If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24427 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-81.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000520 | |
Farm/Lease Name: SCHEETZ UNIT | |
License Status: Producing | |
License Date: 2013-06-10 | |
Spud Date: 2013-10-01 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2013-12-01 | |
Well Total Depth: 16046.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -81.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-10 | Proposed Formations:POINT PLEASANT, Issued Date:6/10/2013, Expired Date:6/10/2015 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-12-01 | |
Correction to Well | 2013-12-06 | CHANGE IN PROPOSED TOTAL DEPTH. |
Correction to Well | 2014-01-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 428.049 ACRES. |
Completion Report Received | 2014-05-27 | |
Construction Permit Expires | 2015-06-10 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-12 | 10000 | 15956 | 0 |
10000 | 15956 | 0 | |
10000 | 15956 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/10/2014 | 01/21/2014 | 7402 | 8,946,880.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexaid 673 | Chemplex | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 25 | 0.00393 | 0 |
Water | 7732-18-5 | 85 | 0.01335 | 0 | ||||
Sodium Salt of Phosphonodimethylated Diamine | Proprietary | 5 | 0.00079 | 0 | ||||
Freshwater | Antero Resources | Water | Water | 7732-18-5 | 100 | 90.709 | 0 | |
Plexcide 15G | Chemplex | Biocide | Water | 7732-18-5 | 90 | 0.02285 | 0 | |
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.00076 | 0 | ||||
Glutaraldehyde | 111-30-8 | 14 | 0.00355 | 0 | ||||
Alkyl Dimethyl Benzyl Ammonium Chloride | 68424-85-1 | 3 | 0.00076 | 0 | ||||
Ethanol | 64-17-5 | 3 | 0.00076 | 0 | ||||
40/70 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 4.9144 | 0 | |
Beta M-4.0 | PQS | Guar Gel | Clay | 1302-78-9 | 5 | 0.00425 | 0 | |
Guar Gum | 9000-30-0 | 50 | 0.04252 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.04677 | 0 | ||||
Surfactant | 154518-36-2 | 1 | 0.00085 | 0 | ||||
20/40 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 2.9237 | 0 | |
Hydrochloric Acid 10-15% | Reagent | Acid | Hydrchloric Acid | 7647-01-0 | 15 | 0.03424 | 0 | |
Plexslick 953 | Chemplex | Friction Reducer | Alcohol Ethoxylate Surfactants | Proprietary | 8 | 0.00492 | 0 | |
Hydrotreated Petroleum Distillate | 64742-47-8 | 30 | 0.01844 | 0 | ||||
Water | 7732-18-5 | 35 | 0.02152 | 0 | ||||
Polyacrylamide-co-acrylic acid | 9003-06-9 | 32 | 0.01967 | 0 | ||||
Sodium Persulfate | Chemplex | Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00123 | 0 | |
100 Mesh | US Silica | Propppant | Sand | 14808-60-7 | 100 | 1.2677 | 0 | |
Plexhib 256 | Chemplex | Corrosion | n-olefins | Proprietary | 10 | 0.00007000 | 0 | |
Alcohol Ethoxylate Surfactants | Proprietary | 30 | 0.00021 | 0 | ||||
Methyl Alcohol | 67-56-1 | 70 | 0.00049 | 0 | ||||
thiourea-formaldehyde copolymer | 68527-49-1 | 30 | 0.00021 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 8 | 0.00006000 | 0 | ||||
Plexbreak 145 | Chemplex | Non-emulsifier | Water | 732-18-5 | 66 | 0.00052 | 0 | |
Ethylene Glycol Monobutyl Ether | 111-76-2 | 15 | 0.00012 | 0 | ||||
Diethanolamine | 111-42-2 | 5 | 0.00004000 | 0 | ||||
Cocamide Diethanolamine Salt | 68603-42-9 | 10 | 0.00008000 | 0 | ||||
Methyl Alcohol | 67-56-1 | 15 | 0.00012 | 0 | ||||
Ferriplex 66 | Chemplex | Iron Control | Water | 7732-18-5 | 35 | 0.00016 | 0 | |
Acetic Acid | 64-19-7 | 50 | 0.00022 | 0 | ||||
Citric Acid | 77-92-9 | 30 | 0.00013 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-01-17 | H2O | 15 | 3842 Bbl | 143693 | Go Frac LLC | STAGE 22
