | Drill / Deepen / Reopen | No Violations | On day of inspection Ziggenfuss is drilling at depth of 220in 19open hole.Company set 140of conductor that was 20pipe.Spudded on 2-16-12. |
232743937 | 2012-4-19 0:00: | DD | No Violations | 2.50 |
371416617 | 2012-8-22 0:00: | CT | No Violations | 1.00 |
For data sources see[7]