34-119-28793

Well Details

Well ID: 34-119-28793
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Springfield Township
Operator Name: SMITH RONALD DBA CHIPCO
Well Pad ID:
Farm/Lease Name: WILSON BROS FARM
License Status: Producing
License Date: 2014-10-01
Spud Date: 2014-10-07
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.920000
Longitude: -82.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-10-01 Proposed Formations:CLINTON, Issued Date:10/1/2014, Expired Date:9/30/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Construction Permit Expires 2016-09-30
Record Last Modified 2019-06-11

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 SMITH RONALD DBA CHIPCO 743.00 115.00 365
2017 SMITH RONALD DBA CHIPCO 541.00 137.00 365
2018 SMITH RONALD DBA CHIPCO 461.00 20.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 SMITH RONALD DBA CHIPCO Brine 0 365
2017 SMITH RONALD DBA CHIPCO Brine 0 365
2018 SMITH RONALD DBA CHIPCO Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1995033942 2016-1-26 0:00: PL No Violations 2.00
-364489724 2014-10-8 0:00: DD No Violations 4.00
-487873565 2016-1-26 0:00: AM No Violations
0364489724 2014-10-08 Drill / Deepen / Reopen No Violations I stopped by to perform Blow out Preventer test. There was 500 psi put on the annular preventer. Then the rig pressured up the casing to 280 psi. Then the pressure was held for 25 minutes. The pressure lost was at 252 psi. Test passed.
0487873565 2016-01-26 Administrative Inspection No Violations 119-28793 well owned by Chipco that I had some questions about erosion issues. Chip Smith stated that they had some issues and was working on running electric to the compressor. That is how the dike gotten tore up. He stated that he will be moving equipment in to fix as soon as the weather dries up the location.
0518133857 2015-01-21 Production Wells No Violations Well is a new Clinton well equipped with a pumping unit that is producing the well through the production manifold. There are 2- 100 barrel steel tanks that have a dike around them. The identification will placed at later date. I will check back after site has been vegetated back.
1412777830 2014-10-08 Casing String Witnessed No Violations Poulson drilling drilled an 11open hole of 480 on fluid. They set 438 of 20lb/ft of 8.625casing. Petroset Cementing set a Gel preflush of 10 barrel with hulls. Then ran 180 sacks of Class A cement at 3 %CaCl. There was good circulation with 10 barrels of slurry returns. 2- 8.625 centrilizers were ran at joints 1,2 and 11,12.
1413050835 2014-10-11 Casing String Witnessed No Violations Poulson drilling dilled an 7.875open hole to 3462 and ran 10.5lb/ft casing with a float shoe and latch down plug and baffle to depth of 3455. There were 4 -4.5x 7.875 centrilizers ran at the bottom. Petro set ran 150 sacks of regular class Aa cement@2%gel. There was no circulation but fluid level was at 850. Bottom of Big Injun is at 375. The Berea was at 864-874. The top of the Big Lime is at 2238.
1668779259 2017-07-31 Preliminary Restoration No Violations Preliminary Restoration passed per 1509.072 by Patrick Shreve on 7-31-17. There is vegetation established to prevent erosion issues. Chipco will bring dozer out and straighten up the road going down into the well. Road was fixed but someone tore the road up with a Four-Wheeler. The road is accessable with my vehicle. This resolves the Compliance Notice Number -1995033942.
1995033942 2016-01-26 Preliminary Restoration Violations Noted 119-28793 well owned by Chipco has restoration issues. I called Chipco with a verbal Compliance Notice. There are erosion issues on the south side of the dike. There are erosion issues north of the dike below the drains for rain water. There are erosion issues down along the road going to the well. There is vegetation that needs to be established on the road going to pumping unit. I performed a Preliminary Restoration that did not pass. I will call the company.
518133857 2015-1-21 0:00: PW No Violations 1.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1995033942 US-OH-120247 2017-08-25 NONE5 Failure to restore within six months