X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-21437

Well Details

Well ID: 34-121-21437
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Sharon Township
Operator Name: EASTLAND ENERGY GROUP INC
Well Pad ID:
Farm/Lease Name: LAWRENCE
License Status: Producing
License Date: 2005-04-13
Spud Date: 1970-09-29
Spud Drilling Contractor: J & B DRILLING
Final Drill Date: 1970-10-12
Well Total Depth: 5720.00 ft
Configuration: Vertical
Latitude: 39.680000
Longitude: -81.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1970-08-28 3715 EASTLAND ENERGY GROUP INC GeoDate 8/28/70
Original Spud 1970-09-29
Completed 1970-10-12
Reached Total Depth 1970-10-12
CO 1985-07-22 3715 EASTLAND ENERGY GROUP INC GeoDate 7/22/85
Unknown 1985-07-22 Issued Date 7/22/85 Expired Date 7/22/86 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date
CO 1990-08-08 3715 EASTLAND ENERGY GROUP INC GeoDate 8/8/90
Oil and Gas 1990-08-08 Issued Date 8/8/90 Expired Date 8/8/91 Acres 0083680 Tool Type NT Proposed Formation ORISKANY Proposed Depth 00000 Proposed Drill Depth 00000
APP 1999-11-29 Proposed Formations:CLINTON, Issued Date:11/29/99, Expired Date:11/28/2000 6:00:00 AM, Drilling unit acres:83.68, Proposed Well Type:OG, Proposed Well Class:
APP 2004-07-19 Proposed Formations:GANTZ,FIFTH SAND,30 FOOT, GORDON, Issued Date:7/19/2004, Expired Date:7/19/2005 6:00:00 AM, Drilling unit acres:83.68, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2005-04-13 Proposed Formations:CLINTON, Issued Date:4/13/2005, Expired Date:4/13/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged Back 2005-05-09
Completion Report Received 2005-09-15
Construction Permit Expires 2006-04-13
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2005-11-09 1776 1812 11
2005-11-09 1656 1678 18
1656 1678 18
1776 1812 11
1850 1886 10
1998 2062 20
5568 5618 20
1656 1678 18
2005-11-09 1850 1886 10
2005-04-12 5568 5618 20
2005-11-09 1998 2062 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 20 2100 Bbl 0 1500 GALLONS HCL ACID…3 STAGE FRAC
H2O 0 1426 Bbl 20000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2005 EASTLAND ENERGY GROUP INC 1286.00 0.00 149
2006 EASTLAND ENERGY GROUP INC 809.00 0.00 215
2007 EASTLAND ENERGY GROUP INC 319.00 52.00 300
2008 EASTLAND ENERGY GROUP INC 90.00 0.00 200
2009 EASTLAND ENERGY GROUP INC 0.00 27.00 61
2010 EASTLAND ENERGY GROUP INC 0.00 27.00 267
2011 EASTLAND ENERGY GROUP INC 105.00 5.00 253
2012 EASTLAND ENERGY GROUP INC 29.00 33.00 184
2013 EASTLAND ENERGY GROUP INC 0.00 37.00 100
2014 EASTLAND ENERGY GROUP INC 51.00 41.00 112
2015 EASTLAND ENERGY GROUP INC 0.00 25.00 112
2016 EASTLAND ENERGY GROUP INC 0.00 25.00 120
2017 EASTLAND ENERGY GROUP INC 0.00 14.00 120
2018 EASTLAND ENERGY GROUP INC 27.00 0.00 120

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2005 EASTLAND ENERGY GROUP INC Brine 0 149
2006 EASTLAND ENERGY GROUP INC Brine 0 215
2007 EASTLAND ENERGY GROUP INC Brine 0 300
2008 EASTLAND ENERGY GROUP INC Brine 0 200
2009 EASTLAND ENERGY GROUP INC Brine 37 61
2010 EASTLAND ENERGY GROUP INC Brine 0 267
2011 EASTLAND ENERGY GROUP INC Brine 0 253
2012 EASTLAND ENERGY GROUP INC Brine 0 184
2013 EASTLAND ENERGY GROUP INC Brine 0 100
2014 EASTLAND ENERGY GROUP INC Brine 65 112
2015 EASTLAND ENERGY GROUP INC Brine 40 112
2016 EASTLAND ENERGY GROUP INC Brine 40 120
2017 EASTLAND ENERGY GROUP INC Brine 40 120
2018 EASTLAND ENERGY GROUP INC Brine 40 120

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0481291061 2013-07-02 Production Wells No Violations My inspection today finds the well is equipped with 4.5 casing and 1.5 tubing with a plunger lift system. The production valves are closed but it appears that operator is preparing put the well on pump. The tank battery consists of two 100 bbl tanks, a separator, and a meter. The identification is proper.
0564758604 2006-01-24 Production Wells No Violations Well has been plugged back resolving previous NOV/ChiefsOrders,well is equipped with pumping unit and 2-100 bbl tanks ith dike in place.
1044400520 2003-02-04 Production Wells No Violations Upon inspecting well site found well to be incapable of production,no I.D. at well head,all production equiptment removed.
1099849199 2004-11-04 Production Wells No Violations Upon inspecting wellsite as to supervisors request found no change in status of well,still idle noI.D. posted called and discussed well with company rep Mike Beliye he stated he was waiting on service rig to plug-back well job is to be preformed by Timco Services called and discussed job with Tim Brown and he stated rig should be on well second week in December.
1111605344 2005-03-22 Administrative Inspection No Violations Spoke with Mark Belaj re: he stated he has decided to plug this well as soon as possible;he has selected Tim Brown, Timco to do the plugging; he states there is an obstruction at 2500-2700 and nedded to know what we wanted. I advised Mark we would desired to reach total depth (5700), that he may expect to mill on the tubing and packer until we reach bottom. We would only cut short after we had exhausted every method of opening the hole. I also advised that most decisions would be made by the inspector, on the site depending on the effort/methods being used. He also advised he would be asking for a stay of the BFO
1115724241 2005-05-09 Plug / Plug Back No Violations Well plugged back to 2400 operator ran 2100 of 4.5 casing into well and cemented with130 sk. Cement.Resolving prior NOV,Chiefs Order,Consent Agreement.
1344979084 2012-06-25 Production Wells No Violations Inspection of the well head found the following equipment , 4.5 production casing & 1.5 tubing with the production valves open and the well being produced by the means of a plunger lift system . 2 - 100 barrel tanks and a separator are present in an established dike with proper well identification present .
481291061 2013-7-2 0:00:0 PW No Violations 1.00
564758604 2006-1-24 0:00: PW No Violations

For data sources see[9]

References