If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-119-28773 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.09,"lon":-82.18,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Licking Township | |
| Operator Name: DERRICK PETROLEUM INC | |
| Well Pad ID: | |
| Farm/Lease Name: HILLBILLY PARK MARSH | |
| License Status: Producing | |
| License Date: 2012-10-29 | |
| Spud Date: 2013-08-01 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2013-08-07 | |
| Well Total Depth: 3020.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.090000 | |
| Longitude: -82.180000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-10-29 | Proposed Formations:CLINTON, Issued Date:10/29/2012, Expired Date:10/29/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2013-08-07 | |
| Completion Report Received | 2014-01-06 | |
| Construction Permit Expires | 2014-10-29 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2013-10-21 | H2O | 0 | 46287 Lbs | 100000 | Universal Well Services Inc. | Frac was good. Had trouble getting sand out of transport. |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | DERRICK PETROLEUM INC | 0.00 | 464.00 | 67 |
| 2014 | DERRICK PETROLEUM INC | 0.00 | 1295.00 | 365 |
| 2015 | DERRICK PETROLEUM INC | 0.00 | 725.00 | 365 |
| 2016 | DERRICK PETROLEUM INC | 0.00 | 749.00 | 365 |
| 2017 | DERRICK PETROLEUM INC | 0.00 | 670.00 | 365 |
| 2018 | DERRICK PETROLEUM INC | 0.00 | 584.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | DERRICK PETROLEUM INC | Brine | 997 | 67 |
| 2014 | DERRICK PETROLEUM INC | Brine | 181 | 365 |
| 2015 | DERRICK PETROLEUM INC | Brine | 289 | 365 |
| 2016 | DERRICK PETROLEUM INC | Brine | 110 | 365 |
| 2017 | DERRICK PETROLEUM INC | Brine | 88 | 365 |
| 2018 | DERRICK PETROLEUM INC | Brine | 108 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1949870922 | 2013-8-6 0:00:0 | DD | No Violations | 1.50 |
| -1952518078 | 2014-10-15 0:00 | PL | No Violations | 1.00 |
| 0171680322 | 2016-11-07 | Production Wells | No Violations
-100 barrel steel tank batteries that is enclosed within an impoundment. | |
| 1011292341 | 2013-10-21 | Completion Testing | No Violations | Derrick Petroleum was fracing well and Universal well services was performing job. A total of 46,287 gallons of water were used and 100 sacks of 20-40 sand were used. Break down pressure was at 921psi. |
| 1165269457 | 2013-08-03 | Drill / Deepen / Reopen | No Violations | Pressure tested casing to 300psi and the pressure dropped back 30 psi in 30 minutes. Bled air off and the pressure tested again for 20 minutes and held at 300 psi. |
| 1375761168 | 2013-08-02 | Casing String Witnessed | No Violations | Killbarger rig 4 has ran 428of 8.625casing at 24lb/ft in an 12.25 open hole to a depth of 451. The hole was drilled on fluid at a 50 viscosity. There were no cement basket or float shoe installed. There were two centrilzers ran at bottom and middle. Formation cementing ran 150 %excess and had 2 barrels of slurry returns. |
| 171680322 | 2016-11-7 0:00: | PW | No Violations | 0.50 |
| 1949870922 | 2013-08-06 | Drill / Deepen / Reopen | No Violations | Rig is drilling into pay with 2.375tubing, Collars and tricone bit. They are on plug drilling which is turning. They pumped some cement when setting longstring behind the plug so the drill rig can drill up easier. At depth of 2932. |
| 1952518078 | 2014-10-15 | Preliminary Restoration | No Violations | Preliminary Restoration passed by Patrick Shreve on 10-15-14. |
For data sources see[8]