If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24365 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.94,"lon":-81.28,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000619 | |
Farm/Lease Name: NOBLE UNIT | |
License Status: Producing | |
License Date: 2012-06-08 | |
Spud Date: 2012-07-06 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2012-10-12 | |
Well Total Depth: 11740.00 ft | |
Configuration: Horizontal | |
Latitude: 39.940000 | |
Longitude: -81.280000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-05-29 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:5/29/2012, Expired Date:5/29/2014 12:00:00 PM, Drilling unit acres:91.05, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2012-06-08 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/8/2012, Expired Date:6/8/2014 12:00:00 PM, Drilling unit acres:91.05, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-07-13 | CHANGE IN CASING PROGRAM PER INSTRUCTIONS FROM OPERATOR. |
Reached Total Depth | 2012-10-12 | |
Correction to Well | 2013-03-15 | CHANGE IN TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 89.67 ACRES. |
Completion Report Received | 2013-05-09 | |
Construction Permit Expires | 2014-06-08 | |
Change of Owner | 2017-02-15 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 8943, ANTERO RESOURCES CORPORATION |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-01-23 | 9395 | 9545 | 60 |
2013-01-23 | 8950 | 9095 | 60 |
2013-01-23 | 9995 | 10145 | 60 |
2013-01-23 | 11045 | 11195 | 60 |
2013-01-23 | 10895 | 11045 | 60 |
2013-01-23 | 11195 | 11345 | 60 |
2013-01-23 | 11510 | 11645 | 60 |
2013-01-23 | 11345 | 11510 | 60 |
2013-01-23 | 10295 | 10445 | 60 |
2013-01-23 | 10145 | 10295 | 60 |
2013-01-23 | 10445 | 10595 | 60 |
2013-01-23 | 9245 | 9395 | 60 |
2013-01-23 | 10745 | 10895 | 60 |
11510 | 11645 | 60 | |
11345 | 11510 | 60 | |
11195 | 11345 | 60 | |
11045 | 11195 | 60 | |
10895 | 11045 | 60 | |
10745 | 10895 | 60 | |
10595 | 10745 | 60 | |
10445 | 10595 | 60 | |
10295 | 10445 | 60 | |
10145 | 10295 | 60 | |
9995 | 10145 | 60 | |
9845 | 9995 | 60 | |
9700 | 9845 | 60 | |
9545 | 9700 | 60 | |
9395 | 9545 | 60 | |
9245 | 9395 | 60 | |
9095 | 9245 | 60 | |
8950 | 9095 | 60 | |
8795 | 8950 | 60 | |
8645 | 8795 | 60 | |
8494 | 8645 | 60 | |
2013-01-23 | 10595 | 10745 | 60 |
8494 | 8645 | 60 | |
2013-01-23 | 9545 | 9700 | 60 |
2013-01-23 | 9845 | 9995 | 60 |
2013-01-23 | 9700 | 9845 | 60 |
2013-01-23 | 8645 | 8795 | 60 |
2013-01-23 | 8494 | 8645 | 60 |
2013-01-23 | 8795 | 8950 | 60 |
2013-01-23 | 9095 | 9245 | 60 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/17/2012 | 12/17/2012 | 8202.00 | 5,085,528.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ParaSorb 5005 | Baker Hughes | Paraffin Inhibitor | Ethylene-Vinyl Acetate Copolymer | 5.00 | 0.00054000 | ||
White mineral oil, petroleum | 8042-47-5 | 5.00 | 0.00054000 | |||||
Solvent naphtha, petroleum, heavy arom. | 64742-94-5 | 10.00 | 0.00108000 | |||||
Alkenes, C24-25 alpha-, polymers
with maleic anhydride, docosyl esters |
68607-07-8 | 30.00 | 0.00325000 | |||||
Quartz | 14808-60-7 | 1.00 | 0.00011000 | |||||
Naphthalene | 91-20-3 | 1.00 | 0.00011000 | |||||
Diatomaceous earth, calcined | 91053-39-3 | 100.00 | 0.01 | |||||
Water | Rex Energy | Base Fluid | Water | 7732-18-5 | 100.00 | 87.63 | ||
ICI-3240 | ICI | Bactericide | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00193000 | ||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.01 | |||||
Sand (Proppant) | Vertex | Proppant | Quartz | 14808-60-7 | 100.00 | 10.44 | ||
CS-500 SI | ICI | Scale Inhibitor | Ethylene glycol | 107-21-1 | 10.00 | 0.00477000 | ||
FRW-300 | ICI | Friction Reducer | Ethylene glycol | 107-21-1 | 5.00 | 0.00 | ||
FE 100L (Iron Chelator) | ICI | Iron Control | Citric acid | 77-92-9 | 55.00 | 0.00297000 | ||
HVG-1 | Frac Tech Services (FTS) | Gel | Quartz | 14808-60-7 | 2.50 | 0.00006000 | ||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.00116000 | |||||
Ethoxylated propoxylated C12-14 alcohols | 68439-51-0 | 2.50 | 0.00006000 | |||||
Guar gum | 9000-30-0 | 45.00 | 0.00105000 | |||||
ScaleSorb 7 | Baker Hughes | Scale Inhibitor | Organo Phosphonic Acid Salt | 40.00 | 0.00174000 | |||
Quartz | 14808-60-7 | 1.00 | 0.00004000 | |||||
Diatomaceous earth, calcined | 91053-39-3 | 65.00 | 0.00282000 | |||||
