If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-23334 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.64,"lon":-81.54,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Jackson Township | |
Operator Name: GENESIS RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: OHIO POWER | |
License Status: Producing | |
License Date: 1984-10-05 | |
Spud Date: 1984-11-18 | |
Spud Drilling Contractor: J & B DRILLING | |
Final Drill Date: 1984-11-24 | |
Well Total Depth: 6118.00 ft | |
Configuration: Vertical | |
Latitude: 39.640000 | |
Longitude: -81.540000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1984-10-05 | 3443 MALVERN GROUP INC GeoDate 10/5/84 |
Oil and Gas | 1984-10-05 | Issued Date 10/5/84 Expired Date 4/3/85 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 06118 Proposed Drill Depth 06118 |
Original Spud | 1984-11-17 | |
Completed | 1984-11-24 | |
Reached Total Depth | 1984-11-24 | |
Completion Report Received | 1984-12-20 | |
Construction Permit Expires | 1985-04-03 | |
CO | 1995-06-15 | 2146 KLJ INC GeoDate 10/5/84 |
CO | 1997-01-14 | 1619 BROWN PHILLIP OIL & GAS GeoDate 10/5/84 |
Change of Owner | 2002-06-10 | Operator changed from 1619, BROWN PHILLIP H JR. CORPORATIO to 952, G-R CONTRACTING INC |
Change of Owner | 2019-01-22 | Operator changed from 952, G-R CONTRACTING INC to 9086, GENESIS RESOURCES LLC |
Record Last Modified | 2019-01-22 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5800 | 5892 | 0 |
5800 | 5892 | 0 | |
2006-09-11 | 5834 | 5848 | 2 |
5834 | 5848 | 2 | |
5800 | 5892 | 0 | |
2006-09-11 | 5950 | 5960 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 48000 Gal | 40000 | CLINTON | ||
N2 | 0 | 154 Mscf | 0 | CLINTON | ||
N2 | 0 | 98 Mscf | 0 | MEDINA | ||
H2O | 0 | 38000 Gal | 40000 | FRAC: H2O,SAND,N2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | BENATTY CORP | 24890.00 | 0.00 | 0 |
1986 | BENATTY CORP | 15731.00 | 0.00 | 365 |
1988 | BENATTY CORP | 13942.00 | 0.00 | 365 |
1989 | BENATTY CORP | 11555.00 | 0.00 | 365 |
1990 | BENATTY CORP | 8670.00 | 0.00 | 365 |
1991 | BENATTY CORP | 6071.00 | 0.00 | 365 |
1992 | MALVERN GROUP INC | 3237.00 | 0.00 | 365 |
1993 | MALVERN GROUP INC | 2590.00 | 0.00 | 365 |
1994 | MALVERN GROUP INC | 3715.00 | 0.00 | 365 |
1995 | KLJ INC | 319.00 | 0.00 | 30 |
1996 | KLJ INC | 4149.00 | 0.00 | 30 |
1997 | KLJ INC | 93.00 | 0.00 | 30 |
1998 | BROWN PHILLIP H JR. CORPORATIO | 5276.00 | 0.00 | 365 |
1999 | BROWN PHILLIP H JR. CORPORATIO | 3311.00 | 0.00 | 365 |
2000 | BROWN PHILLIP H JR. CORPORATIO | 3144.00 | 0.00 | 365 |
2001 | BROWN PHILLIP H JR. CORPORATIO | 4160.00 | 0.00 | 365 |
2002 | G-R CONTRACTING INC | 577.00 | 0.00 | 0 |
2003 | G-R CONTRACTING INC | 2363.00 | 0.00 | 365 |
2004 | G-R CONTRACTING INC | 2620.00 | 0.00 | 365 |
2005 | G-R CONTRACTING INC | 939.00 | 0.00 | 365 |
2006 | G-R CONTRACTING INC | 4066.00 | 0.00 | 365 |
2007 | G-R CONTRACTING INC | 2494.00 | 0.00 | 365 |
2008 | G-R CONTRACTING INC | 1797.00 | 0.00 | 365 |
2009 | G-R CONTRACTING INC | 1309.00 | 0.00 | 365 |
2010 | G-R CONTRACTING INC | 183.00 | 0.00 | 365 |
2011 | G-R CONTRACTING INC | 635.00 | 0.00 | 365 |
2012 | G-R CONTRACTING INC | 1330.00 | 0.00 | 366 |
2013 | G-R CONTRACTING INC | 2595.00 | 0.00 | 365 |
2014 | G-R CONTRACTING INC | 1321.00 | 0.00 | 365 |
2015 | G-R CONTRACTING INC | 2073.00 | 0.00 | 365 |
2016 | G-R CONTRACTING INC | 44.00 | 0.00 | 365 |
2017 | G-R CONTRACTING INC | 1761.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | BENATTY CORP | Brine | 345 | 0 |
1986 | BENATTY CORP | Brine | 120 | 365 |
1988 | BENATTY CORP | Brine | 0 | 365 |
