If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24396 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.83,"lon":-81.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Marion Township | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: US-OH-000522 | |
Farm/Lease Name: RESERVE COAL PROPERTIES CO | |
License Status: Plugged Back | |
License Date: 2012-11-27 | |
Spud Date: 2013-04-24 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.830000 | |
Longitude: -81.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-11-27 | Proposed Formations:TRENTON, Issued Date:11/27/2012, Expired Date:11/27/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Correction to Well | 2012-12-14 | CORRECTION TO FOOTAGE. |
Construction Permit Expires | 2014-11-27 | UPDATED STATUS FROM PR TO PB. 34121243960100 IS PRODUCING. |
Record Last Modified | 2019-05-14 | UPDATED STATUS FROM PR TO PB. 34121243960100 IS PRODUCING. |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/07/2014 | 03/16/2014 | 7934 | 21,142,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 20/40 - Premium | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 2.93024 | 6,373,310.0 |
MC MX 109-2 | Halliburton | Scale Inhibitor | Sodium bisulfite | 7631-90-5 | 5 | 0.000706203 | 1536 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 91.2871 | 198,550,000.0 | |
BE-9W | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.0019885 | 4325 | |
LCA-1 | Halliburton | Solvent | Paraffinic solvent | Confidential | 100 | 0.000675859 | 1470 | |
CALCIUM CHLORIDE - FLAKE | Halliburton | Additive | Sodium chloride | 7647-14-5 | 2 | 0.000126896 | 276 | |
Calcium chloride | 10043-52-4 | 100 | 0.0063448 | 13800 | ||||
Potassium chloride | 7447-40-7 | 5 | 0.00031724 | 690 | ||||
FE ACID - >10% HCL | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 30 | 0.32702 | 711273 | |
AI-150 | Reef Services, LLC | Acid Inhibitor | Propargyl Alcohol | 107-19-7 | 5 | 0.00008322 | 181 | |
Isopropanol | 67-63-0 | 5 | 0.00008322 | 181 | ||||
Methanol | 67-56-1 | 90 | 0.00149884 | 3260 | ||||
Xylene | 1330-20-7 | 10 | 0.000166436 | 362 | ||||
Isooctyl Alcohol Bottoms | 68526-88-5 | 10 | 0.000166436 | 362 | ||||
Other Ingredient(s) | Strontium chloride | 10476-85-4 | 0 | 0.00031724 | 690 | |||
Acetic anhydride | 108-24-7 | 0 | 0.00108965 | 23710 | ||||
Sodium polyacrylate | 9003-04-7 | 0 | 0.00423814 | 9218 | ||||
Water | 7732-18-5 | 0 | 1.19037 | 2,589,070.0 | ||||
Citric acid | 77-92-9 | 0 | 0.00108965 | 23710 | ||||
Fatty acid ester | Confidential | 0 | 0.00947122 | 20600 | ||||
Sodium hydroxide | 1310-73-2 | 0 | 0.00000138 | 3 | ||||
Polyacrylate | Confidential | 0 | 0.0568268 | 123599 | ||||
Acetic acid | 64-19-7 | 0 | 0.00108965 | 23710 | ||||
Propylene glycol | 57-55-6 | 0 | 0.0119301 | 25948 | ||||
Inorganic salt | Confidential | 0 | 0.0189424 | 41200 | ||||
PermVis VFR-10 | Halliburton | Friction Reducer | 9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.00947122 | 20600 | |
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0568268 | 123599 | ||||
Ammonium chloride | 12125-02-9 | 10 | 0.0189424 | 41200 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 10 | 0.0189424 | 41200 | ||||
FE-2A | Halliburton | Additive | Citric acid | 77-92-9 | 60 | 0.00756594 | 16456 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Acetic anhydride | 108-24-7 | 100 | 0.0109402 | 23795 | |
Acetic acid | 64-19-7 | 60 | 0.00656411 | 14277 | ||||
40/70 - Premium White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 4.43695 | 9,650,420.0 |
For data sources see[3]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CNX GAS COMPANY LLC | Brine | 23358 | 126 |
2015 | CNX GAS COMPANY LLC | Brine | 14157 | 353 |
2016 | CNX GAS COMPANY LLC | Brine | 10763 | 355 |
2017 | CNX GAS COMPANY LLC | Brine | 7165 | 365 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 4711 | 334 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 1180 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1151823910 | 2015-4-7 0:00:0 | PW | No Violations | 5.00 |
-1468511625 | 2014-5-19 0:00: | PL | No Violations | |
-1705946074 | 2014-8-6 0:00:0 | PL | No Violations | 1.00 |
-342515702 | 2013-4-27 0:00: | CS | No Violations | 5.50 |
-439894221 | 2013-4-24 0:00: | CS | No Violations | 5.00 |
-456090048 | 2016-3-21 0:00: | PW | No Violations | 1.00 |
-636906515 | 2018-3-8 0:00:0 | PW | No Violations | 0.50 |
-951115460 | 2013-7-31 0:00: | DD | No Violations | 2.00 |
0313424924 | 2014-02-10 | Completion Testing | No Violations | My inspection today finds Halliburton is pumping one bbl per minute due to a screen out. The pump pressure is averaging 9000 pounds. This is the forth stage of the well. |
0342515702 | 2013-04-27 | Casing String Witnessed | No Violations | My inspection today finds the drilling contractor has drilled the well to a depth of 347. The rig ran 322 of 20 j-55 casing and cemented it in place with 566 sks of class A cement. |