60 SHOTS |
2014-01-19 | H2O | 15 | 5080 Bbl | 239778 | Go Frac LLC | STAGE 28
60 SHOTS |
2014-01-14 | H2O | 15 | 4350 Bbl | 238944 | Go Frac LLC | STAGE 11
60 SHOTS |
2014-01-13 | H2O | 15 | 4377 Bbl | 243052 | Go Frac LLC | STAGE 10
60 SHOTS |
2014-01-20 | H2O | 15 | 4864 Bbl | 243537 | Go Frac LLC | STAGE 31
60 SHOTS |
2014-01-15 | H2O | 15 | 4434 Bbl | 243570 | Go Frac LLC | STAGE 15
60 SHOTS |
2014-01-12 | H2O | 15 | 4401 Bbl | 242282 | Go Frac LLC | STAGE 6
60 SHOTS |
2014-01-12 | H2O | 15 | 4349 Bbl | 235104 | Go Frac LLC | STAGE 7
60 SHOTS |
2014-01-16 | H2O | 15 | 4534 Bbl | 241543 | Go Frac LLC | STAGE 21
60 SHOTS |
2014-01-20 | H2O | 15 | 4351 Bbl | 244150 | Go Frac LLC | STAGE 32
60 SHOTS |
2014-01-13 | H2O | 15 | 4437 Bbl | 239828 | Go Frac LLC | STAGE 8
60 SHOTS |
2014-01-14 | H2O | 15 | 4419 Bbl | 241724 | Go Frac LLC | STAGE 14
60 SHOTS |
2014-01-14 | H2O | 15 | 4408 Bbl | 242607 | Go Frac LLC | STAGE 13
60 SHOTS |
2014-01-17 | H2O | 15 | 4507 Bbl | 243311 | Go Frac LLC | STAGE 25
60 SHOTS |
2014-01-15 | H2O | 15 | 4511 Bbl | 241602 | Go Frac LLC | STAGE 18
60 SHOTS |
2014-01-15 | H2O | 15 | 4593 Bbl | 262676 | Go Frac LLC | STAGE 17
60 SHOTS |
2014-01-20 | H2O | 15 | 4428 Bbl | 244381 | Go Frac LLC | STAGE 29
60 SHOTS |
2014-01-17 | H2O | 15 | 4478 Bbl | 183502 | Go Frac LLC | STAGE 23
60 SHOTS |
2014-01-16 | H2O | 15 | 4526 Bbl | 242661 | Go Frac LLC | STAGE 20
60 SHOTS |
2014-01-12 | H2O | 15 | 4465 Bbl | 243127 | Go Frac LLC | STAGE 4
60 SHOTS |
2014-01-14 | H2O | 15 | 4384 Bbl | 242416 | Go Frac LLC | STAGE 12
60 SHOTS |
2014-01-19 | H2O | 15 | 4486 Bbl | 245382 | Go Frac LLC | STAGE 27
60 SHOTS |
2014-01-19 | H2O | 15 | 4472 Bbl | 241699 | Go Frac LLC | STAGE 26
60 SHOTS |
2014-01-21 | H2O | 15 | 4363 Bbl | 244437 | Go Frac LLC | STAGE 33
60 SHOTS |
2014-01-17 | H2O | 15 | 4473 Bbl | 241902 | Go Frac LLC | STAGE 24
60 SHOTS |
2014-01-16 | H2O | 15 | 4172 Bbl | 194268 | Go Frac LLC | STAGE 19
60 SHOTS |
2014-01-11 | H2O | 15 | 3866 Bbl | 170460 | Go Frac LLC | STAGE 3
60 SHOTS |
2014-01-20 | H2O | 15 | 4852 Bbl | 230896 | Go Frac LLC | STAGE 30
60 SHOTS |
2014-01-10 | H2O | 15 | 3924 Bbl | 241325 | Go Frac LLC | STAGE 1
60 SHOTS |
2014-01-12 | H2O | 15 | 4175 Bbl | 184402 | Go Frac LLC | STAGE 5
60 SHOTS |
2014-01-21 | H2O | 15 | 4656 Bbl | 219530 | Go Frac LLC | STAGE 34
60 SHOTS |
2014-01-11 | H2O | 15 | 6172 Bbl | 242264 | Go Frac LLC | STAGE 2
60 SHOTS |
2014-01-15 | H2O | 15 | 4390 Bbl | 244124 | Go Frac LLC | STAGE 16
60 SHOTS |
2014-01-13 | H2O | 15 | 4360 Bbl | 241960 | Go Frac LLC | STAGE 9
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 759989 | 73399 | 309 |
2015 | ANTERO RESOURCES CORPORATION | 298729 | 21167 | 364 |
2016 | ANTERO RESOURCES CORPORATION | 204155 | 10739 | 326 |
2017 | ANTERO RESOURCES CORPORATION | 174239 | 9236 | 363 |
2018 | ANTERO RESOURCES CORPORATION | 118252 | 8815 | 344 |
2019 | ANTERO RESOURCES CORPORATION | 26660 | 1979 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 27037 | 309 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 3615 | 364 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 1931 | 326 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 1835 | 363 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2350 | 344 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 429 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1317197109 | 2013-10-10 0:00 | DD | No Violations | 1.00 |
-1318523816 | 2017-1-11 0:00: | PW | No Violations | 0.10 |
-1504067592 | 2020-7-7 0:00:0 | PW | No Violations | 0.30 |
