If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-23745 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.73,"lon":-81.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Enoch Township | |
Operator Name: LIPPIZAN PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: CONSOLIDATION COAL CO | |
License Status: Producing | |
License Date: 1990-01-30 | |
Spud Date: 1990-05-10 | |
Spud Drilling Contractor: UNGER DRILLING | |
Final Drill Date: 1990-05-16 | |
Well Total Depth: 6266.00 ft | |
Configuration: Vertical | |
Latitude: 39.730000 | |
Longitude: -81.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1990-01-30 | 122 TIGER OIL INC GeoDate 1/30/90 |
Oil and Gas | 1990-01-30 | Issued Date 1/30/90 Expired Date 1/30/91 Acres 0112000 Tool Type CRA Proposed Formation DOH/CLINTON Proposed Depth 06266 Proposed Drill Depth 06266 |
Original Spud | 1990-05-06 | CHG., FORM 5-19-90 |
Completed | 1990-05-16 | CHG., FORM 5-19-90 |
Plugged Back | 1990-05-16 | CHG., FORM 5-19-90 |
Reached Total Depth | 1990-05-16 | CHG., FORM 5-19-90 |
Completion Report Received | 1990-10-02 | CHG., FORM 5-19-90 |
Construction Permit Expires | 1991-01-30 | CHG., FORM 5-19-90 |
CO | 1995-04-25 | 2680 ENERGY CONTRACTORS INC GeoDate 1/30/90 |
Change of Owner | 1998-09-28 | Operator changed from 2680, ENERGY CONTRACTORS INC to 56, BUCKEYE OIL PRODUCING CO |
Record Last Modified | 2017-02-15 | CHG., FORM 5-19-90 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 1782 | 4353 | 0 |
1782 | 4353 | 0 | |
2006-09-11 | 2339 | 2341 | 5 |
2339 | 2341 | 5 | |
1782 | 4353 | 0 | |
2006-09-11 | 2640 | 2643 | 5 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 500 Mscf | 0 | 600M SCF NITROGEN |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 141 |
1999 | BUCKEYE OIL PRODUCING CO | 2301.00 | 278.00 | 0 |
2000 | BUCKEYE OIL PRODUCING CO | 1183.00 | 180.00 | 0 |
2001 | BUCKEYE OIL PRODUCING CO | 1408.00 | 212.00 | 365 |
2002 | BUCKEYE OIL PRODUCING CO | 1467.00 | 275.00 | 365 |
2003 | BUCKEYE OIL PRODUCING CO | 3386.00 | 372.00 | 365 |
2004 | BUCKEYE OIL PRODUCING CO | 2342.00 | 164.00 | 365 |
2005 | BUCKEYE OIL PRODUCING CO | 2486.00 | 243.00 | 365 |
2006 | BUCKEYE OIL PRODUCING CO | 3103.00 | 298.00 | 365 |
2007 | BUCKEYE OIL PRODUCING CO | 2307.00 | 205.00 | 365 |
2008 | BUCKEYE OIL PRODUCING CO | 2249.00 | 268.00 | 365 |
2009 | BUCKEYE OIL PRODUCING CO | 1431.00 | 106.00 | 365 |
2010 | BUCKEYE OIL PRODUCING CO | 1133.00 | 122.00 | 365 |
2011 | BUCKEYE OIL PRODUCING CO | 1647.00 | 47.00 | 365 |
2012 | BUCKEYE OIL PRODUCING CO | 1625.00 | 83.00 | 366 |
2013 | BUCKEYE OIL PRODUCING CO | 1422.00 | 0.00 | 365 |
2014 | BUCKEYE OIL PRODUCING CO | 1449.00 | 210.00 | 365 |
2015 | BUCKEYE OIL PRODUCING CO | 1298.00 | 72.00 | 365 |
2016 | BUCKEYE OIL PRODUCING CO | 3527.00 | 107.00 | 365 |
2017 | BUCKEYE OIL PRODUCING CO | 2230.00 | 0.00 | 365 |
2018 | BUCKEYE OIL PRODUCING CO | 1754.00 | 50.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | BUCKEYE OIL PRODUCING CO | Brine | 141 | |
1999 | BUCKEYE OIL PRODUCING CO | Brine | 0 | |
2000 | BUCKEYE OIL PRODUCING CO | Brine | ||
2001 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2002 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2003 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2004 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2005 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2006 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2007 | BUCKEYE OIL PRODUCING CO | Brine | 43 | 365 |
2008 | BUCKEYE OIL PRODUCING CO | Brine | 15 | 365 |
2009 | BUCKEYE OIL PRODUCING CO | Brine | 2 | 365 |
2010 | BUCKEYE OIL PRODUCING CO | Brine | 5 | 365 |
2011 | BUCKEYE OIL PRODUCING CO | Brine | 2 | 365 |
2012 | BUCKEYE OIL PRODUCING CO | Brine | 1 | 366 |
2013 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2014 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2015 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2016 | BUCKEYE OIL PRODUCING CO | Brine | 2 | 365 |
2017 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2018 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1199817618 | 2016-3-16 0:00: | PW | No Violations | 1.00 |
-1921117564 | 2004-3-30 0:00: | PW | No Violations | |
-2120125609 | 2016-3-15 0:00: | PW | No Violations | 1.00 |
-592316158 | 2020-8-13 0:00: | PW | No Violations | 0.60 |
0000014316 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 10/20/95 INSPECTOR TED DOBBIN DATE 10/2019/95 DATA FROM OLD VAX INFO | |
0014248301 | 2012-11-19 | Production Wells | No Violations | My inspection today finds the well is equipped with 4.5 casing, 1.5 tubing, rods, and a pump jack. The production valves are open. The tank battery consists of one 100 bbl tank and a separator. The tank has the proper identification and is located within a dike. The meter is located off site. |
1199817618 | 2016-03-16 | Production Wells | No Violations | My inspection today finds the well is equipped with a pumping unit. The tank battery consists of two 100 barrel tanks, a meter, and a separator. The equipment is inside a dike, and has proper identification posted. |
1340816788 | 2012-06-27 | Production Wells | No Violations | Inspection of the well head found 4.5 production casing, 1.5 tubing & rods with the production valves open and a pumping unit in place. A 100 barrel tank and separator are present on location near the well head. Inspector will note that contact was made with company representative Gary Lemon about putting up proper well identification. |
14248301 | 2012-11-19 0:00 | PW | No Violations | 0.50 |
14316 | PL | No Violations | ||
1921117564 | 2004-03-30 | Production Wells | No Violations | No violations noted,will need dike constructed around 100bbl tank when SPCC regs go into effect.Talked to Gary Lemmon company field supervisor@330-201-0332 about getting dikes on production tanks completed. |
2120125609 | 2016-03-15 | Production Wells | No Violations | My inspection today finds the well is equipped with a pumping unit. The tank battery consists of two 100 barrel tanks, a separator and two meters. The production equipment is located in an earthen dike. The production equipment is shared with another well. |
365221541 | 2020-8-13 0:00: | PW | No Violations |
For data sources see[9]