If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24341 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.68,"lon":-81.54,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Olive Township | |
Operator Name: W P BROWN ENTERPRISES INC | |
Well Pad ID: | |
Farm/Lease Name: D & G GARVIN | |
License Status: Producing | |
License Date: 2010-08-09 | |
Spud Date: 2010-08-18 | |
Spud Drilling Contractor: TOP DRILLING | |
Final Drill Date: 2010-08-22 | |
Well Total Depth: 2450.00 ft | |
Configuration: Vertical | |
Latitude: 39.680000 | |
Longitude: -81.540000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-08-09 | Proposed Formations:OHIO SHALE, Issued Date:8/9/2010, Expired Date:8/8/2012 12:00:00 PM, Drilling unit acres:30, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-08-22 | |
Completion Report Received | 2010-10-19 | |
Construction Permit Expires | 2012-08-08 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-12-13 | 1810 | 2290 | 90 |
1810 | 2290 | 90 | |
1810 | 2290 | 90 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-09-08 | H2O | 20 | 4000 Bbl | 50000 | Producers Service Corporation | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | W P BROWN ENTERPRISES INC | 416.00 | 0.00 | 91 |
2011 | BURKE GERALD & MARLENE | 2446.00 | 150.00 | 365 |
2012 | W P BROWN ENTERPRISES INC | 2103.00 | 61.00 | 366 |
2013 | W P BROWN ENTERPRISES INC | 1752.00 | 67.00 | 365 |
2014 | W P BROWN ENTERPRISES INC | 653.00 | 34.00 | 365 |
2015 | W P BROWN ENTERPRISES INC | 459.00 | 0.00 | 365 |
2016 | W P BROWN ENTERPRISES INC | 807.00 | 106.00 | 365 |
2017 | W P BROWN ENTERPRISES INC | 483.00 | 25.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | W P BROWN ENTERPRISES INC | Brine | 964 | 91 |
2011 | BURKE GERALD & MARLENE | Brine | 155 | 365 |
2012 | W P BROWN ENTERPRISES INC | Brine | 45 | 366 |
2013 | W P BROWN ENTERPRISES INC | Brine | 56 | 365 |
2014 | W P BROWN ENTERPRISES INC | Brine | 0 | 365 |
2015 | W P BROWN ENTERPRISES INC | Brine | 0 | 365 |
2016 | W P BROWN ENTERPRISES INC | Brine | 0 | 365 |
2017 | W P BROWN ENTERPRISES INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-616586161 | 2010-9-8 0:00:0 | CT | No Violations | |
0043731490 | 2014-08-14 | Production Wells | No Violations | My inspection today finds the well equipped with 4.5 casing and 1.5 tubing with a plunger lift system. There is a domestic gas hookup at the well head. The tank battery consists of a 100 bbl tank and a horizontal separator with a meter. The identification is properly posted. |
0197734797 | 2012-08-15 | Production Wells | No Violations | My inspection today finds the well equipped with 4.5 casing and 1.5 tubing with a plunger lift system. There is a domestic gas hookup at the well head. The tank battery consists of a 100 bbl tank and a horizontal separator with a meter. The identification and the dike are adequate. |
0616586161 | 2010-09-08 | Completion Testing | No Violations | On site to witness frac job Producers Services pmped 34,000 bbl of water and 50,000# of sand and 1000 gal of acid into well ,break pressure was noted at 1550 psi and well treated at 1400 psi at 24 bpm. |
1164779652 | 2012-01-12 | Preliminary Restoration | No Violations | Upon inspection of well site area found all pits filled and vegetation established, at wellhead found 1.5tubing produced through the plunger lift means with production valves open -at production fluid area found a properly constructed dike, single 100 barrel tank, separator and meter run. |
1208873072 | 2012-01-12 | Preliminary Restoration | No Violations | Upon inspection of well site area found all pits filled and vegetation established ,at wellhead found 1.5tubing produced through the plunger lift means with production valves open -at production fluid area found a properly constructed dike, single 100 barrel tank ,separator and meter run . |
1282862797 | 2010-08-26 | Completion Testing | No Violations | Owner bond logged well and cement top was located at 1500 owner will perf casing next week and frac well on Sept 9th. |
1283291035 | 2010-08-31 | Completion Testing | No Violations | Company rep called and stated they were going to perforate well today and possibly frac well next week. |
1924202368 | 2010-08-16 | Drill / Deepen / Reopen | No Violations | Top drilling moving in on site to drill new well, inspected pit area and all appeared to be OK. |
197734797 | 2012-8-15 0:00: | PW | No Violations | 0.50 |
43731490 | 2014-8-14 0:00: | PW | No Violations | 1.00 |
For data sources see[9]