0439894221 | 2013-04-24 | Casing String Witnessed | No Violations | My inspection today finds the drilling contractor ran 30 conductor to a depth of 126. Baker Hughes cemented the casing in place with 312 sks of class A cement. |
0456090048 | 2016-03-21 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of eight 400 barrel tanks set in a plastic lined steel containment system. A large compressor is set on location and is in operation at the time of inspection. |
0517361761 | 2013-03-22 | Drill / Deepen / Reopen | No Violations | My inspection today finds the well site is currently under construction. All erosion controls are in place as per the pre-site review. |
0584758754 | 2017-04-06 | Production Wells | No Violations | The pad is named NBL 19 and it consists of 3 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 620 pounds per square inch on the casing and 330 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consisted of three sand traps, three gas production units, eight 400 barrel tanks, and one combustor. Identification was present and production records were current. |
0636906515 | 2018-03-08 | Production Wells | No Violations | The pad is named NBL 19 and it consists of 3 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of three sand traps, three gas production units, one vertical heater treater, one reboiler, seven 400 barrel tanks, 2 vapor recovery towers, and one combustor. The pipeline tie in was located on the south side of the pad. |
0951115460 | 2013-07-31 | Drill / Deepen / Reopen | No Violations | The drilling rig has drilled a 12.25 hole to a depth of 7300. They are preparing to run 7258 of 9.625 casing. The stage cement tool will be set at 4500. |
1151823910 | 2015-04-07 | Production Wells | No Violations | At the time of my inspection, Sunpro, Force, and TK Gas Services are providing cleanup services. Nearly all free product has been removed from the inside the containment. A revised volume of the release will be forthcoming as displacement for tanks and pea gravel were not taken into account in the initial calculation. One foot of water has been placed into the containment to float any product trapped in the pea gravel. A crew is using booms to sweep the remaining product to one end of containment where a Force vac. Truck is skimming it off of the water. Once nothing is left but a sheen, an oil degrader will be added and allowed time to work. There is no sign of hydrocarbons outside of the containment. |
1211266233 | 2019-7-30 0:00: | PW | No Violations | 1.00 |
1376915803 | 2013-08-12 | Drill / Deepen / Reopen | No Violations | My inspection today finds the well is at a depth of 11,190. The operator is currently drilling ahead to an estimated depth of 17925. |
1459403398 | 2019-7-30 0:00: | PL | No Violations | 0.50 |
1468511625 | 2014-05-19 | Preliminary Restoration | No Violations | I am accompanied by Austin Gutridge. Our inspection today finds the well site meets the preliminary restoration requirements of 1509.072. |
1474635741 | 2015-04-06 | Production Wells | No Violations | At 6:32pm I received a telephone call from Jon Andrusik indicating that a 100 barrel condensate release took place at the NBL 19 production facility and that all condensate was in secondary containment. My inspection finds the source of the spill was an open valve on the loading manifold. The site is under video surveillance and a more definitive explanation of how the valve was left open will be forthcoming. Sunpro is onsite with a vac. Truck and two additional trucks in route. The plan moving forward is to remove all free product with the vac truck and then begin bringing fresh water in and flush the inside of containment. All water recovered during the process will be put back into the production tanks and later hauled to an injection well. I have requested that CNX sample the area around the lower end of containment and continue monitor the soil around the containment for signs of hydrocarbons. At this time, there is no reason to believe the that the product has left the secondary containment. All wells are shut in and the clean-up has been suspended until an electrical storm in the area has cleared. |
1514599109 | 2019-1-3 0:00:0 | PW | No Violations | 0.50 |
1705946074 | 2014-08-06 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements. The well is currently in production. The tank battery is comprised of eight 410 barrel tanks. |
1937703950 | 2014-05-19 | Preliminary Restoration | No Violations | I am accompanied by Austin Gutridge. Our inspection today finds the well site meets the preliminary restoration requirements of 1509.072. |
313424924 | 2014-2-10 0:00: | CT | No Violations | 0.50 |
517361761 | 2013-3-22 0:00: | DD | No Violations | 2.00 |
584758754 | 2017-4-6 0:00:0 | PW | No Violations | 0.50 |
For data sources see[6]