APB-01 Ammonium Persulfate Breaker | Frac Tech Services (FTS) | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 95.00 | 0.00004000 | ||
CI-150L | ICI | Corrosion Inhibitor | Quaternary Ammonium Compound | 5.00 | 0.00014000 | |||
Aromatic Aldehyde | 5.00 | 0.00014000 | ||||||
Organic Amine Resin Salt | 10.00 | 0.00028000 | ||||||
Isopropanol | 67-63-0 | 30.00 | 0.00083000 | |||||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00028000 | |||||
Shale Surf 1000 | Frac Tech Services (FTS) | Surfactant | (4R)-1-methyl-4-(prop-1-en-2-yl)cyclohexene | 5989-27-5 | 10.00 | 0.00792000 | ||
Ethoxylated Alcohol | 20.00 | 0.01 | ||||||
Poly-(oxy-1,2-ethanediyl)-alpha-undecyl-omega-hydroxy | 34398-01-1 | 11.00 | 0.00871000 | |||||
Isopropanol | 67-63-0 | 10.00 | 0.00792000 | |||||
Methanol | 67-56-1 | 10.00 | 0.00792000 | |||||
2-Butoxyethanol | 111-76-2 | 10.00 | 0.00792000 | |||||
NE-100L | ICI | Non-Emulsifier | 2-Butoxyethanol | 111-76-2 | 10.00 | 0.00015000 | ||
Alkylaryl sulphonic acid | 27176-87-0 | 5.00 | 0.00008000 | |||||
Isopropanol | 67-63-0 | 10.00 | 0.00015000 | |||||
FRW-200W | ICI | Friction Reducer | Ethylene glycol | 107-21-1 | 4.00 | 0.00310000 | ||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
Acid (Hydrochloric) | Frac Tech Services (FTS) | Acidizing | Hydrochloric acid | 7647-01-0 | 7.50 | 0.12 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-12-16 | H2O | 8 | 5637 Bbl | 249800 | Frac Tech Services | STAGE 18 |
0 | 0 | 0 | STAGE 22 | |||
2012-12-15 | H2O | 8 | 5866 Bbl | 252982 | Frac Tech Services | STAGE 12 |
2012-12-16 | H2O | 8 | 5583 Bbl | 256452 | Frac Tech Services | STAGE 15 |
2012-12-16 | H2O | 8 | 5684 Bbl | 256205 | Frac Tech Services | STAGE 16 |
2012-12-13 | H2O | 8 | 5262 Bbl | 200000 | Frac Tech Services | STAGE 6 |
2012-12-12 | H2O | 8 | 5180 Bbl | 199000 | Frac Tech Services | STAGE 3 |
2012-12-11 | H2O | 8 | 7525 Bbl | 288000 | Frac Tech Services | STAGE 1 |
2012-12-14 | H2O | 8 | 5455 Bbl | 254200 | Frac Tech Services | STAGE 10 |
2012-12-17 | H2O | 8 | 5969 Bbl | 275598 | Frac Tech Services | STAGE 21 |
2012-12-13 | H2O | 8 | 6342 Bbl | 256000 | Frac Tech Services | STAGE 4 |
2012-12-14 | H2O | 8 | 5491 Bbl | 255000 | Frac Tech Services | STAGE 9 |
2012-12-13 | H2O | 8 | 5706 Bbl | 251200 | Frac Tech Services | STAGE 5 |
0 | 0 | 0 | ||||
2012-12-17 | H2O | 8 | 4521 Bbl | 127025 | Frac Tech Services | STAGE 20 |
2012-12-16 | H2O | 8 | 5524 Bbl | 238900 | Frac Tech Services | STAGE 17 |
2012-12-15 | H2O | 8 | 5294 Bbl | 256651 | Frac Tech Services | STAGE 11 |
2012-12-12 | H2O | 8 | 6794 Bbl | 255500 | Frac Tech Services | STAGE 2 |
2012-12-14 | H2O | 8 | 5273 Bbl | 230000 | Frac Tech Services | STAGE 8 |
2012-12-17 | H2O | 8 | 5670 Bbl | 255628 | Frac Tech Services | STAGE 19 |
2012-12-15 | H2O | 8 | 5444 Bbl | 240000 | Frac Tech Services | STAGE 14 |
2012-12-14 | H2O | 0 | 5841 Bbl | 260600 | Frac Tech Services | STAGE 7 |
2012-12-15 | H2O | 8 | 5624 Bbl | 25440 | Frac Tech Services | STAGE 13 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | R E GAS DEVELOPMENT LLC | 658248 | 10635 | 219 |
2014 | R E GAS DEVELOPMENT LLC | 576825 | 3273 | 365 |
2015 | R E GAS DEVELOPMENT LLC | 337271 | 1069 | 352 |
2016 | R E GAS DEVELOPMENT LLC | 263478 | 752 | 364 |
2017 | ANTERO RESOURCES CORPORATION | 141604 | 316 | 286 |
2018 | ANTERO RESOURCES CORPORATION | 175813 | 1226 | 362 |
2019 | ANTERO RESOURCES CORPORATION | 41439 | 190 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | R E GAS DEVELOPMENT LLC | Brine | 3337 | 219 |
2014 | R E GAS DEVELOPMENT LLC | Brine | 1345 | 365 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 1979 | 352 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 1600 | 364 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 0 | 286 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 0 | 362 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 0 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-168281621 | 2012-9-7 0:00:0 | DD | No Violations | |
-1840693606 | 2012-9-4 0:00:0 | DD | No Violations | |
-189193336 | 2017-3-16 0:00: | PW | No Violations | 0.50 |
-610231780 | 2012-9-23 0:00: | DD | No Violations | |
-615091327 | 2017-1-5 0:00:0 | PW | No Violations | 0.50 |
-620676576 | 2014-3-31 0:00: | PL | No Violations | 0.50 |
-889975145 | 2019-1-7 0:00:0 | PW | No Violations | 0.80 |