-1579191763 | 2016-7-14 0:00: | PW | No Violations | 0.50 |
-1642404589 | 2013-12-10 0:00 | DD | No Violations | 2.00 |
-1826724708 | 2019-9-13 0:00: | PW | No Violations | 0.50 |
-259719860 | 2013-10-2 0:00: | CS | No Violations | 2.00 |
-370474653 | 2016-3-21 0:00: | PW | No Violations | 0.50 |
-729544416 | 2017-11-7 0:00: | PW | No Violations | 0.50 |
-864035787 | 2018-6-12 0:00: | PW | No Violations | 0.20 |
0088555133 | 2017-06-07 | Production Wells | No Violations | The purpose of my inspection was a status check on a producing well. The pad is named Wayne and there are a total of five wells on this pad. During my inspection the well was equipped with a production tree style wellhead and a plunger lift system with production valves in the open position. Gauges present read 380 pounds per square inch on the casing and 180 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consists of eight 400 barrel tanks within a lined steel containment, five gas production units within a lined steel containment, one compressor, and two combustors. The pipeline tie in is located on the north side of the pad. The production records are current, the identification is located at the wellhead and gas production unit, and there are no violations present. |
0258043049 | 2014-03-31 | Production Wells | No Violations | My inspection finds the well appears capable of production. Identification is posted in accordance with 1501.9-9-05(A)10. The tank battery is comprised of twenty 400 bbl tanks located in secondary containment. The tanks are shared by four other wells on the site. The road is well maintained. |
0259719860 | 2013-10-02 | Casing String Witnessed | No Violations | My inspection today finds Express ran 100 of 26 casing. Allied cemented the casing in place with 60 bbl of class A cement. Good returns to surface. |
0370474653 | 2016-03-21 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad. |
0410296972 | 2014-03-07 | Preliminary Restoration | No Violations | My inspection finds the well site meets the requirements for 1509.072 preliminary restoration. Identification is posted in accordance with 1501.9-9-05(A)10. The tank battery is comprised of twenty 400 bbl tanks located in secondary containment. |
0729544416 | 2017-11-07 | Production Wells | No Violations | The purpose of my inspection was a status check on a producing well. The pad is named Wayne and there are a total of five wells on this pad. During my inspection the well was equipped with a production tree style wellhead and a plunger lift system with production valves in the open position. The production equipment consists of eight 400 barrel tanks within a lined steel containment, five gas production units within a lined steel containment, one compressor, and two combustors. The pipeline tie in is located on the north side of the pad. The production records are current and the identification is located at the wellhead. |
0864035787 | 2018-06-12 | Production Wells | No Violations | The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 165 pounds per square inch, 320 pounds per square inch on the production casing, 0 pounds per square inch on the 9.625 inch diameter intermediate casing, and 0 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of eight 400 barrel tanks, five gas production units, two combustors, and a Triethylene Glycol Dehydration Unit. The Triethylene Glycol Dehydration Unit had an inlet separator, a Glycol contact tower, a horizontal scrubber, and a reboiler. The identification was located at the wellhead. |
