If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-21574 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.85,"lon":-81.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Buffalo Township | |
Operator Name: FLAME ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: SANFORD ELEANOR | |
License Status: Final Restoration | |
License Date: 1994-04-25 | |
Spud Date: 1973-02-21 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1973-03-01 | |
Well Total Depth: 5545.00 ft | |
Configuration: Vertical | |
Latitude: 39.850000 | |
Longitude: -81.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1972-10-13 | 2948 CRUM ROBERT L GeoDate 10/13/72 |
Original Spud | 1973-02-21 | I.P. GAS EST. PF=SCL |
Completed | 1973-03-01 | I.P. GAS EST. PF=SCL |
Reached Total Depth | 1973-03-01 | I.P. GAS EST. PF=SCL |
Completion Report Received | 1973-07-23 | I.P. GAS EST. PF=SCL |
CO | 1994-04-11 | 3062 FLAME ENERGY CO INC GeoDate 10/13/72 |
CO | 1994-04-25 | 3062 FLAME ENERGY CO INC GeoDate 4/25/94 |
GAS WELL | 1994-04-25 | Issued Date 4/25/94 Expired Date 4/25/95 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 5/9/94 |
Plugged/Abandoned | 1994-05-09 | I.P. GAS EST. PF=SCL |
Construction Permit Expires | 1995-04-25 | I.P. GAS EST. PF=SCL |
Record Last Modified | 2017-02-15 | I.P. GAS EST. PF=SCL |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5366 | 5391 | 0 |
2006-09-11 | 5404 | 5420 | 0 |
5366 | 5391 | 0 | |
5366 | 5391 | 0 | |
2006-09-11 | 5428 | 5429 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 925 Bbl | 30500 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | REDCO INC | 0.00 | 0.00 | 365 |
1986 | REDCO INC | 0.00 | 0.00 | 365 |
1987 | REDCO INC | 0.00 | 0.00 | 365 |
1988 | REDCO INC | 0.00 | 0.00 | 365 |
1989 | REDCO INC | 0.00 | 0.00 | 365 |
1990 | REDCO INC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | REDCO INC | Brine | 0 | 365 |
1986 | REDCO INC | Brine | 0 | 365 |
1987 | REDCO INC | Brine | 0 | 365 |
1988 | REDCO INC | Brine | 0 | 365 |
1989 | REDCO INC | Brine | 0 | 365 |
1990 | REDCO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000015773 | Final Restoration | No Violations | PASSED Y WITNESSED 8/30/94 INSPECTOR TED DOBBIN DATE 08/3019/94 DATA FROM OLD VAX INFO | |
15773 | FR | No Violations |
For data sources see[9]