0168281621 | 2012-09-07 | Drill / Deepen / Reopen | No Violations | On site to set cement plug in well so driller can go around lost tool in hole@6510 they set a 450 in wellbore@6490-6053 calculated top of cement they will let cement set for 24 hours before nudging around lost tool. |
0189193336 | 2017-03-16 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of three gas production units, six 400 barrel tanks, and one combustor. Identification was present and production records were current. Antero Resources was on location preforming maintenance on a gas production unit. |
0448925398 | 2016-05-16 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of six 400 barrel tanks set in a plastic lined steel containment system. Also set in the same containment, are three production units. Mark West personnel are on site to run a pig through the pipe line. |
0610231780 | 2012-09-23 | Drill / Deepen / Reopen | No Violations | On site to witness cementing of 9.625 casing hole was drilled to 6781 and 6553 of casing was run and Universal Well Services cemented it in place with 1225 sacks cement. |
0615091327 | 2017-01-05 | Production Wells | No Violations | On the day of inspection accompanied by ODNR Senior Health Physicist Paul Carder, The well was equipped with a production tree with valves in the open position and a gauge present read 255 pounds per square inch on the casing. Production equipment included a sand trap, a line heater and a GP Unit with a 4 inch sales meter with a 1.5 inch orifice and chart recorder. Also present a vapor tower and 6-400 barrel tanks all within containment and a gas combustor all shared with the Guernsey Unit 1H and Guernsey Unit 2H. A fenced in water impoundment with life preservers is located south west of the well pad. |
0620676576 | 2014-03-31 | Preliminary Restoration | No Violations | My inspection today finds the well appears to capable of production. The preliminary restoration requirements have been met. The tank battery consists of eighteen 400 bbl tanks. Identification is posted in accordance with 1501.9-9-05(A)10. The lease road is in good repair. Production records are current. |
0825770298 | 2017-08-10 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of three gas production units, six 400 barrel tanks, and one combustor. Identification was present and production records were current. Construction equipment was parked on the east side of the pad. |
0889975145 | 2019-01-07 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place on the 9.625-inch diameter deep intermediate casing and pressure was at 215 pounds per square inch. The 13.375-inch diameter casing was stubbed up to surface with a 2-inch diameter valve that was cracked at the time of my inspection. Production equipment included a Gas Processing Unit, as well as 6- 400-barrel steel production fluid tanks, and a combustor that was shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. There was a Mark West midstream valve site near located on the northwest corner of the pad. Identification tags were present, and production was up to date. |
1219365149 | 2013-02-15 | Completion Testing | No Violations | Stopped by drill pad for update current operations at site is they are finalizing well hookup to tanks .
Note: Trash and other debris needs to be picked up and placed in trash dumpster and also it was noted that on east side slope of pad is showing signs of possible slippage it will need to be repaired when weather conditions allow. |
1348870753 | 2012-09-28 | Drill / Deepen / Reopen | No Violations | Onsite to witness setting of 500 cement plug in bottom of well, plug was set@6759-5259 Universal Well Services pumped 185 sacks cement and owner will wait 24 hours before attempting to drill cement in hopes of sealing off loss circulation zone. |
1627994238 | 2019-12-24 0:00 | PW | No Violations | 0.50 |
1840693606 | 2012-09-04 | Drill / Deepen / Reopen | No Violations | Inspection revealed that drilling rig was stuck in hole and at present time they were planning on backing off drill string and then go back in hole with a set of hydraulic jars and overshot to try and retrieve lost tools. |
1926616688 | 2019-7-31 0:00: | PW | No Violations | 0.50 |
2105614265 | 2012-10-24 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is at 5887, and are currently drilling. |
448925398 | 2016-5-16 0:00: | PW | No Violations | 1.00 |
825770298 | 2017-8-10 0:00: | PW | No Violations | 0.20 |
For data sources see[10]