If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-23807 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Brookfield Township | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: CENTRAL OHIO COAL CO | |
License Status: Producing | |
License Date: 1991-04-16 | |
Spud Date: 1991-04-23 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1991-04-26 | |
Well Total Depth: 5510.00 ft | |
Configuration: Vertical | |
Latitude: 39.800000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1991-04-16 | 1217 HARRISON ENERGY GeoDate 4/16/91 |
Oil and Gas | 1991-04-16 | Issued Date 4/16/91 Expired Date 4/15/92 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05510 Proposed Drill Depth 05510 |
Original Spud | 1991-04-23 | |
Completed | 1991-04-26 | |
Reached Total Depth | 1991-04-26 | |
Completion Report Received | 1991-05-06 | |
Construction Permit Expires | 1992-04-15 | |
Change of Owner | 2004-01-27 | Operator changed from 1217, HARRISON ENERGY to 5660, S & S ENERGY CORPORATION |
Change of Owner | 2015-06-02 | Operator changed from 5660, S & S ENERGY CORPORATION to 5569, D & D ENERGY COMPANY |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5317 | 5324 | 8 |
2006-09-11 | 5347 | 5358 | 12 |
5317 | 5324 | 8 | |
5317 | 5324 | 8 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 94000 Gal | 60000 | |||
ACID | 0 | 500 Gal | 0 | FRAC W/94M GAL H20,600 SX SAND, 31 | ||
N2 | 0 | 31 Mscf | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | HARRISON ENERGY | 13233.00 | 0.00 | 365 |
1997 | HARRISON ENERGY | 8965.00 | 0.00 | 365 |
1998 | HARRISON ENERGY | 5582.00 | 0.00 | 365 |
1999 | HARRISON ENERGY | 6112.00 | 0.00 | 365 |
2000 | HARRISON ENERGY | 2528.00 | 0.00 | 365 |
2003 | S & S ENERGY CORP | 324.00 | 0.00 | 365 |
2004 | S & S ENERGY CORP | 1963.00 | 0.00 | 365 |
2005 | S & S ENERGY CORP | 4840.00 | 0.00 | 365 |
2006 | S & S ENERGY CORP | 4086.00 | 0.00 | 365 |
2007 | S & S ENERGY CORP | 3312.00 | 0.00 | 365 |
2008 | S & S ENERGY CORP | 4189.00 | 0.00 | 365 |
2010 | S & S ENERGY CORP | 5056.00 | 0.00 | 365 |
2011 | S & S ENERGY CORP | 4707.00 | 0.00 | 365 |
2013 | S & S ENERGY CORP | 4278.00 | 0.00 | 365 |
2014 | S & S ENERGY CORP | 3048.00 | 0.00 | 365 |
2015 | D & D ENERGY COMPANY | 771.00 | 0.00 | 0 |
2016 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
2017 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
2018 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | HARRISON ENERGY | Brine | 0 | 365 |
1997 | HARRISON ENERGY | Brine | 0 | 365 |
1998 | HARRISON ENERGY | Brine | 0 | 365 |
1999 | HARRISON ENERGY | Brine | 0 | 365 |
2000 | HARRISON ENERGY | Brine | 0 | 365 |
2003 | S & S ENERGY CORP | Brine | 0 | 365 |
2004 | S & S ENERGY CORP | Brine | 96 | 365 |
2005 | S & S ENERGY CORP | Brine | 115 | 365 |
2006 | S & S ENERGY CORP | Brine | 41 | 365 |
2007 | S & S ENERGY CORP | Brine | 70 | 365 |
2008 | S & S ENERGY CORP | Brine | 131 | 365 |
2010 | S & S ENERGY CORP | Brine | 116 | 365 |
2011 | S & S ENERGY CORP | Brine | 75 | 365 |
2013 | S & S ENERGY CORP | Brine | 74 | 365 |
2014 | S & S ENERGY CORP | Brine | 80 | 365 |
2015 | D & D ENERGY COMPANY | Brine | 0 | 0 |
2016 | D & D ENERGY COMPANY | Brine | 0 | 0 |
2017 | D & D ENERGY COMPANY | Brine | 0 | 0 |
2018 | D & D ENERGY COMPANY | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2081908104 | 2015-10-29 0:00 | PW | No Violations | 1.00 |
0000017846 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 10/7/92 INSPECTOR TED DOBBIN DATE 10/0719/92 DATA FROM OLD VAX INFO | |
17846 | PL | No Violations | ||
2081908104 | 2015-10-29 | Production Wells | No Violations | Upon inspection, it was observed that this well is capable of production, but is currently shut-in. The well consists of 12 conductor, 8.625 surface casing, 4.5 production casing, and 1.5 production tubing with a plunger lift system. The tank battery consists of a 100 bbl production tank, horizontal separator, drip, meter run, and containment dike. Legible ID is posted at the well and on the production tank, however the permit number posted is incorrect. The lease road is in good condition and is stabilized with vegetation. The status of the well in RBDMS is PR. |
For data sources see[9]