If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-23712 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.79,"lon":-81.67,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Brookfield Township | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: CENTRAL OHIO COAL CO | |
License Status: Producing | |
License Date: 2014-05-02 | |
Spud Date: 1991-03-21 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1991-03-28 | |
Well Total Depth: 5400.00 ft | |
Configuration: Vertical | |
Latitude: 39.790000 | |
Longitude: -81.670000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1989-11-03 | 1217 HARRISON ENERGY GeoDate 11/3/89 |
Oil and Gas | 1989-11-03 | Issued Date 11/3/89 Expired Date 11/3/90 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1990-11-26 | 1217 HARRISON ENERGY GeoDate 11/26/90 |
Oil and Gas | 1990-11-26 | Issued Date 11/26/90 Expired Date 11/26/91 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05400 Proposed Drill Depth 05400 |
Original Spud | 1991-03-21 | RI 12-1-90 |
Completed | 1991-03-28 | RI 12-1-90 |
Reached Total Depth | 1991-03-28 | RI 12-1-90 |
Completion Report Received | 1991-04-26 | RI 12-1-90 |
Change of Owner | 2004-01-27 | Operator changed from 1217, HARRISON ENERGY to 5660, S & S ENERGY CORPORATION |
APP | 2014-05-02 | Proposed Formations:, Issued Date:5/2/2014, Expired Date:5/1/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2015-06-02 | Operator changed from 5660, S & S ENERGY CORPORATION to 5569, D & D ENERGY COMPANY |
Construction Permit Expires | 2016-05-01 | RI 12-1-90 |
Record Last Modified | 2019-06-14 | RI 12-1-90 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5166 | 5254 | 0 |
5166 | 5254 | 0 | |
2006-09-11 | 5214 | 5224 | 2 |
5214 | 5224 | 2 | |
5166 | 5254 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 77000 Gal | 50000 | |||
ACID | 0 | 500 Gal | 0 | FRAC:WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | HARRISON ENERGY | 2008.00 | 0.00 | 365 |
1997 | HARRISON ENERGY | 1299.00 | 0.00 | 365 |
1998 | HARRISON ENERGY | 1124.00 | 0.00 | 365 |
1999 | HARRISON ENERGY | 2820.00 | 0.00 | 365 |
2000 | HARRISON ENERGY | 1040.00 | 0.00 | 365 |
2003 | S & S ENERGY CORP | 83.00 | 0.00 | 365 |
2004 | S & S ENERGY CORP | 1041.00 | 53.00 | 365 |
2005 | S & S ENERGY CORP | 611.00 | 45.00 | 365 |
2006 | S & S ENERGY CORP | 1120.00 | 0.00 | 365 |
2007 | S & S ENERGY CORP | 1123.00 | 31.00 | 365 |
2008 | S & S ENERGY CORP | 159.00 | 0.00 | 365 |
2009 | S & S ENERGY CORP | 0.00 | 0.00 | 0 |
2010 | S & S ENERGY CORP | 0.00 | 0.00 | 0 |
2011 | S & S ENERGY CORP | 1397.00 | 0.00 | 365 |
2013 | S & S ENERGY CORP | 2872.00 | 114.00 | 365 |
2014 | S & S ENERGY CORP | 1853.00 | 0.00 | 365 |
2015 | D & D ENERGY COMPANY | 397.00 | 0.00 | 365 |
2016 | D & D ENERGY COMPANY | 2137.00 | 116.00 | 365 |
2017 | D & D ENERGY COMPANY | 1864.00 | 57.00 | 365 |
2018 | D & D ENERGY COMPANY | 785.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | HARRISON ENERGY | Brine | 0 | 365 |
1997 | HARRISON ENERGY | Brine | 0 | 365 |
1998 | HARRISON ENERGY | Brine | 0 | 365 |
1999 | HARRISON ENERGY | Brine | 0 | 365 |
2000 | HARRISON ENERGY | Brine | 0 | 365 |
2003 | S & S ENERGY CORP | Brine | 0 | 365 |
2004 | S & S ENERGY CORP | Brine | 21 | 365 |
2005 | S & S ENERGY CORP | Brine | 6 | 365 |
2006 | S & S ENERGY CORP | Brine | 113 | 365 |
2007 | S & S ENERGY CORP | Brine | 109 | 365 |
2008 | S & S ENERGY CORP | Brine | 125 | 365 |
2009 | S & S ENERGY CORP | Brine | 0 | 0 |
2010 | S & S ENERGY CORP | Brine | 72 | 0 |
2011 | S & S ENERGY CORP | Brine | 275 | 365 |
2013 | S & S ENERGY CORP | Brine | 155 | 365 |
2014 | S & S ENERGY CORP | Brine | 101 | 365 |
2015 | D & D ENERGY COMPANY | Brine | 71 | 365 |
2016 | D & D ENERGY COMPANY | Brine | 254 | 365 |
2017 | D & D ENERGY COMPANY | Brine | 36 | 365 |
2018 | D & D ENERGY COMPANY | Brine | 115 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000000614 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 3/26/93 INSPECTOR TED DOBBIN DATE 03/2619/93 DATA FROM OLD VAX INFO | |
1264047695 | 2009-06-29 | Production Wells | No Violations | Inspection this day found tank but did not go to well. Tank has good IDs, dike is breached and evidence of quite a bit of brine being hauled by staining on ground near valve, meter has been removed. Well not producing? Annual production does not indicate any. |
1609950670 | 2007-12-04 | Production Wells | No Violations | Rabbit well no violations noted well also has 1-100 bbl tank on site with somewhatof a dike in place. |
2001825403 | 2015-10-28 | Production Wells | No Violations | Upon inspection, it was observed that this well is currently in production. The visible casing consists of 2.375 tubing with a ball valve in the open position and associated 2 steel flow lines. The surface casing and production casing are buried. The tank battery consists of 100 bbl production tank, 1100 gallon plastic brine storage tank, mechanical separator, drip, meter run, and containment dike. Legible and correct ID is posted at the production tank. The lease road is in good condition and is graveled. All pipelines associated with the well are buried. The status of the well in RBDMS is PR. No violations were observed. |
614 | PL | No Violations |
For data sources see[9]