If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-121-24166 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.68,"lon":-81.4,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Noble | |
| Municipality: Enoch Township | |
| Operator Name: ALLIANCE PETROLEUM CORPORATION | |
| Well Pad ID: | |
| Farm/Lease Name: STATE OF OHIO/MM | |
| License Status: Final Restoration | |
| License Date: 2008-10-14 | |
| Spud Date: 2006-01-23 | |
| Spud Drilling Contractor: CENTURY WELL SERVICES,INC | |
| Final Drill Date: 2006-01-25 | |
| Well Total Depth: 2010.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.680000 | |
| Longitude: -81.400000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2005-10-21 | Proposed Formations:BEREA/GORDON, Issued Date:10/21/2005, Expired Date:10/21/2006 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2006-01-23 | RBDMS Rec |
| Completed | 2006-01-25 | RBDMS Rec |
| Reached Total Depth | 2006-01-25 | RBDMS Rec |
| Completion Report Received | 2006-03-06 | RBDMS Rec |
| APP | 2008-10-14 | Proposed Formations:OHIO SHALE, Issued Date:10/14/2008, Expired Date:10/14/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2008-10-15 | RBDMS Rec |
| Construction Permit Expires | 2009-10-14 | RBDMS Rec |
| Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-05-24 | 1618 | 1624 | 10 |
| 2006-05-24 | 1518 | 1527 | 20 |
| 1518 | 1527 | 20 | |
| 1618 | 1624 | 10 | |
| 1750 | 1780 | 12 | |
| 1852 | 1928 | 24 | |
| 1518 | 1527 | 20 | |
| 2006-05-24 | 1852 | 1928 | 24 |
| 2006-05-24 | 1750 | 1780 | 12 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 57000 Gal | 22500 | 3 STAGE FRAC:19M GALLONS WATER, 75 SX SAND & 500 GALLONS ACID /STAGE |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2006 | ALLIANCE PETROLEUM CORPORATION | 103.00 | 0.00 | 304 |
| 2007 | ALLIANCE PETROLEUM CORPORATION | 163.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2006 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 304 |
| 2007 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 1162656430 | 2006-10-30 | Preliminary Restoration | No Violations | Restoration work at site satisfactory, well is equipped with pump jack and 1-100 bbl tank and 1-50 bbl plastic tank. |
| 1235924769 | 2009-02-26 | Final Restoration | No Violations | Restoration work at site satisfactory,pit has been filled in and site restored and vegetation has been established. |
| 1978663495 | 2008-10-10 | Plug / Plug Back | No Violations | Stopped by service rig they were pulling tubing removing bottom joint then they will run tubing back into well to set bottom hole plug at a later date. |
For data sources see[9]