If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24394 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Stock Township | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: US-OH-000368 | |
Farm/Lease Name: RESERVE COAL PROPERTIES CO | |
License Status: Plugged Back | |
License Date: 2013-01-11 | |
Spud Date: 2012-11-30 | |
Spud Drilling Contractor: NABORS DRILLING | |
Final Drill Date: 2013-01-23 | |
Well Total Depth: 8150.00 ft | |
Configuration: Vertical | |
Latitude: 39.740000 | |
Longitude: -81.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-11-21 | Proposed Formations:POINT PLEASANT, Issued Date:11/21/2012, Expired Date:11/21/2014 12:00:00 PM, Drilling unit acres:167.33, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2013-01-11 | Proposed Formations:TRENTON, Issued Date:1/11/2013, Expired Date:1/11/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Plugged Back | 2013-01-23 | |
Reached Total Depth | 2013-01-23 | |
End of Confidential Data | 2014-01-23 | |
Construction Permit Expires | 2015-01-11 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/18/2013 | 07/25/2013 | 7999 | 4,760,660.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water, | Customer & CWS | Base Fluid & Mix Water, | Water | 7732-18-5 | 100 | 86.1232 | 39,739,600.0 |
and (Proppant), DAP-103, DAP-903,
DWP-111, DWP-614, DWP-901, BioClear 2000, DWP-NE1, Spearhead Acid, |
CWS | Propping Agent, Iron Control, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations, | 2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.0069 | 3178.25 | |
Phenolic resin | 9003-35-4 | 5 | 0.0794 | 36629.7 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 12.5147 | 5,774,610.0 | ||||
Distillates (petroleum), hydrotreated middle | 64742-46-7 | 60 | 0.1114 | 51414 | ||||
Calcite | 471-34-1 | 1 | 0.0196 | 9048.52 | ||||
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether | 37251-67-5 | 1.5 | 0.0021 | 979.82 | ||||
Biotite | 1302-27-8 | 0.1 | 0.0026 | 1178.63 | ||||
Guar gum | 9000-30-0 | 60 | 0.0849 | 39192.7 | ||||
Apatite | 64476-38-6 | 0.1 | 0.0026 | 1178.63 | ||||
Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.0016 | 716.45 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 40 | 0.0353 | 16295 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 0.1 | 0.0038 | 1738.57 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 40 | 0.0129 | 5938.79 | ||||
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite |
68953-58-2 | 5 | 0.0071 | 3266.06 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.1 | 0.0038 | 1738.57 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.0016 | 747.75 | ||||
Goethite | 1310-14-1 | 0.1 | 0.0044 | 2040.4 | ||||
Sodium chloride | 7647-14-5 | 0.1 | 0.0001 | 57.95 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.0215 | 9941.28 | ||||
Methanol | 67-56-1 | 15 | 0.0122 | 5626.48 | ||||
Propargyl Alcohol | 107-19-7 | 0.1 | 0.0013 | 579.52 | ||||
Hydrochloric acid | 7647-01-0 | 35 | 0.8792 | 405666 | ||||
Illite | 12173-60-3 | 1 | 0.0044 | 2018.93 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.1 | 0.0038 | 1738.57 | ||||
Polyethylene Glycol Mixture | 25322-68-3 | 70 | 0.0129 | 5938.79 | ||||
Modified thiourea polymer | 68527-49-1 | 0.1 | 0.0038 | 1738.57 | ||||
Formaldehyde | 50-00-0 | 0.1 | 0.0003 | 116.64 | ||||
Citric Acid | 77-92-9 | 60 | 0.0093 | 4293.07 | ||||
Isopropanol | 67-63-0 | 40 | 0.0124 | 5731.58 | ||||
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.0124 | 5731.58 | ||||
Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.0044 | 2036.88 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-07-18 | H2O | 15 | 5252 Bbl | 364780 | CalFrac | STAGE 1 |
2013-07-22 | H2O | 15 | 8317 Bbl | 371920 | CalFrac | STAGE 8 |
2013-07-21 | H2O | 15 | 5214 Bbl | 344240 | CalFrac | STAGE 5 |
2013-07-24 | H2O | 15 | 6002 Bbl | 371980 | CalFrac | STAGE 13 |
2013-07-21 | H2O | 15 | 5054 Bbl | 350010 | CalFrac | STAGE 4 |
2013-07-24 | H2O | 15 | 6618 Bbl | 376580 | CalFrac | STAGE 12 |
2013-07-24 | H2O | 5 | 4704 Bbl | 330464 | CalFrac | STAGE 14 |
2013-07-25 | H2O | 15 | 4934 Bbl | 366020 | CalFrac | STAGE 16 |
2013-07-23 | H2O | 15 | 5393 Bbl | 37719 | CalFrac | STAGE 10 |
2013-07-19 | H2O | 15 | 5522 Bbl | 343380 | CalFrac | STAGE 2 |
2013-07-22 | H2O | 15 | 5190 Bbl | 377280 | CalFrac | STAGE 7 |
2013-07-21 | H2O | 15 | 6323 Bbl | 370500 | CalFrac | STAGE 11 |
2013-07-25 | H2O | 15 | 5356 Bbl | 376280 | CalFrac | STAGE 15 |
2013-07-24 | H2O | 0 | 7775 Bbl | 370000 | CalFrac | Calfrac is the frac service provider |
2013-07-21 | H2O | 15 | 5710 Bbl | 347190 | CalFrac | STAGE 3 |
2013-07-22 | H2O | 15 | 4933 Bbl | 349730 | CalFrac | STAGE 6 |
2013-07-22 | H2O | 15 | 6415 Bbl | 371090 | CalFrac | STAGE 9 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CNX GAS COMPANY LLC | Brine | 9050 | 104 |
