If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28806 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.09,"lon":-82.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Licking Township | |
Operator Name: DERRICK PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: HILLBILLY MARSH FARM | |
License Status: Producing | |
License Date: 2015-05-05 | |
Spud Date: 2015-07-09 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 2015-07-29 | |
Well Total Depth: 2995.00 ft | |
Configuration: Vertical | |
Latitude: 40.090000 | |
Longitude: -82.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-05-05 | Proposed Formations:CLINTON, Issued Date:5/5/2015, Expired Date:5/4/2017 12:00:00 PM, Drilling unit acres:241.79, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-07-29 | |
Completion Report Received | 2016-01-06 | |
Construction Permit Expires | 2017-05-04 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-08-31 | H2O | 0 | 1047 Gal | 10000 | Reliance Well Service |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | DERRICK PETROLEUM INC | 0.00 | 725.00 | 288 |
2016 | DERRICK PETROLEUM INC | 0.00 | 749.00 | 365 |
2017 | DERRICK PETROLEUM INC | 0.00 | 670.00 | 365 |
2018 | DERRICK PETROLEUM INC | 0.00 | 584.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | DERRICK PETROLEUM INC | Brine | 289 | 288 |
2016 | DERRICK PETROLEUM INC | Brine | 110 | 365 |
2017 | DERRICK PETROLEUM INC | Brine | 88 | 365 |
2018 | DERRICK PETROLEUM INC | Brine | 108 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1912705765 | 2015-7-15 0:00: | CS | No Violations | 3.00 |
-1954582592 | 2015-7-24 0:00: | CS | No Violations | 4.00 |
1146140259 | 2016-11-03 | Preliminary Restoration | No Violations
-100 barrel steel tank batteries. There is 1---7-16. The Preliminary Inspection did not pass on day of inspection by Patrick Shreve. | |
1436773734 | 2015-07-09 | Drill / Deepen / Reopen | No Violations | H &D Drilling spudded well on this day. Driving 10.75casing , Dugan is constructing the earthen pit and placing the liner. |
1912705765 | 2015-07-15 | Casing String Witnessed | No Violations | H&D Drilling drilled a 10open hole 381. They ran 217of 10.75drive pipe. They ran 375of 17lb/ftof 7casing. They ran 1-7cement nose guide shoe and 3-7centrilizers. Formation Cementing performed the cementing job. They broke circulation and then ran 20 barrels of gel preflush. They then ran 116 sacks of regular class A cement @1%gel and 2%CaCl. Good circulation with 6 barrel of slurry returns and the pressure was bumped up to 650 psi and held for 5 minutes with no loss. Then released back to lift pressure. |
1954582592 | 2015-07-24 | Casing String Witnessed | No Violations | H&D Drilling had drilled a 2925 open hole of 6.25. They ran 10.5lb/ft. of 4.5casing to a depth of 2920. There was 5-4.5centrilizers, 1-4.5float shoe ball valve style, 1-4.5top rubber wiper plug. Formation Cementing was performing the cement job. They broke circulation and ran a 15 barrel gel spacer. They then ran a water spacer and then 100 sacks of cement at 1%gel and 1%Cacl. Good circulation was established. |
For data sources see[8]