X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28799

Well Details

Well ID: 34-119-28799
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Licking Township
Operator Name: KING PETROLEUM 2
Well Pad ID:
Farm/Lease Name: BURRIER
License Status: Producing
License Date: 2014-11-18
Spud Date: 2015-05-11
Spud Drilling Contractor: H & D DRILLING
Final Drill Date: 2015-08-20
Well Total Depth: 3277.00 ft
Configuration: Vertical
Latitude: 40.070000
Longitude: -82.170000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-18 Proposed Formations:CLINTON, Issued Date:11/18/2014, Expired Date:11/17/2016 12:00:00 PM, Drilling unit acres:174.4, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-08-20
Completion Report Received 2016-03-22
Construction Permit Expires 2016-11-17
Record Last Modified 2017-10-23

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-08-13 H2O 15 54700 Gal 30000 Producers Service Corporation

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 KING PETROLEUM 2 0.00 487.00 120
2016 KING PETROLEUM 2 0.00 912.00 256
2017 KING PETROLEUM 2 0.00 611.00 256
2018 KING PETROLEUM 2 0.00 437.00 156

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 KING PETROLEUM 2 Brine 160 120
2016 KING PETROLEUM 2 Brine 0 256
2017 KING PETROLEUM 2 Brine 0 256
2018 KING PETROLEUM 2 Brine 0 156

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-195203508 2016-11-7 0:00: PL No Violations 0.50
-2041692137 2015-6-25 0:00: DD No Violations 2.50
0125446487 2016-11-07 Production Wells No Violations

-210 and 1-100 barrel steel tank batteries. There is a 77 barrel horizontal tank for brine water and a vertical separator that is enclosed within an impoundment.

0195203508 2016-11-07 Preliminary Restoration No Violations Preliminary Restoration passed per 1509.072 by Patrick Shreve on 11-7-16. Good vegetation is established and no erosion issues.
125446487 2016-11-7 0:00: PW No Violations 0.50
1434465638 2015-06-15 Drill / Deepen / Reopen No Violations Rig spudded well on 5-11-15. H &D Drilling drove 10.75casing to 56. They were currently drilling a 8open hole at 155.
1435591837 2015-06-29 Drill / Deepen / Reopen No Violations During the time of my inspection H & D drilling was on location, not operating at the time. H & D Drilling informed me that they reached total depth on Saturday 6/27/15. The total depth was 3214 feet. The casing was new at a size of 4.5 inches and 10.5 weight.
1435843284 2015-07-02 Drill / Deepen / Reopen No Violations I spoke with H&D Drilling to verify if they were going to be moving to another location. They are not going to be moving to next location yet, still waiting on permit number.
1438014402 2015-06-19 Casing String Witnessed No Violations H&D Drilling had drilled a 10open hole at 545 deep. They then placed 717lb/ft pipe at depth 541. They ran 1-7cement nose guide shoe, 2-7centrilizers and 1-7rubber wiper plug. Cemenco is performing the cementing job with 15 barrel gel preflush and 160 sacks of regular class A cement. There was good circulation and landed the plug with 200 psi lift pressure. Then bumped pressure up to 700 psi and released after 15 minutes.
2041692137 2015-06-25 Drill / Deepen / Reopen No Violations On the day of my inspection H & D Drilling was drilling ahead with a 6.25 inch diameter bit at 2500 feet with a planned td of 3250 feet. A 210bbl tank and a 100bbl tank had set by King Petroleum with SPCC dike 75% complete.

For data sources see[8]

References