1111373064 | 2018-11-01 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.375-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 100 pounds per square inch, the 9.625-inch diameter casing had 0 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 8 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was midstream equipment on the Northern Corner of the pad. There was secondary containment around the production fluid tanks. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. Identification tags were present, and production was up to date. |
1317197109 | 2013-10-10 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is at a depth of 179. The top drive on the rig is broke down. |
1318523816 | 2017-01-11 | Production Wells | No Violations | The purpose of my inspection today is a status check on a producing well. There are five wells on this pad; 3412124400, 3412124387, 3412124389, 3412124429, and 3412124427. During my inspection the well was equipped with a production tree style wellhead. The production valves are open. The production equipment consists of five gas processing units, eight 400 barrel tanks within containment, and two flare stacks. The production records are current, identification is located on the wellhead, and there are no violations present. |
1384783441 | 2013-11-18 | Drill / Deepen / Reopen | No Violations | My inspection today finds the cement job on the 9.625 lost circulation at 340 bbl of 520 bbl total displacement. A bond log will be performed to determine the cement top. |
1385134033 | 2013-11-11 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is currently drilling a 12.25 hole at a depth of 2894. I asked the company man to install jersey barriers around the production facilities. |
1413406749 | 2013-11-18 | Drill / Deepen / Reopen | No Violations | My inspection today finds the cement top on the 9.625 casing is at 2150. The cement appears to adequate to isolate potential flow zones. |
1517493116 | 2015-04-02 | Production Wells | No Violations | I am accompanied Inspector David Ball today. Our inspection finds the well appears capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad. |
1579191763 | 2016-07-14 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad. The 9.625 casing head is equipped with a 600 psi gauge and reads 590 psi. |
1618427257 | 2013-12-16 | Drill / Deepen / Reopen | No Violations | The rig is preparing to move. I am onsite to ensure that the producing wells are shut in during the rig move. |
1642404589 | 2013-12-10 | Drill / Deepen / Reopen | No Violations | My inspection today finds Patterson Drilling is drilling an 8.5 hole at a depth of 13856. I have asked the company to review their electrical grounding practices. |
1666371859 | 2013-11-05 | Casing String Witnessed | No Violations | My inspection today finds the rig ran 370 of 18.625 casing. Allied circulated 730 sks of class A cement into place. 50 bbl cement returns to surface. |
1832558999 | 2013-11-07 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is drilling 17.5 hole at a depth of 1638. There is a significant amount of rain water accumulated on site. |
1862032708 | 2015-01-29 | Production Wells | No Violations | My inspection today finds the well is produced with a plunger lift system. The tank battery consists of eight 400 barrel tanks set in a liquid tight containment. The production facilities are shared by four other wells on the pad. No violations were noted. |
258043049 | 2014-3-31 0:00: | PW | No Violations | 0.30 |
410296972 | 2014-3-7 0:00:0 | PL | No Violations | |
705399414 | 2019-11-27 0:00 | PW | No Violations | 0.50 |
88555133 | 2017-6-7 0:00:0 | PW | No Violations | 0.10 |
For data sources see[10]