1989 | BENATTY CORP | Brine | 0 | 365 |
1990 | BENATTY CORP | Brine | 0 | 365 |
1991 | BENATTY CORP | Brine | 0 | 365 |
1992 | MALVERN GROUP INC | Brine | 140 | 365 |
1993 | MALVERN GROUP INC | Brine | 0 | 365 |
1994 | MALVERN GROUP INC | Brine | 0 | 365 |
1995 | KLJ INC | Brine | 0 | 30 |
1996 | KLJ INC | Brine | 0 | 30 |
1997 | KLJ INC | Brine | 0 | 30 |
1998 | BROWN PHILLIP H JR. CORPORATIO | Brine | 0 | 365 |
1999 | BROWN PHILLIP H JR. CORPORATIO | Brine | 0 | 365 |
2000 | BROWN PHILLIP H JR. CORPORATIO | Brine | 0 | 365 |
2001 | BROWN PHILLIP H JR. CORPORATIO | Brine | 0 | 365 |
2002 | G-R CONTRACTING INC | Brine | 0 | |
2003 | G-R CONTRACTING INC | Brine | 0 | 365 |
2004 | G-R CONTRACTING INC | Brine | 0 | 365 |
2005 | G-R CONTRACTING INC | Brine | 0 | 365 |
2006 | G-R CONTRACTING INC | Brine | 0 | 365 |
2007 | G-R CONTRACTING INC | Brine | 0 | 365 |
2008 | G-R CONTRACTING INC | Brine | 0 | 365 |
2009 | G-R CONTRACTING INC | Brine | 0 | 365 |
2010 | G-R CONTRACTING INC | Brine | 0 | 365 |
2011 | G-R CONTRACTING INC | Brine | 0 | 365 |
2012 | G-R CONTRACTING INC | Brine | 0 | 366 |
2013 | G-R CONTRACTING INC | Brine | 0 | 365 |
2014 | G-R CONTRACTING INC | Brine | 0 | 365 |
2015 | G-R CONTRACTING INC | Brine | 0 | 365 |
2016 | G-R CONTRACTING INC | Brine | 0 | 365 |
2017 | G-R CONTRACTING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1333093126 | 2019-9-10 0:00: | PW | No Violations | 0.80 |
-1508993824 | 2015-8-10 0:00: | PW | No Violations | 0.50 |
-1981890252 | 2012-6-12 0:00: | PW | No Violations | |
-274901797 | 2012-8-16 0:00: | PW | No Violations | 1.00 |
-346966821 | 2019-6-14 0:00: | PW | No Violations | 1.00 |
0000PL7482 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0051284705 | 2016-05-31 | Production Wells | No Violations | My inspection today finds the well is equipped with 4.5 tubing, 2.875 tubing, and 1.5 tubing with a plunger lift system. The production valves are open. The tank battery consists of one 100 bbl tank and one 50 bbl tank. A production unit with a meter and a current chart are also set on location. |
0274901797 | 2012-08-16 | Production Wells | No Violations | My inspection today finds the well is equipped with 4.5 tubing, 2.875 tubing, and 1.5 tubing with a plunger lift system. Production valves are open. The tank battery consists of one 100 bbl tank and one 50 bbl scrap tank. There is a separator and a meter outside of the dike. |
1508993824 | 2015-08-10 | Production Wells | No Violations | My inspection today finds the well is equipped with 4.5 tubing, 2.875 tubing, and 1.5 tubing with a plunger lift system. The production valves are open. The tank battery consists of one 100 bbl tank and one 50 bbl junk tank. There is a separator and a meter outside of the dike. |
1799663555 | 2020-3-3 0:00:0 | PW | No Violations | 1.00 |
1807598502 | 2020-1-8 0:00:0 | PW | No Violations | 0.80 |
1981890252 | 2012-06-12 | Production Wells | No Violations | Inspection of the well found the following equipment -4.5 production casing -2.875 intermediate string & 1.5 tubing with the production valves open and the well being produced by the means of a plunger lift system .A single 100 barrel tank and a 20 barrel tank are present in a established dike with proper well identification . A separator and meter are present but in a separate dike . |
2067770928 | 2019-11-26 0:00 | PW | No Violations | 0.80 |
225462385 | 2019-10-2 0:00: | PW | No Violations | 0.50 |
282060969 | 2019-7-24 0:00: | PW | No Violations | 1.00 |
51284705 | 2016-5-31 0:00: | PW | No Violations | 1.00 |
PL7482 | PL | No Violations |
For data sources see[9]