34-121-24395

Well Details

Well ID: 34-121-24395
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Center Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000570
Farm/Lease Name: SCHROEDER UNIT
License Status: Not Drilled
License Date: 2012-11-23
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 39.820000
Longitude: -81.450000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-11-23 Proposed Formations:POINT PLEASANT-BLACK RIVER, Issued Date:11/23/2012, Expired Date:11/23/2014 12:00:00 PM, Drilling unit acres:164, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-12-14 CORRECTION TO SURFACE FOOTAGE.
Construction Permit Expires 2014-11-23
Record Last Modified 2018-11-01

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1244788505 2013-06-26 Drill / Deepen / Reopen No Violations I was asked by Antero employee Sam Meyers to review the site to see if the vegetation was substantial enough to remove the super silt fence. All but a portion of the location can have the fence removed.
1296434153 2013-01-03 Drill / Deepen / Reopen No Violations My inspection today finds that work on the location is proceeding. The location has been built and is currently awaiting stone. There were a couple of silt fence sections that have fallen down, I will ask the company to repair those.
1533817967 2018-08-08 Not Drilled No Violations On location today meeting with ODNR Engineering Section and Antero Resources to discuss pad restoration. The drilling permit expired 11/23/14 and Antero has decided not to spud the well and to partially restore the pad. The fresh water impoundment located on the East side of the pad will be drained, the liner will be pulled, and the ground restored. The cut slope that has slipped 1.5 feet will be fixed. ODNR Engineering section will oversee the restoration process and Antero hopes to utilize a landowner waiver to leave the pad at existing grade.

For data sources see[3]