2014 | CNX GAS COMPANY LLC | Brine | 14397 | 272 |
2015 | CNX GAS COMPANY LLC | Brine | 7730 | 361 |
2016 | CNX GAS COMPANY LLC | Brine | 4482 | 358 |
2017 | CNX GAS COMPANY LLC | Brine | 3188 | 359 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 2041 | 327 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 483 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-201465745 | 2013-4-25 0:00: | DD | No Violations | 2.00 |
-696207656 | 2013-11-19 0:00 | PL | No Violations | 0.50 |
0201465745 | 2013-04-25 | Drill / Deepen / Reopen | No Violations | My inspection today finds the well has been drilled to a total depth of 14355. |
0295375332 | 2013-04-05 | Drill / Deepen / Reopen | No Violations | The well operator has attempted to open hole squeeze cement in order to stop fluid loss. They are currently waiting on the cement to cure. If this does not work they will run a 7 liner and slim hole the remainder of the well. |
0325972121 | 2018-09-20 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was equipped with a Cameron production tree style wellhead with a plunger lift system. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of three sand traps, three gas production units, one horizontal heater treater, one indirect line heater, six 400-barrel tanks, one horizontal vent scrubber, and one combustor. The identification stated CNX Gas Company. Ascent will have 60 days after the transfer date to post identification. |
0385858107 | 2013-01-04 | Drill / Deepen / Reopen | No Violations | My inspection today finds the operator ran 1616 of 13.375 casing. Cal-frac is on site to cement the pipe in place. |
0412718743 | 2013-01-14 | Drill / Deepen / Reopen | No Violations | My inspection today finds the well has been drilled to a depth of 6800. The casing crew is currently running 9.625 casing. They intend to run 6769 of casing. |
0485473766 | 2017-08-24 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was equipped with a Cameron production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge reads 0 pounds per square inch on the annulus between the 5.5 inch diameter production casing and the 9.625 inch diameter intermediate casing. A gauge reads 0 pounds per square inch on the annulus between the 9.625 inch diameter intermediate casing and the 13.375 inch diameter intermediate casing. The production equipment consisted of six 400 barrel tanks within steel line containment. A vapor recovery system to capture tank vapors consisted of one vent scrubber and one combustor. Three sand traps, three gas production units, one horizontal heater treater, and one indirect line heater were located on the east side of the pad. The identification was located at the wellhead. |
0696207656 | 2013-11-19 | Preliminary Restoration | No Violations | The well site meets the preliminary restoration criteria. |
0760780691 | 2013-11-19 | Preliminary Restoration | No Violations | The well site meets the preliminary restoration criteria. |
1356917661 | 2012-12-30 | Drill / Deepen / Reopen | No Violations | I am on site to witness the 20 surface casing be cemented in place. Cal-Frac is on site to cement 307 of casing in place by circulation. |
1358960294 | 2013-01-23 | Drill / Deepen / Reopen | No Violations | My inspection today finds Baker Hughes is on site to set the pilot hole plug. Baker Hughes pumped 664 sks of type H cement to plug the hole back into the 9.625 casing. |
1375217725 | 2013-07-24 | Completion Testing | No Violations | I am onsite to witness the hydraulic fracturing activities. The average treatment pressure was 8312 psi. at an average rate of 91 bbl. A total of 370000 pounds of sand were used. |
1452429979 | 2017-01-23 | Production Wells | No Violations | The purpose of my inspection today is a status check on a producing well. There are three wells on this pad and the pad is named NBL 11. During my inspection the well is equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, three gas processing units, one vertical heater treater, and one fire tube reboiler. The vapor recovery system consists of one horizontal separator and one combustor. The production records are current, the identification is located by the wellhead, and there are no violations present. |
1971751461 | 2013-06-20 | Completion Testing | No Violations | My inspection today finds Horizontal Wire Line Service is on site to set plugs and perforate the first stage of the well. Perforations were placed at 14,206, 14,203, 14.173, 14,165, 14,128, and 14,090. |
295375332 | 2013-4-5 0:00:0 | DD | No Violations | 2.00 |
325972121 | 2018-9-20 0:00: | PW | No Violations | 0.10 |
385858107 | 2013-1-4 0:00:0 | DD | No Violations | 5.00 |
412718743 | 2013-1-14 0:00: | DD | No Violations | 2.00 |
485473766 | 2017-8-24 0:00: | PW | No Violations | 1.00 |
760780691 | 2013-11-19 0:00 | PL | No Violations | 0.50 |
For data sources see[7]